{"title":"基于物料需求规划的杀虫剂包装瓶原料库存分析——以实例为例","authors":"Arinda Soraya Putri, Bagus Imron Rosydi","doi":"10.30656/jsmi.v4i2.2765","DOIUrl":null,"url":null,"abstract":"PT. Agricon mostly produces 1L package (bottle) pesticides named Spontan insecticide. This study was conducted to analyze and determine the stock inventory of 1L bottles for determining an effective ordering schedule based on the calculation of safety stock and reorder points to optimize planning and inventory. Material Requirement Planning (MRP) method used to determine the effective scheduling of 1L bottle products. Material Requirement Planning is one method used to determine scheduling with advantages such as reducing inventory, reducing set up costs, and reducing idle time. The proposed order scheme for ordering 1L insecticide packaging bottle improve the company on reducing the frequency for ordering bottles from 7 times to 5 times and inventory is more stable and close to demand quantity","PeriodicalId":53057,"journal":{"name":"Jurnal Sistem dan Manajemen Industri","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-12-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Analysis of raw material inventory for insecticide packaging bottle with material requirement planning: a case study\",\"authors\":\"Arinda Soraya Putri, Bagus Imron Rosydi\",\"doi\":\"10.30656/jsmi.v4i2.2765\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PT. Agricon mostly produces 1L package (bottle) pesticides named Spontan insecticide. This study was conducted to analyze and determine the stock inventory of 1L bottles for determining an effective ordering schedule based on the calculation of safety stock and reorder points to optimize planning and inventory. Material Requirement Planning (MRP) method used to determine the effective scheduling of 1L bottle products. Material Requirement Planning is one method used to determine scheduling with advantages such as reducing inventory, reducing set up costs, and reducing idle time. The proposed order scheme for ordering 1L insecticide packaging bottle improve the company on reducing the frequency for ordering bottles from 7 times to 5 times and inventory is more stable and close to demand quantity\",\"PeriodicalId\":53057,\"journal\":{\"name\":\"Jurnal Sistem dan Manajemen Industri\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-12-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Sistem dan Manajemen Industri\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30656/jsmi.v4i2.2765\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Sistem dan Manajemen Industri","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30656/jsmi.v4i2.2765","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
摘要
PT. Agricon主要生产1L包装(瓶)农药,命名为Spontan杀虫剂。本研究在计算安全库存和再订货点的基础上,对1L瓶的库存进行分析和确定,以确定有效的订货计划,优化计划和库存。物料需求计划(MRP)方法用于确定1L瓶产品的有效调度。物料需求计划是一种用于确定调度的方法,它具有减少库存、降低安装成本和减少闲置时间等优点。提出的1L杀虫剂包装瓶订购方案,使公司在将订购瓶的频率从7次减少到5次,库存更加稳定,接近需求数量
Analysis of raw material inventory for insecticide packaging bottle with material requirement planning: a case study
PT. Agricon mostly produces 1L package (bottle) pesticides named Spontan insecticide. This study was conducted to analyze and determine the stock inventory of 1L bottles for determining an effective ordering schedule based on the calculation of safety stock and reorder points to optimize planning and inventory. Material Requirement Planning (MRP) method used to determine the effective scheduling of 1L bottle products. Material Requirement Planning is one method used to determine scheduling with advantages such as reducing inventory, reducing set up costs, and reducing idle time. The proposed order scheme for ordering 1L insecticide packaging bottle improve the company on reducing the frequency for ordering bottles from 7 times to 5 times and inventory is more stable and close to demand quantity