{"title":"吉尔吉特-巴尔蒂斯坦Diamer Basha大坝重要因素Eia指南的制定","authors":"Wajahat Ali, I. Hussain, H. Rashid, A. Nasir","doi":"10.2478/pjg-2020-0006","DOIUrl":null,"url":null,"abstract":"Abstract Energy crises is the one of the major problem that was faced by Pakistan in order to overcome on that crises Pakistan need to be developed and improvement in energy sector, Throughout in the country the demand of water and power increasing day by day therefore hydropower project are the need of the hour in Pakistan. Before initiation of any project EIA play important role in evaluating the nature of the project on different factors. Government of Pakistan planned one of the mega hydropower project diamer basha dam was planned in Gilgit Baltistan. It was intended to conduct the research work on describing significant factors so as to evaluate the influence of the project on them and develop guidelines for environmental assessment for these factors. To find out these significant factors the methodology was adapted to conducting field investigation. Besides to assess the relevant impact questionnaires were developed. Finally, in order to reduce the negative impact of the project on the predefine factor mitigation measure was suggested. It is anticipated that this study work support in developing structure work to be executed as mitigation measures and boost the advantages of the project.","PeriodicalId":32520,"journal":{"name":"Pakistan Journal of Geology","volume":"4 1","pages":"43 - 55"},"PeriodicalIF":0.0000,"publicationDate":"2020-05-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Development of Eia Guidelines of Significant Factors For Diamer Basha Dam Gilgit Baltistan\",\"authors\":\"Wajahat Ali, I. Hussain, H. Rashid, A. Nasir\",\"doi\":\"10.2478/pjg-2020-0006\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Energy crises is the one of the major problem that was faced by Pakistan in order to overcome on that crises Pakistan need to be developed and improvement in energy sector, Throughout in the country the demand of water and power increasing day by day therefore hydropower project are the need of the hour in Pakistan. Before initiation of any project EIA play important role in evaluating the nature of the project on different factors. Government of Pakistan planned one of the mega hydropower project diamer basha dam was planned in Gilgit Baltistan. It was intended to conduct the research work on describing significant factors so as to evaluate the influence of the project on them and develop guidelines for environmental assessment for these factors. To find out these significant factors the methodology was adapted to conducting field investigation. Besides to assess the relevant impact questionnaires were developed. Finally, in order to reduce the negative impact of the project on the predefine factor mitigation measure was suggested. It is anticipated that this study work support in developing structure work to be executed as mitigation measures and boost the advantages of the project.\",\"PeriodicalId\":32520,\"journal\":{\"name\":\"Pakistan Journal of Geology\",\"volume\":\"4 1\",\"pages\":\"43 - 55\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-05-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Pakistan Journal of Geology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/pjg-2020-0006\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Pakistan Journal of Geology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/pjg-2020-0006","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

能源危机是巴基斯坦面临的主要问题之一,为了克服这些危机,巴基斯坦需要发展和改善能源部门,整个国家对水和电力的需求日益增加,因此水电项目是巴基斯坦的当务之急。在任何项目启动之前,环评在评估项目的不同因素的性质方面发挥着重要作用。巴基斯坦政府计划在吉尔吉特-巴尔蒂斯坦建造一个大型水电项目直径巴沙大坝。其目的是开展描述重要因素的研究工作,以评价项目对这些因素的影响,并为这些因素制定环境评价准则。为了找出这些重要因素,采用了实地调查的方法。此外,为了评估相关影响,还编制了调查问卷。最后,为了减少项目对预定义因素的负面影响,提出了缓解措施。预期这项研究工作可协助发展结构工程,作为缓解措施,并提升工程项目的优势。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Development of Eia Guidelines of Significant Factors For Diamer Basha Dam Gilgit Baltistan
Abstract Energy crises is the one of the major problem that was faced by Pakistan in order to overcome on that crises Pakistan need to be developed and improvement in energy sector, Throughout in the country the demand of water and power increasing day by day therefore hydropower project are the need of the hour in Pakistan. Before initiation of any project EIA play important role in evaluating the nature of the project on different factors. Government of Pakistan planned one of the mega hydropower project diamer basha dam was planned in Gilgit Baltistan. It was intended to conduct the research work on describing significant factors so as to evaluate the influence of the project on them and develop guidelines for environmental assessment for these factors. To find out these significant factors the methodology was adapted to conducting field investigation. Besides to assess the relevant impact questionnaires were developed. Finally, in order to reduce the negative impact of the project on the predefine factor mitigation measure was suggested. It is anticipated that this study work support in developing structure work to be executed as mitigation measures and boost the advantages of the project.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信