{"title":"与公私合作住房项目相关的关键风险因素","authors":"Y. N. Sanda, N. Anigbogu, Ezekiel A. Rugu, Laraba Y. Babas","doi":"10.2478/jeppm-2020-0006","DOIUrl":null,"url":null,"abstract":"Abstract Studies have shown that project risks are responsible for the failure of most Public Private Partnership (PPP) projects. The study examined the critical risk factors associated with PPP housing projects. Data for the research was obtained through a questionnaire. The data were analysed using descriptive statistics and mean ratings. Corruption and bribery among contracting parties (0.681), Exchange rate volatility (0.621) Availability of development funds (0.599) and Change in government (0.580) were the critical risk factors identified. The study also indicated that project cost is highly influenced by lack of development funds and changes in interest rates. The quality of PPP housing projects in Abuja was found to be influenced by partner selection risks. The study suggested a competitive, transparent, and efficient bid process to eliminate corruption, workable strategies for ensuring the availability of development funds at a cheaper rate and adopting mixed strategy in which government continues to provide social housing to the low-income class while providing the enabling environment for the private sector to thrive.","PeriodicalId":53274,"journal":{"name":"Journal of Engineering Project and Production Management","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2020-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Critical Risk Factors Associated with Public Private Partnership Housing Projects\",\"authors\":\"Y. N. Sanda, N. Anigbogu, Ezekiel A. Rugu, Laraba Y. Babas\",\"doi\":\"10.2478/jeppm-2020-0006\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Studies have shown that project risks are responsible for the failure of most Public Private Partnership (PPP) projects. The study examined the critical risk factors associated with PPP housing projects. Data for the research was obtained through a questionnaire. The data were analysed using descriptive statistics and mean ratings. Corruption and bribery among contracting parties (0.681), Exchange rate volatility (0.621) Availability of development funds (0.599) and Change in government (0.580) were the critical risk factors identified. The study also indicated that project cost is highly influenced by lack of development funds and changes in interest rates. The quality of PPP housing projects in Abuja was found to be influenced by partner selection risks. The study suggested a competitive, transparent, and efficient bid process to eliminate corruption, workable strategies for ensuring the availability of development funds at a cheaper rate and adopting mixed strategy in which government continues to provide social housing to the low-income class while providing the enabling environment for the private sector to thrive.\",\"PeriodicalId\":53274,\"journal\":{\"name\":\"Journal of Engineering Project and Production Management\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Engineering Project and Production Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/jeppm-2020-0006\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Business, Management and Accounting\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Project and Production Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/jeppm-2020-0006","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Business, Management and Accounting","Score":null,"Total":0}
引用次数: 6

摘要

摘要研究表明,项目风险是大多数公私合作项目失败的原因。该研究考察了与PPP住房项目相关的关键风险因素。研究数据是通过问卷调查获得的。使用描述性统计和平均评分对数据进行分析。缔约方之间的腐败和贿赂(0.681)、汇率波动(0.621)发展资金的可用性(0.599)和政府更迭(0.580)是确定的关键风险因素。研究还表明,项目成本在很大程度上受到开发资金短缺和利率变化的影响。阿布贾PPP住房项目的质量受到合作伙伴选择风险的影响。该研究提出了一个有竞争力、透明和高效的投标程序来消除腐败,制定切实可行的战略来确保以更低的价格获得发展资金,并采取混合战略,即政府继续向低收入阶层提供社会住房,同时为私营部门的繁荣提供有利的环境。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Critical Risk Factors Associated with Public Private Partnership Housing Projects
Abstract Studies have shown that project risks are responsible for the failure of most Public Private Partnership (PPP) projects. The study examined the critical risk factors associated with PPP housing projects. Data for the research was obtained through a questionnaire. The data were analysed using descriptive statistics and mean ratings. Corruption and bribery among contracting parties (0.681), Exchange rate volatility (0.621) Availability of development funds (0.599) and Change in government (0.580) were the critical risk factors identified. The study also indicated that project cost is highly influenced by lack of development funds and changes in interest rates. The quality of PPP housing projects in Abuja was found to be influenced by partner selection risks. The study suggested a competitive, transparent, and efficient bid process to eliminate corruption, workable strategies for ensuring the availability of development funds at a cheaper rate and adopting mixed strategy in which government continues to provide social housing to the low-income class while providing the enabling environment for the private sector to thrive.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Engineering Project and Production Management
Journal of Engineering Project and Production Management Business, Management and Accounting-Business, Management and Accounting (miscellaneous)
CiteScore
2.30
自引率
0.00%
发文量
24
审稿时长
30 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信