在遥远的北方运输货物时,考虑到道路交通管理的具体特点的铁路车辆运营规划

L. S. Trofimov, S. Vakhrushev
{"title":"在遥远的北方运输货物时,考虑到道路交通管理的具体特点的铁路车辆运营规划","authors":"L. S. Trofimov, S. Vakhrushev","doi":"10.26518/2071-7296-2023-20-1-102-113","DOIUrl":null,"url":null,"abstract":"Introduction. The operation practice for the rolling stock of road transport during the transportation of goods in the harsh conditions of the Far North (Republic of Sakha (Yakutia)) shows the necessity to organize measures related to ensuring road safety on road sections with ups and downs. To prevent rolling stock from running off the road and overturning, tractor equipment is used as a tractor for road transport, the use of which is time-consuming. The purpose of this article is to develop a new theoretical toolkit for planning the work of the rolling stock, which makes it possible to determine the time spent on transportation.Materials and methods. The study uses field observations for trips, during which tractor equipment was used as a tractor for road transport on cargo transportation routes, where movement was carried out on descents and ascents.Methods of probability theory and mathematical statistics were used to determine the probability of occurrence of an event, the values of confidence intervals for the time of movement of the rolling stock, taking into account the confidence probability of 0.95. As the basis of the performed research, the scientific work of scientists on the planning of the work of the rolling stock was used, taking into account the peculiarities of the organization of road traffic during the transportation of goods in difficult operating conditions.Results. The authors determined the time spent on the transportation of goods using tractor equipment as a tractor for planning the work of IVECO-AMT 733910 С/Т rolling stock on six routes. The value of the probability of using tractor equipment on the studied routes for planning the operation of IVECO-AMT 733910C/T rolling stock has been established.Conclusions. The presented values of the movement time of the IVECO-AMT 733910 С/Т rolling stock when transporting goods using tractor equipment as a tractor can be used for practical use in planning from December to March when transporting collapsible structural elements of drilling rigs and property of drilling crews.","PeriodicalId":32892,"journal":{"name":"Vestnik SibADI","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-03-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Planning of rolling stock operation considering specific features of road traffic management when transporting goods in the Far North\",\"authors\":\"L. S. Trofimov, S. Vakhrushev\",\"doi\":\"10.26518/2071-7296-2023-20-1-102-113\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Introduction. The operation practice for the rolling stock of road transport during the transportation of goods in the harsh conditions of the Far North (Republic of Sakha (Yakutia)) shows the necessity to organize measures related to ensuring road safety on road sections with ups and downs. To prevent rolling stock from running off the road and overturning, tractor equipment is used as a tractor for road transport, the use of which is time-consuming. The purpose of this article is to develop a new theoretical toolkit for planning the work of the rolling stock, which makes it possible to determine the time spent on transportation.Materials and methods. The study uses field observations for trips, during which tractor equipment was used as a tractor for road transport on cargo transportation routes, where movement was carried out on descents and ascents.Methods of probability theory and mathematical statistics were used to determine the probability of occurrence of an event, the values of confidence intervals for the time of movement of the rolling stock, taking into account the confidence probability of 0.95. As the basis of the performed research, the scientific work of scientists on the planning of the work of the rolling stock was used, taking into account the peculiarities of the organization of road traffic during the transportation of goods in difficult operating conditions.Results. The authors determined the time spent on the transportation of goods using tractor equipment as a tractor for planning the work of IVECO-AMT 733910 С/Т rolling stock on six routes. The value of the probability of using tractor equipment on the studied routes for planning the operation of IVECO-AMT 733910C/T rolling stock has been established.Conclusions. The presented values of the movement time of the IVECO-AMT 733910 С/Т rolling stock when transporting goods using tractor equipment as a tractor can be used for practical use in planning from December to March when transporting collapsible structural elements of drilling rigs and property of drilling crews.\",\"PeriodicalId\":32892,\"journal\":{\"name\":\"Vestnik SibADI\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-03-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Vestnik SibADI\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.26518/2071-7296-2023-20-1-102-113\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Vestnik SibADI","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26518/2071-7296-2023-20-1-102-113","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

介绍。在遥远的北方(萨哈共和国(雅库特))恶劣条件下运输货物的道路运输车辆的操作实践表明,有必要组织有关措施,确保起伏路段的道路安全。为防止机车车辆冲出路面、翻车,采用牵引车设备作为道路运输的牵引车,使用时间较长。本文的目的是开发一个新的理论工具来规划铁路车辆的工作,这使得确定运输时间成为可能。材料和方法。这项研究对旅行进行实地观察,在此期间,拖拉机设备被用作货物运输路线上的公路运输拖拉机,在下降和上升时进行移动。采用概率论和数理统计的方法,考虑置信概率为0.95,确定事件发生的概率,即机车车辆运动时间的置信区间值。考虑到在困难作业条件下货物运输过程中道路交通组织的特殊性,利用科学家关于车辆工作规划的科学工作作为进行研究的基础。作者确定了使用拖拉机设备作为拖拉机运输货物所花费的时间,以规划IVECO-AMT 733910 С/Т轨道车辆在六条路线上的工作。建立了依维柯- amt 733910C/T机车车辆在研究路线上使用拖拉机设备的概率值。给出的IVECO-AMT 733910 С/Т机车车辆在使用拖拉机设备作为牵引车运输货物时的运动时间,可用于12月至3月运输钻机可折叠结构部件和钻井队财产时的实际规划。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Planning of rolling stock operation considering specific features of road traffic management when transporting goods in the Far North
Introduction. The operation practice for the rolling stock of road transport during the transportation of goods in the harsh conditions of the Far North (Republic of Sakha (Yakutia)) shows the necessity to organize measures related to ensuring road safety on road sections with ups and downs. To prevent rolling stock from running off the road and overturning, tractor equipment is used as a tractor for road transport, the use of which is time-consuming. The purpose of this article is to develop a new theoretical toolkit for planning the work of the rolling stock, which makes it possible to determine the time spent on transportation.Materials and methods. The study uses field observations for trips, during which tractor equipment was used as a tractor for road transport on cargo transportation routes, where movement was carried out on descents and ascents.Methods of probability theory and mathematical statistics were used to determine the probability of occurrence of an event, the values of confidence intervals for the time of movement of the rolling stock, taking into account the confidence probability of 0.95. As the basis of the performed research, the scientific work of scientists on the planning of the work of the rolling stock was used, taking into account the peculiarities of the organization of road traffic during the transportation of goods in difficult operating conditions.Results. The authors determined the time spent on the transportation of goods using tractor equipment as a tractor for planning the work of IVECO-AMT 733910 С/Т rolling stock on six routes. The value of the probability of using tractor equipment on the studied routes for planning the operation of IVECO-AMT 733910C/T rolling stock has been established.Conclusions. The presented values of the movement time of the IVECO-AMT 733910 С/Т rolling stock when transporting goods using tractor equipment as a tractor can be used for practical use in planning from December to March when transporting collapsible structural elements of drilling rigs and property of drilling crews.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
61
审稿时长
8 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信