在香港屯门至赤角连接海底隧道工程中,隧道掘进机刀盘介入工程采用饱和潜水技术

Q2 Engineering
A. Chan, Charles H C Yeung, A. Westmoreland, S. Fok, C. Ng, F. Guedon
{"title":"在香港屯门至赤角连接海底隧道工程中,隧道掘进机刀盘介入工程采用饱和潜水技术","authors":"A. Chan, Charles H C Yeung, A. Westmoreland, S. Fok, C. Ng, F. Guedon","doi":"10.33430/V28N1THIE-2019-0044","DOIUrl":null,"url":null,"abstract":"The entire Tuen Mun–Chek Lap Kok Link (TM-CLKL) was commissioned on 27 December 2020 and it comprises a 9km-long dual 2-lane carriageway between Tuen Mun and North Lantau, Hong Kong. Construction of the 5km-long sub-sea tunnels was carried out by two 14m diameter Tunnel Boring Machines (TBMs). The tunnel alignment for the TM-CLKL sub-sea tunnel section is in mixed ground condition with the first 500 m in mixed geology of slightly to moderately decomposed granite and completely decomposed granite (CDG), followed by soft ground condition with CDG, alluvial sand, alluvial clay and marine deposit. This mixed ground geology requires regular TBM cutterhead interventions to change the worn-out cutting tools during the tunnelling operation. As the tunnel alignment is up to 55 m below the sea level with the deepest seabed level at -21 mPD, in order to maintain the cutting face stability during the intervention, the intervention pressure could be up to 6 bars. This paper describes different techniques used for TBM interventions under the sea such as trimix bounce mode and saturation mode that appears first time in Hong Kong under a high hyperbaric pressure to change the worn-out cutting tools at the TBM cutterhead.","PeriodicalId":35587,"journal":{"name":"Transactions Hong Kong Institution of Engineers","volume":"28 1","pages":"31-38"},"PeriodicalIF":0.0000,"publicationDate":"2021-04-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Use of saturation diving technique for tunnel boring machine cutterhead intervention in the Tuen Mun–Chek Lap Kok Link Sub-sea Tunnel Project, Hong Kong\",\"authors\":\"A. Chan, Charles H C Yeung, A. Westmoreland, S. Fok, C. Ng, F. Guedon\",\"doi\":\"10.33430/V28N1THIE-2019-0044\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The entire Tuen Mun–Chek Lap Kok Link (TM-CLKL) was commissioned on 27 December 2020 and it comprises a 9km-long dual 2-lane carriageway between Tuen Mun and North Lantau, Hong Kong. Construction of the 5km-long sub-sea tunnels was carried out by two 14m diameter Tunnel Boring Machines (TBMs). The tunnel alignment for the TM-CLKL sub-sea tunnel section is in mixed ground condition with the first 500 m in mixed geology of slightly to moderately decomposed granite and completely decomposed granite (CDG), followed by soft ground condition with CDG, alluvial sand, alluvial clay and marine deposit. This mixed ground geology requires regular TBM cutterhead interventions to change the worn-out cutting tools during the tunnelling operation. As the tunnel alignment is up to 55 m below the sea level with the deepest seabed level at -21 mPD, in order to maintain the cutting face stability during the intervention, the intervention pressure could be up to 6 bars. This paper describes different techniques used for TBM interventions under the sea such as trimix bounce mode and saturation mode that appears first time in Hong Kong under a high hyperbaric pressure to change the worn-out cutting tools at the TBM cutterhead.\",\"PeriodicalId\":35587,\"journal\":{\"name\":\"Transactions Hong Kong Institution of Engineers\",\"volume\":\"28 1\",\"pages\":\"31-38\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-04-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Transactions Hong Kong Institution of Engineers\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33430/V28N1THIE-2019-0044\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Transactions Hong Kong Institution of Engineers","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33430/V28N1THIE-2019-0044","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

摘要

整个屯门至赤?角连接路于2020年12月27日启用,包括一条长9公里的双程双线行车线,连接香港屯门及北大屿山。5公里长的海底隧道由两台直径14米的隧道掘进机(TBM)进行施工。TM-CLKL海底隧道段的隧道线形处于混合地面条件下,前500米为轻度至中度风化花岗岩和完全风化花岗岩(CDG)的混合地质,其次为CDG、冲积砂、冲积粘土和海洋沉积物的软地面条件。这种混合地面地质需要定期TBM刀盘干预,以在隧道施工期间更换磨损的切割工具。由于隧道定线位于海平面以下55 m处,最深海底水位为-21 mPD,为了在干预期间保持切割面的稳定性,干预压力可能高达6 bar。本文介绍了在香港首次在高压下出现的用于更换TBM刀盘磨损刀具的三元弹动模式和饱和模式等不同的海上TBM干预技术。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Use of saturation diving technique for tunnel boring machine cutterhead intervention in the Tuen Mun–Chek Lap Kok Link Sub-sea Tunnel Project, Hong Kong
The entire Tuen Mun–Chek Lap Kok Link (TM-CLKL) was commissioned on 27 December 2020 and it comprises a 9km-long dual 2-lane carriageway between Tuen Mun and North Lantau, Hong Kong. Construction of the 5km-long sub-sea tunnels was carried out by two 14m diameter Tunnel Boring Machines (TBMs). The tunnel alignment for the TM-CLKL sub-sea tunnel section is in mixed ground condition with the first 500 m in mixed geology of slightly to moderately decomposed granite and completely decomposed granite (CDG), followed by soft ground condition with CDG, alluvial sand, alluvial clay and marine deposit. This mixed ground geology requires regular TBM cutterhead interventions to change the worn-out cutting tools during the tunnelling operation. As the tunnel alignment is up to 55 m below the sea level with the deepest seabed level at -21 mPD, in order to maintain the cutting face stability during the intervention, the intervention pressure could be up to 6 bars. This paper describes different techniques used for TBM interventions under the sea such as trimix bounce mode and saturation mode that appears first time in Hong Kong under a high hyperbaric pressure to change the worn-out cutting tools at the TBM cutterhead.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Transactions Hong Kong Institution of Engineers
Transactions Hong Kong Institution of Engineers Engineering-Engineering (all)
CiteScore
2.70
自引率
0.00%
发文量
22
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信