{"title":"国家援助规则和基础设施公共融资。Autostrada Wielkopolska美国案。","authors":"P. Kubera","doi":"10.1515/bjes-2020-0005","DOIUrl":null,"url":null,"abstract":"Abstract The operation of a toll road typically involves an economic activity for which State aid rules apply. However, if the construction and operation of the road infrastructure is bundled and they are tendered out together, they usually fall outside the State aid regime. The reason for it lies in the fact that the use of competitive procurement procedures aim to increase the efficiency of public expenditure and to ensure a level playing field for private operators to compete for public contracts. Nevertheless, based on the European Commission’s decisional practice, it transpires that an economic advantage for a concession holder cannot be ruled out automatically, in particular when there are amendments made to the original agreement. On the example of the Autostrada Wielkopolska S.A. case, critical State aid issues are discussed, among others, the application of State aid rules to public financing of infrastructure, the amendments made to a concession contract in the light of the risk assignment problem, as well as the existence of State aid in the form of overcompensation for a concession holder. The considerations are carried out on the canvas of a concrete case; however, they are enriched by the analysis of relevant legal provisions as well as conclusions from the EU courts and the European Commission decisions made in similar cases.","PeriodicalId":29836,"journal":{"name":"TalTech Journal of European Studies","volume":"10 1","pages":"77 - 96"},"PeriodicalIF":0.6000,"publicationDate":"2020-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"State Aid Rules and Public Financing of Infrastructure. The Case of Autostrada Wielkopolska S.A.\",\"authors\":\"P. Kubera\",\"doi\":\"10.1515/bjes-2020-0005\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract The operation of a toll road typically involves an economic activity for which State aid rules apply. However, if the construction and operation of the road infrastructure is bundled and they are tendered out together, they usually fall outside the State aid regime. The reason for it lies in the fact that the use of competitive procurement procedures aim to increase the efficiency of public expenditure and to ensure a level playing field for private operators to compete for public contracts. Nevertheless, based on the European Commission’s decisional practice, it transpires that an economic advantage for a concession holder cannot be ruled out automatically, in particular when there are amendments made to the original agreement. On the example of the Autostrada Wielkopolska S.A. case, critical State aid issues are discussed, among others, the application of State aid rules to public financing of infrastructure, the amendments made to a concession contract in the light of the risk assignment problem, as well as the existence of State aid in the form of overcompensation for a concession holder. The considerations are carried out on the canvas of a concrete case; however, they are enriched by the analysis of relevant legal provisions as well as conclusions from the EU courts and the European Commission decisions made in similar cases.\",\"PeriodicalId\":29836,\"journal\":{\"name\":\"TalTech Journal of European Studies\",\"volume\":\"10 1\",\"pages\":\"77 - 96\"},\"PeriodicalIF\":0.6000,\"publicationDate\":\"2020-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"TalTech Journal of European Studies\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1515/bjes-2020-0005\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"LAW\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"TalTech Journal of European Studies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1515/bjes-2020-0005","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"LAW","Score":null,"Total":0}
引用次数: 4

摘要

收费公路的运营通常涉及适用国家援助规则的经济活动。然而,如果道路基础设施的建设和运营是捆绑在一起的,并且是一起招标的,那么它们通常不属于国家援助制度。其原因在于,使用竞争性采购程序的目的是提高公共支出的效率,并确保私营运营商有一个公平的竞争环境来竞争公共合同。然而,根据欧洲联盟委员会的决策实践,不能自动排除特许权持有人的经济优势,特别是在对原始协议进行修订时。以Autostrada Wielkopolska美国案为例,讨论了关键的国家援助问题,其中包括国家援助规则对基础设施公共融资的适用、根据风险分配问题对特许权合同所作的修正,以及是否存在对特许权持有人的过度补偿形式的国家援助。这些考虑是在一个具体案例的画布上进行的;然而,对相关法律条款的分析以及欧盟法院的结论和欧盟委员会在类似案件中作出的决定丰富了这些结论。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
State Aid Rules and Public Financing of Infrastructure. The Case of Autostrada Wielkopolska S.A.
Abstract The operation of a toll road typically involves an economic activity for which State aid rules apply. However, if the construction and operation of the road infrastructure is bundled and they are tendered out together, they usually fall outside the State aid regime. The reason for it lies in the fact that the use of competitive procurement procedures aim to increase the efficiency of public expenditure and to ensure a level playing field for private operators to compete for public contracts. Nevertheless, based on the European Commission’s decisional practice, it transpires that an economic advantage for a concession holder cannot be ruled out automatically, in particular when there are amendments made to the original agreement. On the example of the Autostrada Wielkopolska S.A. case, critical State aid issues are discussed, among others, the application of State aid rules to public financing of infrastructure, the amendments made to a concession contract in the light of the risk assignment problem, as well as the existence of State aid in the form of overcompensation for a concession holder. The considerations are carried out on the canvas of a concrete case; however, they are enriched by the analysis of relevant legal provisions as well as conclusions from the EU courts and the European Commission decisions made in similar cases.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
1.90
自引率
62.50%
发文量
8
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信