从项目采购程序预测建设项目的成本绩效

Q2 Business, Management and Accounting
S. Egwunatum, A. Awo-Osagie, I. A. Awodele, E. Eze
{"title":"从项目采购程序预测建设项目的成本绩效","authors":"S. Egwunatum, A. Awo-Osagie, I. A. Awodele, E. Eze","doi":"10.2478/jeppm-2021-0018","DOIUrl":null,"url":null,"abstract":"Abstract The purpose of this paper is to show by multivariate regression model if a defective procurement procedure leading to a contract award affects the smooth execution of a project in terms of its cost performance on the strength of the significance of the model. This investigation was conducted with a quantitative method of research by administering questionnaires to key industry players (clients, consultants, and contractors) engaged in construction projects (both civil and building works) in assessing contract award procedures, conditions for contract award after tender evaluation and criteria for contractors’ prequalification. Data from their field survey was analysed with mean item score to show hierarchal importance of factors and critical evaluation using multivariate analysis of variance. Findings showed that a poor and inappropriate contract award procedure has divergence from efficient project cost management based on the corollary of mean score values of contract award procedures, conditions for the award and prequalification test. The practical implication of this, is that an unbiased contract award procedure will apparently lead to a lesser strenuous project management effort towards mitigating cost spills and overruns for a lesser project abandonment if the right contractor with the right capabilities is awarded the contract. These implications stem from the originality of the investigation arising from F-value statistics (7.406), t-value statistics (3.046), and p-value of 0.003.","PeriodicalId":53274,"journal":{"name":"Journal of Engineering Project and Production Management","volume":"11 1","pages":"181 - 195"},"PeriodicalIF":0.0000,"publicationDate":"2021-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Predicting Cost Performance of Construction Projects from Projects Procurement Procedure\",\"authors\":\"S. Egwunatum, A. Awo-Osagie, I. A. Awodele, E. Eze\",\"doi\":\"10.2478/jeppm-2021-0018\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract The purpose of this paper is to show by multivariate regression model if a defective procurement procedure leading to a contract award affects the smooth execution of a project in terms of its cost performance on the strength of the significance of the model. This investigation was conducted with a quantitative method of research by administering questionnaires to key industry players (clients, consultants, and contractors) engaged in construction projects (both civil and building works) in assessing contract award procedures, conditions for contract award after tender evaluation and criteria for contractors’ prequalification. Data from their field survey was analysed with mean item score to show hierarchal importance of factors and critical evaluation using multivariate analysis of variance. Findings showed that a poor and inappropriate contract award procedure has divergence from efficient project cost management based on the corollary of mean score values of contract award procedures, conditions for the award and prequalification test. The practical implication of this, is that an unbiased contract award procedure will apparently lead to a lesser strenuous project management effort towards mitigating cost spills and overruns for a lesser project abandonment if the right contractor with the right capabilities is awarded the contract. These implications stem from the originality of the investigation arising from F-value statistics (7.406), t-value statistics (3.046), and p-value of 0.003.\",\"PeriodicalId\":53274,\"journal\":{\"name\":\"Journal of Engineering Project and Production Management\",\"volume\":\"11 1\",\"pages\":\"181 - 195\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-05-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Engineering Project and Production Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/jeppm-2021-0018\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Business, Management and Accounting\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Project and Production Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/jeppm-2021-0018","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Business, Management and Accounting","Score":null,"Total":0}
引用次数: 1

摘要

摘要本文的目的是通过多元回归模型来证明采购程序缺陷导致的合同授予是否会影响项目在成本绩效方面的顺利执行。本调查采用定量研究方法,对从事建筑项目(包括土木和建筑工程)的主要行业参与者(客户、顾问和承包商)进行问卷调查,以评估合同授予程序、评标后的合同授予条件和承包商资格预审的标准。他们的实地调查数据用平均项目得分进行分析,以显示因素的层次重要性,并使用多变量方差分析进行关键评估。研究结果表明,基于合同授予程序的平均得分值、授予条件和资格预审测试的推论,糟糕和不适当的合同授予程序与有效的项目成本管理存在分歧。这一点的实际含义是,如果将合同授予具有合适能力的合适承包商,那么公正的合同授予程序显然会减少项目管理的繁重工作,以减少成本溢出和超支,从而减少项目放弃。这些含义源于源于f值统计(7.406)、t值统计(3.046)和p值0.003的独创性调查。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Predicting Cost Performance of Construction Projects from Projects Procurement Procedure
Abstract The purpose of this paper is to show by multivariate regression model if a defective procurement procedure leading to a contract award affects the smooth execution of a project in terms of its cost performance on the strength of the significance of the model. This investigation was conducted with a quantitative method of research by administering questionnaires to key industry players (clients, consultants, and contractors) engaged in construction projects (both civil and building works) in assessing contract award procedures, conditions for contract award after tender evaluation and criteria for contractors’ prequalification. Data from their field survey was analysed with mean item score to show hierarchal importance of factors and critical evaluation using multivariate analysis of variance. Findings showed that a poor and inappropriate contract award procedure has divergence from efficient project cost management based on the corollary of mean score values of contract award procedures, conditions for the award and prequalification test. The practical implication of this, is that an unbiased contract award procedure will apparently lead to a lesser strenuous project management effort towards mitigating cost spills and overruns for a lesser project abandonment if the right contractor with the right capabilities is awarded the contract. These implications stem from the originality of the investigation arising from F-value statistics (7.406), t-value statistics (3.046), and p-value of 0.003.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Engineering Project and Production Management
Journal of Engineering Project and Production Management Business, Management and Accounting-Business, Management and Accounting (miscellaneous)
CiteScore
2.30
自引率
0.00%
发文量
24
审稿时长
30 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信