{"title":"采用模糊层次分析法选择马甸-多坡航迹路线","authors":"S. W. Astuti, M. A. Kurniawan, Adya Aghastya","doi":"10.23968/2500-0055-2021-6-2-63-69","DOIUrl":null,"url":null,"abstract":"Introduction: The National Railway Master Plan (RIPNAS), dated 2018, mentions that the railway network size and railway service capacity for using trains as the main means of transportation can be increased by reactivating non-operational routes and improving the condition of the existing routes. Methods: In our study, we propose the Fuzzy Analytic Hierarchy Process (Fuzzy AHP) method to determine the best option for the reactivated Madiun–Dopolo trace route in East Java, Indonesia. The data obtained were derived from questionnaires filled in by experts in the field. The model used six main criteria: land use, technical aspects, transportation node integration, social insecurity, disaster factors, and funding. Result and Discussion: The analysis reveals that the predominant route selection criterion chosen by the respondents was the Land Use (with a score of 0.25). The least significant Madiun–Dopolo route selection criterion was the Disaster Factors (0.07). Based on the results of weighting the criteria and aggregating the respondent alternatives, the trace route most commonly chosen by the respondents was the Alternative Trace Route (Trace Route 2), with a score of 0.698, while the Existing Trace Route (Trace Route 1) had a score of 0.302. The Alternative Trace Route is longer than the Existing Trace Route, but it will mostly pass through farming regions, which is assumed to create less social conflicts than in the case of Trace Route 1. This also automatically means that Trace Route 2 will need fewer funds in land acquisition.","PeriodicalId":52295,"journal":{"name":"Architecture and Engineering","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-06-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"SELECTING MADIUN–DOLOPO TRACE ROUTE WITH THE FUZZY AHP (ANALYTIC HIERARCHY PROCESS) METHOD\",\"authors\":\"S. W. Astuti, M. A. Kurniawan, Adya Aghastya\",\"doi\":\"10.23968/2500-0055-2021-6-2-63-69\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Introduction: The National Railway Master Plan (RIPNAS), dated 2018, mentions that the railway network size and railway service capacity for using trains as the main means of transportation can be increased by reactivating non-operational routes and improving the condition of the existing routes. Methods: In our study, we propose the Fuzzy Analytic Hierarchy Process (Fuzzy AHP) method to determine the best option for the reactivated Madiun–Dopolo trace route in East Java, Indonesia. The data obtained were derived from questionnaires filled in by experts in the field. The model used six main criteria: land use, technical aspects, transportation node integration, social insecurity, disaster factors, and funding. Result and Discussion: The analysis reveals that the predominant route selection criterion chosen by the respondents was the Land Use (with a score of 0.25). The least significant Madiun–Dopolo route selection criterion was the Disaster Factors (0.07). Based on the results of weighting the criteria and aggregating the respondent alternatives, the trace route most commonly chosen by the respondents was the Alternative Trace Route (Trace Route 2), with a score of 0.698, while the Existing Trace Route (Trace Route 1) had a score of 0.302. The Alternative Trace Route is longer than the Existing Trace Route, but it will mostly pass through farming regions, which is assumed to create less social conflicts than in the case of Trace Route 1. This also automatically means that Trace Route 2 will need fewer funds in land acquisition.\",\"PeriodicalId\":52295,\"journal\":{\"name\":\"Architecture and Engineering\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-06-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Architecture and Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.23968/2500-0055-2021-6-2-63-69\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Architecture and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23968/2500-0055-2021-6-2-63-69","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

摘要

简介:2018年的《国家铁路总体规划》(RIPNAS)提到,可以通过重新启用非运营线路和改善现有线路的状况来增加铁路网规模和以列车为主要交通工具的铁路服务能力。方法:在我们的研究中,我们提出了模糊层次分析法(Fuzzy AHP)来确定印度尼西亚东爪哇重新激活的Madiun–Dopolo路线的最佳方案。所获得的数据来自该领域专家填写的调查表。该模型使用了六个主要标准:土地利用、技术方面、交通节点整合、社会不安全、灾害因素和资金。结果与讨论:分析显示,受访者选择的主要路线选择标准是土地利用(得分0.25)。最不显著的Madiun–Dopolo路线选择标准为灾害因素(0.07)。基于对标准进行加权并汇总受访者备选方案的结果,受访者最常选择的跟踪路线是备选跟踪路线(跟踪路线2),得分为0.698,而现有跟踪路线(追踪路线1)得分为0.302。备选追踪路线比现有追踪路线长,但它将主要经过农业地区,这被认为比追踪路线1造成的社会冲突更少。这也自动意味着Trace Route 2在土地征用方面需要更少的资金。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
SELECTING MADIUN–DOLOPO TRACE ROUTE WITH THE FUZZY AHP (ANALYTIC HIERARCHY PROCESS) METHOD
Introduction: The National Railway Master Plan (RIPNAS), dated 2018, mentions that the railway network size and railway service capacity for using trains as the main means of transportation can be increased by reactivating non-operational routes and improving the condition of the existing routes. Methods: In our study, we propose the Fuzzy Analytic Hierarchy Process (Fuzzy AHP) method to determine the best option for the reactivated Madiun–Dopolo trace route in East Java, Indonesia. The data obtained were derived from questionnaires filled in by experts in the field. The model used six main criteria: land use, technical aspects, transportation node integration, social insecurity, disaster factors, and funding. Result and Discussion: The analysis reveals that the predominant route selection criterion chosen by the respondents was the Land Use (with a score of 0.25). The least significant Madiun–Dopolo route selection criterion was the Disaster Factors (0.07). Based on the results of weighting the criteria and aggregating the respondent alternatives, the trace route most commonly chosen by the respondents was the Alternative Trace Route (Trace Route 2), with a score of 0.698, while the Existing Trace Route (Trace Route 1) had a score of 0.302. The Alternative Trace Route is longer than the Existing Trace Route, but it will mostly pass through farming regions, which is assumed to create less social conflicts than in the case of Trace Route 1. This also automatically means that Trace Route 2 will need fewer funds in land acquisition.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Architecture and Engineering
Architecture and Engineering Engineering-Architecture
CiteScore
1.80
自引率
0.00%
发文量
26
审稿时长
7 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信