{"title":"底部排水巷道的理想位置研究","authors":"H. Chen, F. An, Z. Wang, X. Chen","doi":"10.17159/2411-9717/1561/2022","DOIUrl":null,"url":null,"abstract":"The bottom drainage roadway plays a crucial role in preventing coal and gas outbursts by using underground gas drainage methods. Therefore, it is essential to select the ideal position of the bottom drainage roadway. In this paper use a combination of geological data and numerical simulation to study the ideal position of the bottom drainage roadway, we taking the gas drainage of the first workface of No. 3 coal seam in the Yuxi coal mine in China as an example. The geological study showed a limestone marker layer at an average vertical distance of 14 m from the first mining face. Using this marker layer, the bottom drainage roadway could be excavated without the risk of accidentally exposing the coal seam, and less crosscutting borehole drilling from the bottom drainage roadway would be required. Based on the needs of gas control, the layout of the bottom drainage roadway was selected as an external stagger type. Combined with the numerical simulation results, when located 20 m outside of the mining workface 'footprint' on the horizontal projection, the bottom drainage roadway was a sufficient distance from the stress concentration area during mining of workface 1301, which facilitated roadway maintenance. Furthermore, the length of the crosscutting boreholes is also relatively short, which reduces the amount and cost of drilling. The results of this study are expected to provide a reference for the selection of an ideal position of the bottom drainage roadway in field engineering.","PeriodicalId":17492,"journal":{"name":"Journal of The South African Institute of Mining and Metallurgy","volume":" ","pages":""},"PeriodicalIF":0.9000,"publicationDate":"2022-06-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Study on the ideal location of a bottom drainage roadway\",\"authors\":\"H. Chen, F. An, Z. Wang, X. Chen\",\"doi\":\"10.17159/2411-9717/1561/2022\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The bottom drainage roadway plays a crucial role in preventing coal and gas outbursts by using underground gas drainage methods. Therefore, it is essential to select the ideal position of the bottom drainage roadway. In this paper use a combination of geological data and numerical simulation to study the ideal position of the bottom drainage roadway, we taking the gas drainage of the first workface of No. 3 coal seam in the Yuxi coal mine in China as an example. The geological study showed a limestone marker layer at an average vertical distance of 14 m from the first mining face. Using this marker layer, the bottom drainage roadway could be excavated without the risk of accidentally exposing the coal seam, and less crosscutting borehole drilling from the bottom drainage roadway would be required. Based on the needs of gas control, the layout of the bottom drainage roadway was selected as an external stagger type. Combined with the numerical simulation results, when located 20 m outside of the mining workface 'footprint' on the horizontal projection, the bottom drainage roadway was a sufficient distance from the stress concentration area during mining of workface 1301, which facilitated roadway maintenance. Furthermore, the length of the crosscutting boreholes is also relatively short, which reduces the amount and cost of drilling. The results of this study are expected to provide a reference for the selection of an ideal position of the bottom drainage roadway in field engineering.\",\"PeriodicalId\":17492,\"journal\":{\"name\":\"Journal of The South African Institute of Mining and Metallurgy\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.9000,\"publicationDate\":\"2022-06-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of The South African Institute of Mining and Metallurgy\",\"FirstCategoryId\":\"88\",\"ListUrlMain\":\"https://doi.org/10.17159/2411-9717/1561/2022\",\"RegionNum\":4,\"RegionCategory\":\"材料科学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Materials Science\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of The South African Institute of Mining and Metallurgy","FirstCategoryId":"88","ListUrlMain":"https://doi.org/10.17159/2411-9717/1561/2022","RegionNum":4,"RegionCategory":"材料科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Materials Science","Score":null,"Total":0}
Study on the ideal location of a bottom drainage roadway
The bottom drainage roadway plays a crucial role in preventing coal and gas outbursts by using underground gas drainage methods. Therefore, it is essential to select the ideal position of the bottom drainage roadway. In this paper use a combination of geological data and numerical simulation to study the ideal position of the bottom drainage roadway, we taking the gas drainage of the first workface of No. 3 coal seam in the Yuxi coal mine in China as an example. The geological study showed a limestone marker layer at an average vertical distance of 14 m from the first mining face. Using this marker layer, the bottom drainage roadway could be excavated without the risk of accidentally exposing the coal seam, and less crosscutting borehole drilling from the bottom drainage roadway would be required. Based on the needs of gas control, the layout of the bottom drainage roadway was selected as an external stagger type. Combined with the numerical simulation results, when located 20 m outside of the mining workface 'footprint' on the horizontal projection, the bottom drainage roadway was a sufficient distance from the stress concentration area during mining of workface 1301, which facilitated roadway maintenance. Furthermore, the length of the crosscutting boreholes is also relatively short, which reduces the amount and cost of drilling. The results of this study are expected to provide a reference for the selection of an ideal position of the bottom drainage roadway in field engineering.
期刊介绍:
The Journal serves as a medium for the publication of high quality scientific papers. This requires that the papers that are submitted for publication are properly and fairly refereed and edited. This process will maintain the high quality of the presentation of the paper and ensure that the technical content is in line with the accepted norms of scientific integrity.