{"title":"萤火虫法优化三个发电厂的输出功率","authors":"Y. M. Safarudin, Dina Mariani","doi":"10.32497/eksergi.v19i01.3907","DOIUrl":null,"url":null,"abstract":"Continuing the previous article that use merit order, the simplest method in economic dispatch, this article pursue to optimize the output of three power plants using more advanced algorithm, the firefly. The plants used are similar to the previous paper which are three generators used to supply a load of 975 MW. Simulation is used by taking into account losses. The results show that in spite of having higher losses, firefly algorithm managed to calculate a better result than merit orders did by 0,15%. ","PeriodicalId":30703,"journal":{"name":"Eksergi","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-02-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Optimizing Three Power Plants’ Output Power Using Firefly Method\",\"authors\":\"Y. M. Safarudin, Dina Mariani\",\"doi\":\"10.32497/eksergi.v19i01.3907\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Continuing the previous article that use merit order, the simplest method in economic dispatch, this article pursue to optimize the output of three power plants using more advanced algorithm, the firefly. The plants used are similar to the previous paper which are three generators used to supply a load of 975 MW. Simulation is used by taking into account losses. The results show that in spite of having higher losses, firefly algorithm managed to calculate a better result than merit orders did by 0,15%. \",\"PeriodicalId\":30703,\"journal\":{\"name\":\"Eksergi\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-02-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Eksergi\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.32497/eksergi.v19i01.3907\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Eksergi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32497/eksergi.v19i01.3907","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

延续上一篇文章中使用经济调度中最简单的优序法,本文采用更先进的算法——萤火虫算法对三个电厂的输出进行优化。所使用的电厂与之前的论文类似,即三台发电机用于提供975兆瓦的负荷。模拟是通过考虑损失来实现的。结果表明,尽管萤火虫算法具有较高的损失,但它的计算结果比择优订单的计算结果好0.15%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Optimizing Three Power Plants’ Output Power Using Firefly Method
Continuing the previous article that use merit order, the simplest method in economic dispatch, this article pursue to optimize the output of three power plants using more advanced algorithm, the firefly. The plants used are similar to the previous paper which are three generators used to supply a load of 975 MW. Simulation is used by taking into account losses. The results show that in spite of having higher losses, firefly algorithm managed to calculate a better result than merit orders did by 0,15%. 
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
4 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信