D. Aghimien, M. Ikuabe, Lerato Aghimien, C. Aigbavboa, Ntebo Ngcobo, J. Yankah
{"title":"PLS-SEM评估机器人和自动化部署的障碍,以实现有效的施工健康和安全","authors":"D. Aghimien, M. Ikuabe, Lerato Aghimien, C. Aigbavboa, Ntebo Ngcobo, J. Yankah","doi":"10.1108/jfm-04-2022-0037","DOIUrl":null,"url":null,"abstract":"\nPurpose\nThe importance of robotics and automation (R&A) in delivering a safe built environment cannot be overemphasised. This is because R&A systems can execute a hazardous job function that the construction workforce may not execute. Based on this knowledge, this study aims to present the result of an assessment of the impediments to the deployment of R&A for a safe and healthy construction environment.\n\n\nDesign/methodology/approach\nThis study adopted a post-positivist philosophical stance, using a quantitative research approach and a questionnaire administered to construction professionals in South Africa. The data gathered were analysed using frequency, percentage, mean item score, Kruskal–Wallis H-test, exploratory factor analysis and partial least square structural equation modelling (SEM).\n\n\nFindings\nThis study revealed that the impediments to the deployment of R&A could be grouped into: industry, technology, human and cost-related factors. However, SEM assessment showed that only the industry, human and cost-related factors would significantly impact attaining specific health and safety-related outcomes.\n\n\nPractical implications\nThe findings offer valuable benefits to construction organisations as the careful understanding of the identified impeding factors can help lead to better deployment of R&A and the attainment of its inherent safety benefits.\n\n\nOriginality/value\nThis study attempts to fill the gap in the shortage of literature exploring the deployment of R&A for a safe construction environment, particularly in developing countries like South Africa, where such studies are non-existent. This paper, therefore, offers a theoretical backdrop for future works on R&A deployment, particularly in developing countries where such a study has not been explored.\n","PeriodicalId":46544,"journal":{"name":"Journal of Facilities Management","volume":" ","pages":""},"PeriodicalIF":2.2000,"publicationDate":"2022-08-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"PLS-SEM assessment of the impediments of robotics and automation deployment for effective construction health and safety\",\"authors\":\"D. Aghimien, M. Ikuabe, Lerato Aghimien, C. Aigbavboa, Ntebo Ngcobo, J. Yankah\",\"doi\":\"10.1108/jfm-04-2022-0037\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\nPurpose\\nThe importance of robotics and automation (R&A) in delivering a safe built environment cannot be overemphasised. This is because R&A systems can execute a hazardous job function that the construction workforce may not execute. Based on this knowledge, this study aims to present the result of an assessment of the impediments to the deployment of R&A for a safe and healthy construction environment.\\n\\n\\nDesign/methodology/approach\\nThis study adopted a post-positivist philosophical stance, using a quantitative research approach and a questionnaire administered to construction professionals in South Africa. The data gathered were analysed using frequency, percentage, mean item score, Kruskal–Wallis H-test, exploratory factor analysis and partial least square structural equation modelling (SEM).\\n\\n\\nFindings\\nThis study revealed that the impediments to the deployment of R&A could be grouped into: industry, technology, human and cost-related factors. However, SEM assessment showed that only the industry, human and cost-related factors would significantly impact attaining specific health and safety-related outcomes.\\n\\n\\nPractical implications\\nThe findings offer valuable benefits to construction organisations as the careful understanding of the identified impeding factors can help lead to better deployment of R&A and the attainment of its inherent safety benefits.\\n\\n\\nOriginality/value\\nThis study attempts to fill the gap in the shortage of literature exploring the deployment of R&A for a safe construction environment, particularly in developing countries like South Africa, where such studies are non-existent. This paper, therefore, offers a theoretical backdrop for future works on R&A deployment, particularly in developing countries where such a study has not been explored.\\n\",\"PeriodicalId\":46544,\"journal\":{\"name\":\"Journal of Facilities Management\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":2.2000,\"publicationDate\":\"2022-08-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Facilities Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/jfm-04-2022-0037\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Facilities Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/jfm-04-2022-0037","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
PLS-SEM assessment of the impediments of robotics and automation deployment for effective construction health and safety
Purpose
The importance of robotics and automation (R&A) in delivering a safe built environment cannot be overemphasised. This is because R&A systems can execute a hazardous job function that the construction workforce may not execute. Based on this knowledge, this study aims to present the result of an assessment of the impediments to the deployment of R&A for a safe and healthy construction environment.
Design/methodology/approach
This study adopted a post-positivist philosophical stance, using a quantitative research approach and a questionnaire administered to construction professionals in South Africa. The data gathered were analysed using frequency, percentage, mean item score, Kruskal–Wallis H-test, exploratory factor analysis and partial least square structural equation modelling (SEM).
Findings
This study revealed that the impediments to the deployment of R&A could be grouped into: industry, technology, human and cost-related factors. However, SEM assessment showed that only the industry, human and cost-related factors would significantly impact attaining specific health and safety-related outcomes.
Practical implications
The findings offer valuable benefits to construction organisations as the careful understanding of the identified impeding factors can help lead to better deployment of R&A and the attainment of its inherent safety benefits.
Originality/value
This study attempts to fill the gap in the shortage of literature exploring the deployment of R&A for a safe construction environment, particularly in developing countries like South Africa, where such studies are non-existent. This paper, therefore, offers a theoretical backdrop for future works on R&A deployment, particularly in developing countries where such a study has not been explored.
期刊介绍:
Journal of Facilities Management is a strategic level journal for Heads of Facilities and Corporate Real Estate. Guided by its international and expert Editorial Board, Journal of Facilities Management publishes high-quality, authoritative, and detailed analysis, briefings and case studies on how facilities can and do play a vital part in helping deliver corporate strategy. This quarterly publication features contributions from leading practitioners and thinkers in the field of Facilities Management, from some of the leading companies, government institutions, and universities in the world. The journal features a combination of theoretical and practical articles, complemented by a wide range of case studies and regular features, identifying key implications for senior practitioners in Facilities Management.