{"title":"铁路路堤用砂柱路基土的改良:以实例为例","authors":"B. Abbas, Talib K. Q. Alsheakayree, Hussain M. Ashour Al Khuzaie, H. Sultan","doi":"10.1556/606.2023.00818","DOIUrl":null,"url":null,"abstract":"A railway on 4 m height embankment is being built in the south of Iraq. The railway alignment is extending on a compressible soil experienced impermissible settlement according to the results of soil investigation of the soil at the project site. A trial for reducing the settlement was done adopting sand piles. Nonlinear analysis was conducted to evaluate the settlement of soil before and after using the proposed technique.The results indicated that without any improvement, the expected total settlement of the railway embankment on the compressible clay layer is 170.2 mm. By inserting granular piles of diameter 0.3 m, it was obtained settlement decreases to 88.7 mm with reduction being in range of ∼48%.","PeriodicalId":35003,"journal":{"name":"Pollack Periodica","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-07-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Improvement of subgrade soil with sand columns for construction railway embankment: A case study\",\"authors\":\"B. Abbas, Talib K. Q. Alsheakayree, Hussain M. Ashour Al Khuzaie, H. Sultan\",\"doi\":\"10.1556/606.2023.00818\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A railway on 4 m height embankment is being built in the south of Iraq. The railway alignment is extending on a compressible soil experienced impermissible settlement according to the results of soil investigation of the soil at the project site. A trial for reducing the settlement was done adopting sand piles. Nonlinear analysis was conducted to evaluate the settlement of soil before and after using the proposed technique.The results indicated that without any improvement, the expected total settlement of the railway embankment on the compressible clay layer is 170.2 mm. By inserting granular piles of diameter 0.3 m, it was obtained settlement decreases to 88.7 mm with reduction being in range of ∼48%.\",\"PeriodicalId\":35003,\"journal\":{\"name\":\"Pollack Periodica\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-07-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Pollack Periodica\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1556/606.2023.00818\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Pollack Periodica","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1556/606.2023.00818","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

摘要

4号线的铁路 伊拉克南部正在修建高m的堤坝。根据项目现场土壤调查结果,铁路线形在经历不允许沉降的可压缩土壤上延伸。采用砂桩进行了减少沉降的试验。采用所提出的技术对前后土体的沉降进行了非线性分析。结果表明,在没有任何改善的情况下,可压缩粘土层上铁路路堤的预期总沉降为170.2 mm。通过插入直径为0.3的颗粒桩 m、 沉降量降至88.7 mm,减小范围为~48%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Improvement of subgrade soil with sand columns for construction railway embankment: A case study
A railway on 4 m height embankment is being built in the south of Iraq. The railway alignment is extending on a compressible soil experienced impermissible settlement according to the results of soil investigation of the soil at the project site. A trial for reducing the settlement was done adopting sand piles. Nonlinear analysis was conducted to evaluate the settlement of soil before and after using the proposed technique.The results indicated that without any improvement, the expected total settlement of the railway embankment on the compressible clay layer is 170.2 mm. By inserting granular piles of diameter 0.3 m, it was obtained settlement decreases to 88.7 mm with reduction being in range of ∼48%.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Pollack Periodica
Pollack Periodica Engineering-Civil and Structural Engineering
CiteScore
1.50
自引率
0.00%
发文量
82
期刊介绍: Pollack Periodica is an interdisciplinary, peer-reviewed journal that provides an international forum for the presentation, discussion and dissemination of the latest advances and developments in engineering and informatics. Pollack Periodica invites papers reporting new research and applications from a wide range of discipline, including civil, mechanical, electrical, environmental, earthquake, material and information engineering. The journal aims at reaching a wider audience, not only researchers, but also those likely to be most affected by research results, for example designers, fabricators, specialists, developers, computer scientists managers in academic, governmental and industrial communities.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信