管理船厂项目的挑战

IF 0.7 4区 工程技术 Q4 ENGINEERING, MARINE
Kenneth Fisher
{"title":"管理船厂项目的挑战","authors":"Kenneth Fisher","doi":"10.5750/ijme.v163ia4.794","DOIUrl":null,"url":null,"abstract":"Shipyard projects involving ship construction, repair, conversion and modification, along with the associated design processes, involve a wide variety of contracts. Almost always multiple contracts are part of each shipyard project. Disputes often arise when potential risks within the accomplishment of the project were not adequately addressed within the project’s contracts. Also, inconsistencies between related contracts often are the core reason for disputes. The management of projects under such circumstances constitutes a significant challenge to the success of the project. This paper identifies many of those potential risks to assist in addressing them in the contracts before the project commences.","PeriodicalId":50313,"journal":{"name":"International Journal of Maritime Engineering","volume":" ","pages":""},"PeriodicalIF":0.7000,"publicationDate":"2022-04-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Challenges of Managing Shipyard Projects\",\"authors\":\"Kenneth Fisher\",\"doi\":\"10.5750/ijme.v163ia4.794\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Shipyard projects involving ship construction, repair, conversion and modification, along with the associated design processes, involve a wide variety of contracts. Almost always multiple contracts are part of each shipyard project. Disputes often arise when potential risks within the accomplishment of the project were not adequately addressed within the project’s contracts. Also, inconsistencies between related contracts often are the core reason for disputes. The management of projects under such circumstances constitutes a significant challenge to the success of the project. This paper identifies many of those potential risks to assist in addressing them in the contracts before the project commences.\",\"PeriodicalId\":50313,\"journal\":{\"name\":\"International Journal of Maritime Engineering\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.7000,\"publicationDate\":\"2022-04-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Maritime Engineering\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.5750/ijme.v163ia4.794\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, MARINE\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Maritime Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.5750/ijme.v163ia4.794","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, MARINE","Score":null,"Total":0}
引用次数: 0

摘要

造船厂项目涉及船舶建造、修理、改装和改造,以及相关的设计过程,涉及各种各样的合同。几乎总是有多份合同是每个造船厂项目的一部分。当项目合同中没有充分解决项目完成过程中的潜在风险时,往往会出现争议。此外,相关合同之间的不一致往往是引发争议的核心原因。在这种情况下对项目的管理对项目的成功构成了重大挑战。本文确定了许多潜在风险,以帮助在项目开始前在合同中解决这些风险。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Challenges of Managing Shipyard Projects
Shipyard projects involving ship construction, repair, conversion and modification, along with the associated design processes, involve a wide variety of contracts. Almost always multiple contracts are part of each shipyard project. Disputes often arise when potential risks within the accomplishment of the project were not adequately addressed within the project’s contracts. Also, inconsistencies between related contracts often are the core reason for disputes. The management of projects under such circumstances constitutes a significant challenge to the success of the project. This paper identifies many of those potential risks to assist in addressing them in the contracts before the project commences.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
1.20
自引率
0.00%
发文量
18
审稿时长
>12 weeks
期刊介绍: The International Journal of Maritime Engineering (IJME) provides a forum for the reporting and discussion on technical and scientific issues associated with the design and construction of commercial marine vessels . Contributions in the form of papers and notes, together with discussion on published papers are welcomed.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信