{"title":"考虑离散时间成本补偿问题(DTCTP)的非支配NSGA-II遗传算法","authors":"Álvaro Julio Cuadros López, José Miguel Villota Rodríguez, José Deyson Velázquez Sánchez","doi":"10.24050/reia.v19i38.1574","DOIUrl":null,"url":null,"abstract":"Sometimes after scheduling a project, it is necessary to shorten its duration. There are many factors that force to crash the duration. Some reasons may be saving costs, early commissioning or avoiding potential risks. In this case, it is necessary to allocate more resources to activities to shorten their duration while trying to invest as little money as possible. The time–cost tradeoff problem is one important problem in project scheduling. In this study the time–cost tradeoff problem is aborded considering a discrete approach and it is solved using a non-dominated genetic algorithm. The application in a construction project identified a Pareto front that managers could use for decision making. Managers were able to analyze different scenarios to meet delivery date, costs, and scope.","PeriodicalId":21275,"journal":{"name":"Revista EIA","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-06-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Non-dominated NSGA-II genetic algorithm for schedule acceleration considering the discrete time-cost compensation problem (DTCTP) in a construction project\",\"authors\":\"Álvaro Julio Cuadros López, José Miguel Villota Rodríguez, José Deyson Velázquez Sánchez\",\"doi\":\"10.24050/reia.v19i38.1574\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Sometimes after scheduling a project, it is necessary to shorten its duration. There are many factors that force to crash the duration. Some reasons may be saving costs, early commissioning or avoiding potential risks. In this case, it is necessary to allocate more resources to activities to shorten their duration while trying to invest as little money as possible. The time–cost tradeoff problem is one important problem in project scheduling. In this study the time–cost tradeoff problem is aborded considering a discrete approach and it is solved using a non-dominated genetic algorithm. The application in a construction project identified a Pareto front that managers could use for decision making. Managers were able to analyze different scenarios to meet delivery date, costs, and scope.\",\"PeriodicalId\":21275,\"journal\":{\"name\":\"Revista EIA\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-06-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Revista EIA\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24050/reia.v19i38.1574\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Revista EIA","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24050/reia.v19i38.1574","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

有时,在安排项目后,有必要缩短其工期。有许多因素迫使持续时间崩溃。一些原因可能是节省成本、提前调试或避免潜在风险。在这种情况下,有必要为活动分配更多的资源,以缩短活动的持续时间,同时尽可能少地投入资金。时间-成本权衡问题是项目调度中的一个重要问题。在本研究中,考虑离散方法,中止了时间-成本权衡问题,并使用非支配遗传算法求解。该应用程序在一个建筑项目中确定了一个Pareto前沿,管理者可以使用该前沿进行决策。经理们能够分析不同的场景,以满足交付日期、成本和范围。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Non-dominated NSGA-II genetic algorithm for schedule acceleration considering the discrete time-cost compensation problem (DTCTP) in a construction project
Sometimes after scheduling a project, it is necessary to shorten its duration. There are many factors that force to crash the duration. Some reasons may be saving costs, early commissioning or avoiding potential risks. In this case, it is necessary to allocate more resources to activities to shorten their duration while trying to invest as little money as possible. The time–cost tradeoff problem is one important problem in project scheduling. In this study the time–cost tradeoff problem is aborded considering a discrete approach and it is solved using a non-dominated genetic algorithm. The application in a construction project identified a Pareto front that managers could use for decision making. Managers were able to analyze different scenarios to meet delivery date, costs, and scope.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
31
审稿时长
30 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信