确保覆盖生物墙在三氯乙烯污染的超级基金场地的持续成功:经验教训

IF 3 Q3 ENGINEERING, ENVIRONMENTAL
Shahrzad Saffari Ghandehari, Shih‐Huai Cheng, C. Hapeman, A. Torrents, B. V. Kjellerup
{"title":"确保覆盖生物墙在三氯乙烯污染的超级基金场地的持续成功:经验教训","authors":"Shahrzad Saffari Ghandehari, Shih‐Huai Cheng, C. Hapeman, A. Torrents, B. V. Kjellerup","doi":"10.1002/rem.21764","DOIUrl":null,"url":null,"abstract":"Trichloroethylene (TCE) is a toxic organic compound, which can adversely affect human health. The chemical is one of the most frequently found contaminants in groundwater in the United States and around the world. A landfill in Maryland contaminated with high levels of TCE decades ago was added to the National Priority List (NPL) in 1994 for clean up. A biowall was installed on the site in 2013 to promote the bioremediation of TCE and subsequently of its degradation products. Six‐year monitoring data indicated a steady removal of >99% groundwater TCE at the wall since installation. However, a concurrent buildup of intermediate byproducts was observed downgradient of the wall. An examination of the entire system was necessary to find the reason behind the inefficiency of the biowall. In this study, the background of the site, remediation plan, and installation were assessed. Monitoring data, including the concentration of TCE and its degradation byproducts, and geochemical and physical characteristics were evaluated to understand the conditions and challenges facing decision‐makers of this project and possible options to improve biowall efficacy.","PeriodicalId":46411,"journal":{"name":"Remediation-The Journal of Environmental Cleanup Costs Technologies & Techniques","volume":null,"pages":null},"PeriodicalIF":3.0000,"publicationDate":"2023-08-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Ensuring the continued success of a mulch biowall at a trichloroethylene‐contaminated superfund site: Lessons learned\",\"authors\":\"Shahrzad Saffari Ghandehari, Shih‐Huai Cheng, C. Hapeman, A. Torrents, B. V. Kjellerup\",\"doi\":\"10.1002/rem.21764\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Trichloroethylene (TCE) is a toxic organic compound, which can adversely affect human health. The chemical is one of the most frequently found contaminants in groundwater in the United States and around the world. A landfill in Maryland contaminated with high levels of TCE decades ago was added to the National Priority List (NPL) in 1994 for clean up. A biowall was installed on the site in 2013 to promote the bioremediation of TCE and subsequently of its degradation products. Six‐year monitoring data indicated a steady removal of >99% groundwater TCE at the wall since installation. However, a concurrent buildup of intermediate byproducts was observed downgradient of the wall. An examination of the entire system was necessary to find the reason behind the inefficiency of the biowall. In this study, the background of the site, remediation plan, and installation were assessed. Monitoring data, including the concentration of TCE and its degradation byproducts, and geochemical and physical characteristics were evaluated to understand the conditions and challenges facing decision‐makers of this project and possible options to improve biowall efficacy.\",\"PeriodicalId\":46411,\"journal\":{\"name\":\"Remediation-The Journal of Environmental Cleanup Costs Technologies & Techniques\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":3.0000,\"publicationDate\":\"2023-08-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Remediation-The Journal of Environmental Cleanup Costs Technologies & Techniques\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1002/rem.21764\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, ENVIRONMENTAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Remediation-The Journal of Environmental Cleanup Costs Technologies & Techniques","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/rem.21764","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, ENVIRONMENTAL","Score":null,"Total":0}
引用次数: 0

摘要

三氯乙烯(TCE)是一种有毒的有机化合物,会对人体健康产生不利影响。这种化学物质是美国和世界各地地下水中最常见的污染物之一。几十年前,马里兰州的一个垃圾填埋场被高浓度的TCE污染,1994年被列入国家优先清理名单(NPL)。2013年在现场安装了一个生物墙,以促进TCE及其降解产物的生物修复。6年的监测数据表明,自安装以来,墙内地下水TCE的稳定去除量达到了50% ~ 99%。然而,在壁的下梯度处观察到中间副产物的同时积聚。有必要对整个系统进行检查,以找出生物墙效率低下背后的原因。本研究对选址背景、修复方案和安装进行了评估。通过评估监测数据,包括TCE及其降解副产物的浓度、地球化学和物理特征,了解该项目的决策者面临的条件和挑战,以及提高生物墙效能的可能选择。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Ensuring the continued success of a mulch biowall at a trichloroethylene‐contaminated superfund site: Lessons learned
Trichloroethylene (TCE) is a toxic organic compound, which can adversely affect human health. The chemical is one of the most frequently found contaminants in groundwater in the United States and around the world. A landfill in Maryland contaminated with high levels of TCE decades ago was added to the National Priority List (NPL) in 1994 for clean up. A biowall was installed on the site in 2013 to promote the bioremediation of TCE and subsequently of its degradation products. Six‐year monitoring data indicated a steady removal of >99% groundwater TCE at the wall since installation. However, a concurrent buildup of intermediate byproducts was observed downgradient of the wall. An examination of the entire system was necessary to find the reason behind the inefficiency of the biowall. In this study, the background of the site, remediation plan, and installation were assessed. Monitoring data, including the concentration of TCE and its degradation byproducts, and geochemical and physical characteristics were evaluated to understand the conditions and challenges facing decision‐makers of this project and possible options to improve biowall efficacy.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.50
自引率
21.10%
发文量
37
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信