{"title":"在约旦西北部伊尔比德的Bab Al-Hawa安装风电场的可行性研究","authors":"Mohammad H. Al-Smairan, Omar Al-Nhoud","doi":"10.4236/MME.2019.91004","DOIUrl":null,"url":null,"abstract":"The utilization of wind energy for power generation purposes is becoming increasingly attractive and gaining a great share in the electrical power production market worldwide. This research was considered a feasibility study of wind energy farm in Bab Al-Hawa, Irbid. The average wind speed in the site is (6.5 m/s). Data have been collected, which includes the average monthly wind speed for 10 years, but by HOMER software to create the hourly wind speed of a representative year is created in order to build Weibull distribution and to calculate the energy generated output of the project. This project contains the construction of 33 wind turbines in 3.11 km square. Each turbine has a capacity of 900 kW rated power and the total rated capacity is 29.7 MW. The capacity factor was found equal to 37.1% which means the amount of utilization of the turbine capacity. The results show that the turbines work 87,286 h/yr, and the total energy generated is 96.548559 GWh/yr. from the 33 wind turbines installed. The initial cost of this project is equal to 80.5243 M$ and the Payback period is 7 years. We have taken into account the environmental impact such as CO2 emissions into consideration. CO2 reductions by using wind energy instead of coal-fired plant are equal to 67124.4 tons, and the CO2 emissions reduction using wind power instead of fuel oil power plant is 5343.4 tons. This research shows that wind farm at Bab Al-Hawa with a capacity of 29.7 MW, 33 wind turbines, 900 kW each has been feasible with a cost of energy 4 cents/kWh.","PeriodicalId":69007,"journal":{"name":"现代机械工程(英文)","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-01-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Feasibility Study to Install Wind Farm in Bab Al-Hawa, Irbid, Northwest of Jordan\",\"authors\":\"Mohammad H. Al-Smairan, Omar Al-Nhoud\",\"doi\":\"10.4236/MME.2019.91004\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The utilization of wind energy for power generation purposes is becoming increasingly attractive and gaining a great share in the electrical power production market worldwide. This research was considered a feasibility study of wind energy farm in Bab Al-Hawa, Irbid. The average wind speed in the site is (6.5 m/s). Data have been collected, which includes the average monthly wind speed for 10 years, but by HOMER software to create the hourly wind speed of a representative year is created in order to build Weibull distribution and to calculate the energy generated output of the project. This project contains the construction of 33 wind turbines in 3.11 km square. Each turbine has a capacity of 900 kW rated power and the total rated capacity is 29.7 MW. The capacity factor was found equal to 37.1% which means the amount of utilization of the turbine capacity. The results show that the turbines work 87,286 h/yr, and the total energy generated is 96.548559 GWh/yr. from the 33 wind turbines installed. The initial cost of this project is equal to 80.5243 M$ and the Payback period is 7 years. We have taken into account the environmental impact such as CO2 emissions into consideration. CO2 reductions by using wind energy instead of coal-fired plant are equal to 67124.4 tons, and the CO2 emissions reduction using wind power instead of fuel oil power plant is 5343.4 tons. This research shows that wind farm at Bab Al-Hawa with a capacity of 29.7 MW, 33 wind turbines, 900 kW each has been feasible with a cost of energy 4 cents/kWh.\",\"PeriodicalId\":69007,\"journal\":{\"name\":\"现代机械工程(英文)\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-01-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"现代机械工程(英文)\",\"FirstCategoryId\":\"1087\",\"ListUrlMain\":\"https://doi.org/10.4236/MME.2019.91004\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"现代机械工程(英文)","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.4236/MME.2019.91004","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
利用风能发电正变得越来越有吸引力,并在全球电力生产市场中占据很大份额。这项研究被认为是对Irbid Bab Al Hawa风能发电场的可行性研究。现场平均风速为(6.5 m/s)。已经收集了数据,其中包括10年的平均月风速,但通过HOMER软件创建代表年的小时风速,以建立威布尔分布并计算项目的发电量。该项目包括在3.11平方公里的土地上建造33台风力涡轮机。每台涡轮机的额定功率为900 kW,总额定容量为29.7 MW。发现容量系数等于37.1%,这意味着涡轮机容量的利用量。结果表明,涡轮机的工作时间为87286小时/年,总发电量为96.548559 GWh/年。安装了33台风力涡轮机。该项目的初始成本为8052.43百万美元,回收期为7年。我们已将二氧化碳排放等环境影响考虑在内。利用风能代替燃煤发电厂减少的二氧化碳排放量为67124.4吨,利用风能代替燃油发电厂减少二氧化碳排放量5343.4吨。这项研究表明,Bab Al Hawa的风电场容量为29.7兆瓦,33台风力涡轮机,每台900千瓦,能源成本为4美分/千瓦时,是可行的。
Feasibility Study to Install Wind Farm in Bab Al-Hawa, Irbid, Northwest of Jordan
The utilization of wind energy for power generation purposes is becoming increasingly attractive and gaining a great share in the electrical power production market worldwide. This research was considered a feasibility study of wind energy farm in Bab Al-Hawa, Irbid. The average wind speed in the site is (6.5 m/s). Data have been collected, which includes the average monthly wind speed for 10 years, but by HOMER software to create the hourly wind speed of a representative year is created in order to build Weibull distribution and to calculate the energy generated output of the project. This project contains the construction of 33 wind turbines in 3.11 km square. Each turbine has a capacity of 900 kW rated power and the total rated capacity is 29.7 MW. The capacity factor was found equal to 37.1% which means the amount of utilization of the turbine capacity. The results show that the turbines work 87,286 h/yr, and the total energy generated is 96.548559 GWh/yr. from the 33 wind turbines installed. The initial cost of this project is equal to 80.5243 M$ and the Payback period is 7 years. We have taken into account the environmental impact such as CO2 emissions into consideration. CO2 reductions by using wind energy instead of coal-fired plant are equal to 67124.4 tons, and the CO2 emissions reduction using wind power instead of fuel oil power plant is 5343.4 tons. This research shows that wind farm at Bab Al-Hawa with a capacity of 29.7 MW, 33 wind turbines, 900 kW each has been feasible with a cost of energy 4 cents/kWh.