{"title":"通过对露天煤矿矸石稳定性的有效管理,提高生产效率","authors":"Nompumelelo Mpembe, Begum Genc","doi":"10.1504/ijmme.2020.10030572","DOIUrl":null,"url":null,"abstract":"The paper investigated the best practical dig-spoil sequence which addressed circular failure in waste spoil piles and enhanced productivity through an improved coal exposure rate. This involved the evaluation of two overhand-chop and three dozer pushover dig-spoil sequences through DragSim software and an MS Excel dragline calculator. The software provided spoil profiles for geotechnical analysis and the calculator generated productivity indicators (digging rate, coal exposure rate and rehandle percentage). The sequences were ranked in terms of the ability to meet the mine budget requirements and best practice standards for stability and productivity. The best practical dig-spoil sequence was the oblique spoil-side dozer pushover sequence. It was recommended that Pit B be split in two halves: a modified overhand-chop and oblique spoil-side dozer pushover sequence for the first and second half, respectively.","PeriodicalId":38622,"journal":{"name":"International Journal of Mining and Mineral Engineering","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-07-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Enhancing productivity through effective spoil stability management in an open cast coal mine\",\"authors\":\"Nompumelelo Mpembe, Begum Genc\",\"doi\":\"10.1504/ijmme.2020.10030572\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper investigated the best practical dig-spoil sequence which addressed circular failure in waste spoil piles and enhanced productivity through an improved coal exposure rate. This involved the evaluation of two overhand-chop and three dozer pushover dig-spoil sequences through DragSim software and an MS Excel dragline calculator. The software provided spoil profiles for geotechnical analysis and the calculator generated productivity indicators (digging rate, coal exposure rate and rehandle percentage). The sequences were ranked in terms of the ability to meet the mine budget requirements and best practice standards for stability and productivity. The best practical dig-spoil sequence was the oblique spoil-side dozer pushover sequence. It was recommended that Pit B be split in two halves: a modified overhand-chop and oblique spoil-side dozer pushover sequence for the first and second half, respectively.\",\"PeriodicalId\":38622,\"journal\":{\"name\":\"International Journal of Mining and Mineral Engineering\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-07-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Mining and Mineral Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/ijmme.2020.10030572\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Mining and Mineral Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/ijmme.2020.10030572","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}
Enhancing productivity through effective spoil stability management in an open cast coal mine
The paper investigated the best practical dig-spoil sequence which addressed circular failure in waste spoil piles and enhanced productivity through an improved coal exposure rate. This involved the evaluation of two overhand-chop and three dozer pushover dig-spoil sequences through DragSim software and an MS Excel dragline calculator. The software provided spoil profiles for geotechnical analysis and the calculator generated productivity indicators (digging rate, coal exposure rate and rehandle percentage). The sequences were ranked in terms of the ability to meet the mine budget requirements and best practice standards for stability and productivity. The best practical dig-spoil sequence was the oblique spoil-side dozer pushover sequence. It was recommended that Pit B be split in two halves: a modified overhand-chop and oblique spoil-side dozer pushover sequence for the first and second half, respectively.