{"title":"对预拌混凝土输送和浇筑的场厂资源匹配性能进行标杆","authors":"Francis Siu, Anson Kwun Wang Wong, M. Anson","doi":"10.33430/v29n1thie-2021-0021","DOIUrl":null,"url":null,"abstract":"Since on-time concrete delivery is important to both contractors and suppliers, performance benchmarking of the concrete delivery process, as actually achieved in practice, is a worthwhile undertaking of potential benefit to the construction industry. However, there has been no thorough such benchmarking in Hong Kong for 20 years, since the study by Anson et al. (2002). This research study has provided an up-to-date benchmark of the site/supplier resource matching, or coordination, performance for big building superstructure pours, based on study of the records of 77 pours placed on five buildings under construction in Hong Kong. This research study also aimed to assess whether there was any evidence to suggest that site/ plant coordination performance has improved since 2000, not least due to the adoption of advanced technologies, which nowadays monitor the locations of truckmixers in real time throughout the day. Of great importance to the industry, however, and the most significant finding arising from this study, is that there is no support for the proposition that site/supplier resource coordination has improved over that 20-year interval. Truckmixer position tracking systems need to be capitalised upon with the introduction of data analysis simulation software and optimising scheduling applied in real time.","PeriodicalId":35587,"journal":{"name":"Transactions Hong Kong Institution of Engineers","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-03-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Benchmarking site-plant resource matching performance of ready-mixed concrete delivery and placing\",\"authors\":\"Francis Siu, Anson Kwun Wang Wong, M. Anson\",\"doi\":\"10.33430/v29n1thie-2021-0021\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Since on-time concrete delivery is important to both contractors and suppliers, performance benchmarking of the concrete delivery process, as actually achieved in practice, is a worthwhile undertaking of potential benefit to the construction industry. However, there has been no thorough such benchmarking in Hong Kong for 20 years, since the study by Anson et al. (2002). This research study has provided an up-to-date benchmark of the site/supplier resource matching, or coordination, performance for big building superstructure pours, based on study of the records of 77 pours placed on five buildings under construction in Hong Kong. This research study also aimed to assess whether there was any evidence to suggest that site/ plant coordination performance has improved since 2000, not least due to the adoption of advanced technologies, which nowadays monitor the locations of truckmixers in real time throughout the day. Of great importance to the industry, however, and the most significant finding arising from this study, is that there is no support for the proposition that site/supplier resource coordination has improved over that 20-year interval. Truckmixer position tracking systems need to be capitalised upon with the introduction of data analysis simulation software and optimising scheduling applied in real time.\",\"PeriodicalId\":35587,\"journal\":{\"name\":\"Transactions Hong Kong Institution of Engineers\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-03-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Transactions Hong Kong Institution of Engineers\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33430/v29n1thie-2021-0021\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Transactions Hong Kong Institution of Engineers","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33430/v29n1thie-2021-0021","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0
摘要
由于按时交付混凝土对承建商和供应商都很重要,因此对混凝土交付过程的表现进行基准测试是一项有价值的工作,对建造业有潜在的好处。然而,自Anson et al.(2002)的研究以来,香港已有20年没有进行过彻底的基准测试。这项研究是根据香港五座在建建筑物的77次泼水记录,为大型建筑物上部结构泼水的场地/供应商资源匹配或协调表现提供最新基准。本研究还旨在评估是否有任何证据表明,自2000年以来,现场/工厂协调性能有所改善,尤其是由于采用了先进技术,现在可以全天实时监控卡车搅拌机的位置。然而,对该行业来说非常重要的是,这项研究得出的最重要的发现是,在这20年的时间间隔内,没有证据支持场地/供应商资源协调有所改善的主张。卡车搅拌机的位置跟踪系统需要引入数据分析仿真软件,并实时优化调度。
Benchmarking site-plant resource matching performance of ready-mixed concrete delivery and placing
Since on-time concrete delivery is important to both contractors and suppliers, performance benchmarking of the concrete delivery process, as actually achieved in practice, is a worthwhile undertaking of potential benefit to the construction industry. However, there has been no thorough such benchmarking in Hong Kong for 20 years, since the study by Anson et al. (2002). This research study has provided an up-to-date benchmark of the site/supplier resource matching, or coordination, performance for big building superstructure pours, based on study of the records of 77 pours placed on five buildings under construction in Hong Kong. This research study also aimed to assess whether there was any evidence to suggest that site/ plant coordination performance has improved since 2000, not least due to the adoption of advanced technologies, which nowadays monitor the locations of truckmixers in real time throughout the day. Of great importance to the industry, however, and the most significant finding arising from this study, is that there is no support for the proposition that site/supplier resource coordination has improved over that 20-year interval. Truckmixer position tracking systems need to be capitalised upon with the introduction of data analysis simulation software and optimising scheduling applied in real time.