{"title":"使用蒙特卡罗模拟来量化项目组合中系统风险因素的成本影响:一个案例研究","authors":"F. Joubert, M. Snyman","doi":"10.7166/32-4-2518","DOIUrl":null,"url":null,"abstract":"In terms of project risk management, ‘systemic risk’ is identified as risks which are artefacts of the environment which a project is executed in, and are related to (i) the project team’s actions, (ii) how project controls are managed and interact, and (iii) how the project is planned and executed. This paper proposes a methodology to estimate the cost impact of systemic risk on a portfolio of projects by using risk quantification and Monte Carlo simulation, in the absence of a validated parametric risk model, to estimate the systemic risks in an entire portfolio of projects. The case study simulation results indicate a significant effect of systemic risks on the project portfolio risk profile, where systemic risks increased the P80 value of the contingency requirement by +85.6%. The successful management of systemic risk would contribute to project success by limiting unnecessary waste.","PeriodicalId":49493,"journal":{"name":"South African Journal of Industrial Engineering","volume":" ","pages":""},"PeriodicalIF":0.5000,"publicationDate":"2021-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"USING MONTE CARLO SIMULATION TO QUANTIFY THE COST IMPACT OF SYSTEMIC RISK FACTORS IN A PROJECT PORTFOLIO: A CASE STUDY\",\"authors\":\"F. Joubert, M. Snyman\",\"doi\":\"10.7166/32-4-2518\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In terms of project risk management, ‘systemic risk’ is identified as risks which are artefacts of the environment which a project is executed in, and are related to (i) the project team’s actions, (ii) how project controls are managed and interact, and (iii) how the project is planned and executed. This paper proposes a methodology to estimate the cost impact of systemic risk on a portfolio of projects by using risk quantification and Monte Carlo simulation, in the absence of a validated parametric risk model, to estimate the systemic risks in an entire portfolio of projects. The case study simulation results indicate a significant effect of systemic risks on the project portfolio risk profile, where systemic risks increased the P80 value of the contingency requirement by +85.6%. The successful management of systemic risk would contribute to project success by limiting unnecessary waste.\",\"PeriodicalId\":49493,\"journal\":{\"name\":\"South African Journal of Industrial Engineering\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.5000,\"publicationDate\":\"2021-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"South African Journal of Industrial Engineering\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.7166/32-4-2518\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"South African Journal of Industrial Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.7166/32-4-2518","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

摘要

就项目风险管理而言,“系统性风险”被确定为项目执行环境中的人为因素,与(i)项目团队的行动、(ii)项目控制的管理和互动方式以及(iii)项目的规划和执行方式有关。本文提出了一种方法来估计系统性风险对项目组合的成本影响,方法是在没有经过验证的参数风险模型的情况下,使用风险量化和蒙特卡洛模拟来估计整个项目组合中的系统性风险。案例研究模拟结果表明,系统性风险对项目组合风险状况有显著影响,其中系统性风险使应急需求的P80值增加了+85.6%。系统性风险的成功管理将通过限制不必要的浪费来促进项目的成功。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
USING MONTE CARLO SIMULATION TO QUANTIFY THE COST IMPACT OF SYSTEMIC RISK FACTORS IN A PROJECT PORTFOLIO: A CASE STUDY
In terms of project risk management, ‘systemic risk’ is identified as risks which are artefacts of the environment which a project is executed in, and are related to (i) the project team’s actions, (ii) how project controls are managed and interact, and (iii) how the project is planned and executed. This paper proposes a methodology to estimate the cost impact of systemic risk on a portfolio of projects by using risk quantification and Monte Carlo simulation, in the absence of a validated parametric risk model, to estimate the systemic risks in an entire portfolio of projects. The case study simulation results indicate a significant effect of systemic risks on the project portfolio risk profile, where systemic risks increased the P80 value of the contingency requirement by +85.6%. The successful management of systemic risk would contribute to project success by limiting unnecessary waste.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
1.10
自引率
20.00%
发文量
15
审稿时长
6 weeks
期刊介绍: The South African Journal of Industrial Engineering (SAJIE) publishes articles with the emphasis on research, development and application within the fields of Industrial Engineering and Engineering and Technology Management. In this way, it aims to contribute to the further development of these fields of study and to serve as a vehicle for the effective interchange of knowledge, ideas and experience between the research and training oriented institutions and the application oriented industry. Articles on practical applications, original research and meaningful new developments as well as state of the art surveys are encouraged.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信