Florence Ellis, S. Amos-Abanyie, T. E. Kwofie, Kofi Amponsah-Kwatiah, Isaac Afranie, C. Aigbavboa
{"title":"施工项目团队中人-团队拟合参数对团队效能的贡献","authors":"Florence Ellis, S. Amos-Abanyie, T. E. Kwofie, Kofi Amponsah-Kwatiah, Isaac Afranie, C. Aigbavboa","doi":"10.1108/ijmpb-04-2021-0114","DOIUrl":null,"url":null,"abstract":"PurposeThough affective commitment has been thought to be critical in team selection, it is yet to be integrated into current models on team selection primarily due to lack of understanding of its contribution to teamwork effectiveness and performance. This study tests the contribution of complementary person team-fit (CF), supplementary person team-fit (SF) and affective commitment (AC) to teamwork effectiveness in construction project teams. By this examination, a theoretical case is made for the inclusion of affective commitment in team selection and deployment in construction project delivery.Design/methodology/approachBy using a deductive questionnaire survey on project team participants and experienced human resource managers in recruitment and team selection in project organizations, structural equation model (SEM) was used to test the contribution of CF, SF and AC parameters to teamwork effectiveness from a total of 105 responses gathered from project team participants in project delivery.FindingsThe SEM revealed that, CF, SF and AC together account for about 81% predictive effect to teamwork effectiveness which is higher than joint effect of CF and SF in existing models in team selection and deployment. By this, it can be affirmed that, in considering CF, SF and AC in an integrated manner in team selection and deployment, higher team effectiveness can be achieved that can stimulate high performing teams and effectiveness in project delivery.Originality/valueThe findings give theoretical assertiveness to extending consideration of competence and values in team selection to embrace affections and commitment to engender effectiveness in teamwork, cohesion, collaboration and performance. This present novel attempts to include affective commitment in teamwork toward higher team effectiveness.","PeriodicalId":47374,"journal":{"name":"International Journal of Managing Projects in Business","volume":" ","pages":""},"PeriodicalIF":2.3000,"publicationDate":"2022-08-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Contribution of person-team fit parameters to teamwork effectiveness in construction project teams\",\"authors\":\"Florence Ellis, S. Amos-Abanyie, T. E. Kwofie, Kofi Amponsah-Kwatiah, Isaac Afranie, C. Aigbavboa\",\"doi\":\"10.1108/ijmpb-04-2021-0114\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PurposeThough affective commitment has been thought to be critical in team selection, it is yet to be integrated into current models on team selection primarily due to lack of understanding of its contribution to teamwork effectiveness and performance. This study tests the contribution of complementary person team-fit (CF), supplementary person team-fit (SF) and affective commitment (AC) to teamwork effectiveness in construction project teams. By this examination, a theoretical case is made for the inclusion of affective commitment in team selection and deployment in construction project delivery.Design/methodology/approachBy using a deductive questionnaire survey on project team participants and experienced human resource managers in recruitment and team selection in project organizations, structural equation model (SEM) was used to test the contribution of CF, SF and AC parameters to teamwork effectiveness from a total of 105 responses gathered from project team participants in project delivery.FindingsThe SEM revealed that, CF, SF and AC together account for about 81% predictive effect to teamwork effectiveness which is higher than joint effect of CF and SF in existing models in team selection and deployment. By this, it can be affirmed that, in considering CF, SF and AC in an integrated manner in team selection and deployment, higher team effectiveness can be achieved that can stimulate high performing teams and effectiveness in project delivery.Originality/valueThe findings give theoretical assertiveness to extending consideration of competence and values in team selection to embrace affections and commitment to engender effectiveness in teamwork, cohesion, collaboration and performance. This present novel attempts to include affective commitment in teamwork toward higher team effectiveness.\",\"PeriodicalId\":47374,\"journal\":{\"name\":\"International Journal of Managing Projects in Business\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":2.3000,\"publicationDate\":\"2022-08-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Managing Projects in Business\",\"FirstCategoryId\":\"91\",\"ListUrlMain\":\"https://doi.org/10.1108/ijmpb-04-2021-0114\",\"RegionNum\":4,\"RegionCategory\":\"管理学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"BUSINESS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Managing Projects in Business","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.1108/ijmpb-04-2021-0114","RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"BUSINESS","Score":null,"Total":0}
Contribution of person-team fit parameters to teamwork effectiveness in construction project teams
PurposeThough affective commitment has been thought to be critical in team selection, it is yet to be integrated into current models on team selection primarily due to lack of understanding of its contribution to teamwork effectiveness and performance. This study tests the contribution of complementary person team-fit (CF), supplementary person team-fit (SF) and affective commitment (AC) to teamwork effectiveness in construction project teams. By this examination, a theoretical case is made for the inclusion of affective commitment in team selection and deployment in construction project delivery.Design/methodology/approachBy using a deductive questionnaire survey on project team participants and experienced human resource managers in recruitment and team selection in project organizations, structural equation model (SEM) was used to test the contribution of CF, SF and AC parameters to teamwork effectiveness from a total of 105 responses gathered from project team participants in project delivery.FindingsThe SEM revealed that, CF, SF and AC together account for about 81% predictive effect to teamwork effectiveness which is higher than joint effect of CF and SF in existing models in team selection and deployment. By this, it can be affirmed that, in considering CF, SF and AC in an integrated manner in team selection and deployment, higher team effectiveness can be achieved that can stimulate high performing teams and effectiveness in project delivery.Originality/valueThe findings give theoretical assertiveness to extending consideration of competence and values in team selection to embrace affections and commitment to engender effectiveness in teamwork, cohesion, collaboration and performance. This present novel attempts to include affective commitment in teamwork toward higher team effectiveness.
期刊介绍:
The International Journal of Managing Projects in Business seeks to advance the theory, research and practice of all aspects of project management. IJMPB is looking for top quality theoretical and empirical research with the aims of: promoting the understanding of project management and; encouraging the publication of novel project management insights using multidisciplinary approaches rooted in social sciences. The journal provides a much-needed resource involved in project management by exploring new avenues not often addressed in the field of project management.