{"title":"通过控制极限分析和离散事件模拟的线平衡提高BOB T恤的生产率(案例研究:MAA服装纺织厂)","authors":"A. Yemane","doi":"10.22094/JOIE.2020.561766.1545","DOIUrl":null,"url":null,"abstract":"This study deals with line balancing of BOB T-shirt model with the help of control limit analysis and discrete event simulation of the assembly lines. In this study control limit analysis is used to measure the performance of the assembly line and used to show the bottleneck operations of the assembly line and line balancing technique improves the productivity of the sewing line of the model. BOB T-shirt model has 16 main operations and each operation’s time is analyzed as standard minute value (SMV). The main bottleneck operations are analyzed using the control limit analysis and simulation modeling. Based on the SMV of each operation, those operations which are out of lower control limit and upper control limit is called us bottlenecks of the sewing lines of the garment section and the 1st bottleneck operation is tread trimming operation. When we apply control limit analysis and discrete event simulation technique for the line balancing; the daily output has been increased from 1032 pieces to 1289 pieces. And labor productivity and machine productivity are increased from 46.9 and 54.32 to 58.59 and 71.61 respectively. And then finally, the profit that the line generated also increased from 22704 to 28358birr.","PeriodicalId":36956,"journal":{"name":"Journal of Optimization in Industrial Engineering","volume":"14 1","pages":"225-238"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Productivity Improvement of BOB T-shirt through Line Balancing Using Control Limit analysis and discrete event simulation (Case study: - MAA Garment and Textile Factory)\",\"authors\":\"A. Yemane\",\"doi\":\"10.22094/JOIE.2020.561766.1545\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study deals with line balancing of BOB T-shirt model with the help of control limit analysis and discrete event simulation of the assembly lines. In this study control limit analysis is used to measure the performance of the assembly line and used to show the bottleneck operations of the assembly line and line balancing technique improves the productivity of the sewing line of the model. BOB T-shirt model has 16 main operations and each operation’s time is analyzed as standard minute value (SMV). The main bottleneck operations are analyzed using the control limit analysis and simulation modeling. Based on the SMV of each operation, those operations which are out of lower control limit and upper control limit is called us bottlenecks of the sewing lines of the garment section and the 1st bottleneck operation is tread trimming operation. When we apply control limit analysis and discrete event simulation technique for the line balancing; the daily output has been increased from 1032 pieces to 1289 pieces. And labor productivity and machine productivity are increased from 46.9 and 54.32 to 58.59 and 71.61 respectively. And then finally, the profit that the line generated also increased from 22704 to 28358birr.\",\"PeriodicalId\":36956,\"journal\":{\"name\":\"Journal of Optimization in Industrial Engineering\",\"volume\":\"14 1\",\"pages\":\"225-238\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Optimization in Industrial Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.22094/JOIE.2020.561766.1545\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Optimization in Industrial Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22094/JOIE.2020.561766.1545","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 2

摘要

利用控制极限分析和装配线离散事件仿真,研究了BOB t恤模型的生产线平衡问题。在本研究中,采用控制极限分析来衡量装配线的性能,并使用控制极限分析来显示装配线的瓶颈操作和生产线平衡技术提高了模型缝纫线的生产率。BOB t恤模型有16个主要工序,每个工序的时间用标准分值(SMV)进行分析。利用控制极限分析和仿真建模对主要瓶颈操作进行了分析。根据各工序的SMV,将超出控制下限和控制上限的工序称为制衣段缝纫线的瓶颈工序,第一个瓶颈工序为修整踏面工序。当采用控制极限分析和离散事件仿真技术进行线路平衡时;日产量从1032件增加到1289件。劳动生产率和机器生产率分别从46.9和54.32提高到58.59和71.61。最后,这条线产生的利润也从22704美元增加到28358美元。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Productivity Improvement of BOB T-shirt through Line Balancing Using Control Limit analysis and discrete event simulation (Case study: - MAA Garment and Textile Factory)
This study deals with line balancing of BOB T-shirt model with the help of control limit analysis and discrete event simulation of the assembly lines. In this study control limit analysis is used to measure the performance of the assembly line and used to show the bottleneck operations of the assembly line and line balancing technique improves the productivity of the sewing line of the model. BOB T-shirt model has 16 main operations and each operation’s time is analyzed as standard minute value (SMV). The main bottleneck operations are analyzed using the control limit analysis and simulation modeling. Based on the SMV of each operation, those operations which are out of lower control limit and upper control limit is called us bottlenecks of the sewing lines of the garment section and the 1st bottleneck operation is tread trimming operation. When we apply control limit analysis and discrete event simulation technique for the line balancing; the daily output has been increased from 1032 pieces to 1289 pieces. And labor productivity and machine productivity are increased from 46.9 and 54.32 to 58.59 and 71.61 respectively. And then finally, the profit that the line generated also increased from 22704 to 28358birr.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Optimization in Industrial Engineering
Journal of Optimization in Industrial Engineering Engineering-Industrial and Manufacturing Engineering
CiteScore
2.90
自引率
0.00%
发文量
0
审稿时长
32 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信