基于上水库水位的水电站频率调节

IF 0.5 Q4 ENERGY & FUELS
Platero, Sánchez, Nicolet, Allenbach
{"title":"基于上水库水位的水电站频率调节","authors":"Platero, Sánchez, Nicolet, Allenbach","doi":"10.3390/EN12091637","DOIUrl":null,"url":null,"abstract":"This paper presents a novel method of hydro power plant operation, based on the control of the injectors’ or wicked gates opening time as a function of the upper reservoir level. In this way, a faster power injection, depending on the current water level on the upper reservoir, could be achieved. When this level is higher, the opening time could be shorter; hence, hydropower ramps could be steeper. Due to this control, frequency excursions and load shedding trips are smaller, thus the power quality is enhanced. This method has been tested and validated by computer simulations in a case study located in El Hierro island, Canary Archipelago (Spain). The simulations made show significant improvements, dependent on upper reservoir water level, in power quality.","PeriodicalId":29914,"journal":{"name":"Advances in Energy Research","volume":" ","pages":""},"PeriodicalIF":0.5000,"publicationDate":"2019-04-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.3390/EN12091637","citationCount":"8","resultStr":"{\"title\":\"Hydropower Plants Frequency Regulation Depending on Upper Reservoir Water Level\",\"authors\":\"Platero, Sánchez, Nicolet, Allenbach\",\"doi\":\"10.3390/EN12091637\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents a novel method of hydro power plant operation, based on the control of the injectors’ or wicked gates opening time as a function of the upper reservoir level. In this way, a faster power injection, depending on the current water level on the upper reservoir, could be achieved. When this level is higher, the opening time could be shorter; hence, hydropower ramps could be steeper. Due to this control, frequency excursions and load shedding trips are smaller, thus the power quality is enhanced. This method has been tested and validated by computer simulations in a case study located in El Hierro island, Canary Archipelago (Spain). The simulations made show significant improvements, dependent on upper reservoir water level, in power quality.\",\"PeriodicalId\":29914,\"journal\":{\"name\":\"Advances in Energy Research\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.5000,\"publicationDate\":\"2019-04-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.3390/EN12091637\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Advances in Energy Research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3390/EN12091637\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENERGY & FUELS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Advances in Energy Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3390/EN12091637","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 8

摘要

本文提出了一种新的水力发电厂运行方法,该方法基于根据水库上游水位控制喷射器或闸门开启时间。通过这种方式,可以根据上层水库的当前水位实现更快的功率注入。当这个水平较高时,开放时间可能会更短;因此,水力发电的斜坡可能更陡。由于这种控制,频率偏移和甩负荷跳闸更小,从而提高了电能质量。该方法已在加那利群岛(西班牙)的El Hierro岛的一个案例研究中通过计算机模拟进行了测试和验证。所做的模拟显示,根据水库上游水位,电力质量有了显著改善。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Hydropower Plants Frequency Regulation Depending on Upper Reservoir Water Level
This paper presents a novel method of hydro power plant operation, based on the control of the injectors’ or wicked gates opening time as a function of the upper reservoir level. In this way, a faster power injection, depending on the current water level on the upper reservoir, could be achieved. When this level is higher, the opening time could be shorter; hence, hydropower ramps could be steeper. Due to this control, frequency excursions and load shedding trips are smaller, thus the power quality is enhanced. This method has been tested and validated by computer simulations in a case study located in El Hierro island, Canary Archipelago (Spain). The simulations made show significant improvements, dependent on upper reservoir water level, in power quality.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Advances in Energy Research
Advances in Energy Research ENERGY & FUELS-
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信