通过能源基础设施实现区域发展:伊朗-巴基斯坦-印度(IPI)和土库曼斯坦-阿富汗-巴基斯坦-印巴(TAPI)天然气管道的比较和优化

Q1 Engineering
Y. Ali, Manzoor Ahmad, Muhammad Sabir, S. A. Shah
{"title":"通过能源基础设施实现区域发展:伊朗-巴基斯坦-印度(IPI)和土库曼斯坦-阿富汗-巴基斯坦-印巴(TAPI)天然气管道的比较和优化","authors":"Y. Ali, Manzoor Ahmad, Muhammad Sabir, S. A. Shah","doi":"10.31181/oresta091221082a","DOIUrl":null,"url":null,"abstract":"Pakistan is working on two pipeline projects, namely, Iran-Pakistan-India (IPI) and Turkmenistan-Afghanistan-Pakistan-India (TAPI) gas pipelines, to meet its energy supply-demand gap. This study's aims to compare these two projects and identify the most suitable option for Pakistan. Furthermore, as the TAPI project is progressing faster than the IPI project, this study also aims to identify the critical activities associated with TAPI projects. Finally, a model is proposed to optimize the material and transportation costs related to the TAPI project. The study's contribution by using fuzzy set theory-based multi-criteria decision-making (Fuzzy MCDM) to compare two projects along with usage of the Fuzzy Critical Path Method (FCPM) for the identification of critical activities associated with the TAPI project. Finally, the Genetic Algorithm is applied to optimize the material and transportation costs of the TAPI project. The results show that IPI has advantages over TAPI in terms of power generation, transportation cost, transits fee, and gas prices. The critical path analysis of the TAPI gas pipeline shows that it will take approximately 75 to 330.5 weeks to complete. The study is useful for the managers who have to work in these projects, the policymakers considering these projects at various levels, and the researcher having an interest in applying Fuzzy set theory with MCDM, CPM, and in the context of the energy infrastructure.","PeriodicalId":36055,"journal":{"name":"Operational Research in Engineering Sciences: Theory and Applications","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-12-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Regional development through energy infrastructure: A comparison and optimization of Iran-Pakistan-India (IPI) & Turkmenistan- Afghanistan-Pakistan-India (TAPI) gas pipelines\",\"authors\":\"Y. Ali, Manzoor Ahmad, Muhammad Sabir, S. A. Shah\",\"doi\":\"10.31181/oresta091221082a\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Pakistan is working on two pipeline projects, namely, Iran-Pakistan-India (IPI) and Turkmenistan-Afghanistan-Pakistan-India (TAPI) gas pipelines, to meet its energy supply-demand gap. This study's aims to compare these two projects and identify the most suitable option for Pakistan. Furthermore, as the TAPI project is progressing faster than the IPI project, this study also aims to identify the critical activities associated with TAPI projects. Finally, a model is proposed to optimize the material and transportation costs related to the TAPI project. The study's contribution by using fuzzy set theory-based multi-criteria decision-making (Fuzzy MCDM) to compare two projects along with usage of the Fuzzy Critical Path Method (FCPM) for the identification of critical activities associated with the TAPI project. Finally, the Genetic Algorithm is applied to optimize the material and transportation costs of the TAPI project. The results show that IPI has advantages over TAPI in terms of power generation, transportation cost, transits fee, and gas prices. The critical path analysis of the TAPI gas pipeline shows that it will take approximately 75 to 330.5 weeks to complete. The study is useful for the managers who have to work in these projects, the policymakers considering these projects at various levels, and the researcher having an interest in applying Fuzzy set theory with MCDM, CPM, and in the context of the energy infrastructure.\",\"PeriodicalId\":36055,\"journal\":{\"name\":\"Operational Research in Engineering Sciences: Theory and Applications\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Operational Research in Engineering Sciences: Theory and Applications\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31181/oresta091221082a\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Operational Research in Engineering Sciences: Theory and Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31181/oresta091221082a","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 8

摘要

巴基斯坦正在建设两个管道项目,即伊朗-巴基斯坦-印度(IPI)和土库曼斯坦-阿富汗-巴基斯坦-印度(TAPI)天然气管道,以弥补其能源供需缺口。本研究的目的是比较这两个项目,并确定最适合巴基斯坦的选择。此外,由于TAPI项目比IPI项目进展得更快,本研究还旨在确定与TAPI项目相关的关键活动。最后,提出了一个与TAPI项目相关的材料和运输成本优化模型。本研究的贡献是使用基于模糊集理论的多准则决策(fuzzy MCDM)来比较两个项目,并使用模糊关键路径方法(FCPM)来识别与TAPI项目相关的关键活动。最后,应用遗传算法对TAPI项目的材料成本和运输成本进行优化。结果表明,IPI在发电、运输成本、过境费、燃气价格等方面均优于TAPI。TAPI天然气管道的关键路径分析显示,完成该管道大约需要75至330.5周。该研究对必须在这些项目中工作的管理人员,在各个层面考虑这些项目的政策制定者,以及对模糊集理论与MCDM, CPM以及能源基础设施背景下应用感兴趣的研究人员都很有用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Regional development through energy infrastructure: A comparison and optimization of Iran-Pakistan-India (IPI) & Turkmenistan- Afghanistan-Pakistan-India (TAPI) gas pipelines
Pakistan is working on two pipeline projects, namely, Iran-Pakistan-India (IPI) and Turkmenistan-Afghanistan-Pakistan-India (TAPI) gas pipelines, to meet its energy supply-demand gap. This study's aims to compare these two projects and identify the most suitable option for Pakistan. Furthermore, as the TAPI project is progressing faster than the IPI project, this study also aims to identify the critical activities associated with TAPI projects. Finally, a model is proposed to optimize the material and transportation costs related to the TAPI project. The study's contribution by using fuzzy set theory-based multi-criteria decision-making (Fuzzy MCDM) to compare two projects along with usage of the Fuzzy Critical Path Method (FCPM) for the identification of critical activities associated with the TAPI project. Finally, the Genetic Algorithm is applied to optimize the material and transportation costs of the TAPI project. The results show that IPI has advantages over TAPI in terms of power generation, transportation cost, transits fee, and gas prices. The critical path analysis of the TAPI gas pipeline shows that it will take approximately 75 to 330.5 weeks to complete. The study is useful for the managers who have to work in these projects, the policymakers considering these projects at various levels, and the researcher having an interest in applying Fuzzy set theory with MCDM, CPM, and in the context of the energy infrastructure.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
7.90
自引率
0.00%
发文量
25
审稿时长
15 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信