{"title":"优化运营阶段的BIM指南:基于ISO 19650定义信息需求","authors":"S. Ashworth, Michelle Dillinger, Karsten Körkemeyer","doi":"10.1108/f-08-2021-0074","DOIUrl":null,"url":null,"abstract":"\nPurpose\nThis paper aims to describe the development of guidance to help clients and operational teams to clearly define information requirements for projects using building information modelling (BIM). ISO 19650 standards highlight this as a critical first step to ensure adequate information is available to optimise built assets over their whole life cycle.\n\n\nDesign/methodology/approach\nA document analysis of existing BIM guidance supported by literature was undertaken to answer the research questions: “What guidance already exists specific to clients? and Would additional guidance help clients to better fulfil their role as the ‘appointing party’ in line with ISO 19650?”\n\n\nFindings\nA research gap was established highlighting a lack of guidance specifically aimed to help clients formulate information requirements as the appointing party. This research makes recommendations for an approach to define the requirements and support successful outcomes for BIM projects.\n\n\nPractical implications\nThis paper provides a standardised approach and a starting point for an appointing party to gather and structure information requirements in line with ISO 19650.\n\n\nOriginality/value\nThis paper considers BIM information requirements specifically from an operations perspective with a focus on the client and facility management team.\n","PeriodicalId":47595,"journal":{"name":"Facilities","volume":" ","pages":""},"PeriodicalIF":1.6000,"publicationDate":"2022-12-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"BIM guidance to optimise the operational phase: defining information requirements based on ISO 19650\",\"authors\":\"S. Ashworth, Michelle Dillinger, Karsten Körkemeyer\",\"doi\":\"10.1108/f-08-2021-0074\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\nPurpose\\nThis paper aims to describe the development of guidance to help clients and operational teams to clearly define information requirements for projects using building information modelling (BIM). ISO 19650 standards highlight this as a critical first step to ensure adequate information is available to optimise built assets over their whole life cycle.\\n\\n\\nDesign/methodology/approach\\nA document analysis of existing BIM guidance supported by literature was undertaken to answer the research questions: “What guidance already exists specific to clients? and Would additional guidance help clients to better fulfil their role as the ‘appointing party’ in line with ISO 19650?”\\n\\n\\nFindings\\nA research gap was established highlighting a lack of guidance specifically aimed to help clients formulate information requirements as the appointing party. This research makes recommendations for an approach to define the requirements and support successful outcomes for BIM projects.\\n\\n\\nPractical implications\\nThis paper provides a standardised approach and a starting point for an appointing party to gather and structure information requirements in line with ISO 19650.\\n\\n\\nOriginality/value\\nThis paper considers BIM information requirements specifically from an operations perspective with a focus on the client and facility management team.\\n\",\"PeriodicalId\":47595,\"journal\":{\"name\":\"Facilities\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2022-12-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Facilities\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/f-08-2021-0074\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Facilities","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/f-08-2021-0074","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
BIM guidance to optimise the operational phase: defining information requirements based on ISO 19650
Purpose
This paper aims to describe the development of guidance to help clients and operational teams to clearly define information requirements for projects using building information modelling (BIM). ISO 19650 standards highlight this as a critical first step to ensure adequate information is available to optimise built assets over their whole life cycle.
Design/methodology/approach
A document analysis of existing BIM guidance supported by literature was undertaken to answer the research questions: “What guidance already exists specific to clients? and Would additional guidance help clients to better fulfil their role as the ‘appointing party’ in line with ISO 19650?”
Findings
A research gap was established highlighting a lack of guidance specifically aimed to help clients formulate information requirements as the appointing party. This research makes recommendations for an approach to define the requirements and support successful outcomes for BIM projects.
Practical implications
This paper provides a standardised approach and a starting point for an appointing party to gather and structure information requirements in line with ISO 19650.
Originality/value
This paper considers BIM information requirements specifically from an operations perspective with a focus on the client and facility management team.
期刊介绍:
The journal offers thorough, independent and expert papers to inform relevant audiences of thinking and practice in the field, including topics such as: ■Intelligent buildings ■Post-occupancy evaluation (building evaluation) ■Relocation and change management ■Sick building syndrome ■Ergonomics and workplace design ■Environmental and workplace psychology ■Briefing, design and construction ■Energy consumption ■Quality initiatives ■Infrastructure management