Z. Nagy, Z. Kiss, A. Kelemen, K. Bálint, Annabella Sánduly
{"title":"案例研究:大切口及椭圆玻璃表面屋架结构","authors":"Z. Nagy, Z. Kiss, A. Kelemen, K. Bálint, Annabella Sánduly","doi":"10.20898/j.iass.2023.007","DOIUrl":null,"url":null,"abstract":"The article presents the technical solutions implemented during the design of the roof trusses and the elliptic skylight structure (Figure. 1) for the extension of the \"Shopping City Sibiu\" commercial centre in Romania. The area of the roof structure was approximately 1600 sqm (29x56\n m). In the central region of the roof, a 27 m long and 10 m wide elliptic skylight was placed. The challenges of the project arouse from the relatively large span of the structure, being supported only on 13 non-symmetrically placed perimeter concrete columns. Thus, the structure had to be\n designed in such a way, that it would support the extra 20 tones coming from the skylight structure, while also bring inside the natural light unobstructed by any main structural elements. The relatively large deformations between the supporting points of the skylight under variable loads\n (especially snow loads) can also have adverse effects on the glazing surface during operational phase. Due to this, also the serviceability limit state checks had an important role in the engineering calculations. The structural configuration steps with performed analyses on the partial structural\n models and on the complex 3D model were especially useful for the identification of the sensitive zones, helping to create the surface shape and develop adequate structural details. The paper summarizes the structural engineering challenges during the design and execution process.","PeriodicalId":42855,"journal":{"name":"Journal of the International Association for Shell and Spatial Structures","volume":" ","pages":""},"PeriodicalIF":1.1000,"publicationDate":"2023-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Case Study: Roof Truss Structure With Large Cut Out and Elliptic Glazing Surface\",\"authors\":\"Z. Nagy, Z. Kiss, A. Kelemen, K. Bálint, Annabella Sánduly\",\"doi\":\"10.20898/j.iass.2023.007\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The article presents the technical solutions implemented during the design of the roof trusses and the elliptic skylight structure (Figure. 1) for the extension of the \\\"Shopping City Sibiu\\\" commercial centre in Romania. The area of the roof structure was approximately 1600 sqm (29x56\\n m). In the central region of the roof, a 27 m long and 10 m wide elliptic skylight was placed. The challenges of the project arouse from the relatively large span of the structure, being supported only on 13 non-symmetrically placed perimeter concrete columns. Thus, the structure had to be\\n designed in such a way, that it would support the extra 20 tones coming from the skylight structure, while also bring inside the natural light unobstructed by any main structural elements. The relatively large deformations between the supporting points of the skylight under variable loads\\n (especially snow loads) can also have adverse effects on the glazing surface during operational phase. Due to this, also the serviceability limit state checks had an important role in the engineering calculations. The structural configuration steps with performed analyses on the partial structural\\n models and on the complex 3D model were especially useful for the identification of the sensitive zones, helping to create the surface shape and develop adequate structural details. The paper summarizes the structural engineering challenges during the design and execution process.\",\"PeriodicalId\":42855,\"journal\":{\"name\":\"Journal of the International Association for Shell and Spatial Structures\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":1.1000,\"publicationDate\":\"2023-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of the International Association for Shell and Spatial Structures\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.20898/j.iass.2023.007\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the International Association for Shell and Spatial Structures","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.20898/j.iass.2023.007","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
Case Study: Roof Truss Structure With Large Cut Out and Elliptic Glazing Surface
The article presents the technical solutions implemented during the design of the roof trusses and the elliptic skylight structure (Figure. 1) for the extension of the "Shopping City Sibiu" commercial centre in Romania. The area of the roof structure was approximately 1600 sqm (29x56
m). In the central region of the roof, a 27 m long and 10 m wide elliptic skylight was placed. The challenges of the project arouse from the relatively large span of the structure, being supported only on 13 non-symmetrically placed perimeter concrete columns. Thus, the structure had to be
designed in such a way, that it would support the extra 20 tones coming from the skylight structure, while also bring inside the natural light unobstructed by any main structural elements. The relatively large deformations between the supporting points of the skylight under variable loads
(especially snow loads) can also have adverse effects on the glazing surface during operational phase. Due to this, also the serviceability limit state checks had an important role in the engineering calculations. The structural configuration steps with performed analyses on the partial structural
models and on the complex 3D model were especially useful for the identification of the sensitive zones, helping to create the surface shape and develop adequate structural details. The paper summarizes the structural engineering challenges during the design and execution process.
期刊介绍:
The Association publishes an international journal, the Journal of the IASS, four times yearly, in print (ISSN 1028-365X) and on-line (ISSN 1996-9015). The months of publication are March, June, September and December. Occasional extra electronic-only issues are included in the on-line version. From this page you can access one or more issues -- a sample issue if you are not logged into the members-only portion of the site, or the current issue and several back issues if you are logged in as a member. For any issue that you can view, you can download articles as .pdf files.