Danilo B. Garrido Alves, Daniela Arantes Prata, Camila Manfredini de Abreu
{"title":"萨马尔科案的新赔偿途径?简化赔偿制度的(非)合法性概述","authors":"Danilo B. Garrido Alves, Daniela Arantes Prata, Camila Manfredini de Abreu","doi":"10.1017/bhj.2021.59","DOIUrl":null,"url":null,"abstract":"On 5 November 2015, the Fundão Dam collapsed, causing the most devastating tailings dam disaster to date. The dam was operated by Samarco S.A., a joint venture by Vale, Brazil’s biggest mining company, and BHP Billiton, the world’s largest mining company.1 Its tailings travelled down the Doce River for ca 700 kilometres until they reached the ocean, affecting 42 municipalities, two states, and thousands of communities along the way. The disaster caused myriad social, environmental and economic impacts: nineteen individuals were killed, and thousands endured physical or psychological harm; water resources and the soil were polluted; habitats were irreversibly destroyed; and the local economy suffered long-lasting damage. Traditional and indigenous communities were especially harmed, as their historical, social, religious and cultural relationships with their land led to even more profound harms.2","PeriodicalId":9399,"journal":{"name":"Business and Human Rights Journal","volume":null,"pages":null},"PeriodicalIF":2.3000,"publicationDate":"2022-08-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A New Route for Redress in the Samarco Case? An Overview of the Simplified Indemnification System’s (Un)Lawfulness\",\"authors\":\"Danilo B. Garrido Alves, Daniela Arantes Prata, Camila Manfredini de Abreu\",\"doi\":\"10.1017/bhj.2021.59\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"On 5 November 2015, the Fundão Dam collapsed, causing the most devastating tailings dam disaster to date. The dam was operated by Samarco S.A., a joint venture by Vale, Brazil’s biggest mining company, and BHP Billiton, the world’s largest mining company.1 Its tailings travelled down the Doce River for ca 700 kilometres until they reached the ocean, affecting 42 municipalities, two states, and thousands of communities along the way. The disaster caused myriad social, environmental and economic impacts: nineteen individuals were killed, and thousands endured physical or psychological harm; water resources and the soil were polluted; habitats were irreversibly destroyed; and the local economy suffered long-lasting damage. Traditional and indigenous communities were especially harmed, as their historical, social, religious and cultural relationships with their land led to even more profound harms.2\",\"PeriodicalId\":9399,\"journal\":{\"name\":\"Business and Human Rights Journal\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":2.3000,\"publicationDate\":\"2022-08-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Business and Human Rights Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1017/bhj.2021.59\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"BUSINESS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Business and Human Rights Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1017/bhj.2021.59","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"BUSINESS","Score":null,"Total":0}
A New Route for Redress in the Samarco Case? An Overview of the Simplified Indemnification System’s (Un)Lawfulness
On 5 November 2015, the Fundão Dam collapsed, causing the most devastating tailings dam disaster to date. The dam was operated by Samarco S.A., a joint venture by Vale, Brazil’s biggest mining company, and BHP Billiton, the world’s largest mining company.1 Its tailings travelled down the Doce River for ca 700 kilometres until they reached the ocean, affecting 42 municipalities, two states, and thousands of communities along the way. The disaster caused myriad social, environmental and economic impacts: nineteen individuals were killed, and thousands endured physical or psychological harm; water resources and the soil were polluted; habitats were irreversibly destroyed; and the local economy suffered long-lasting damage. Traditional and indigenous communities were especially harmed, as their historical, social, religious and cultural relationships with their land led to even more profound harms.2
期刊介绍:
The Business and Human Rights Journal (BHRJ) provides an authoritative platform for scholarly debate on all issues concerning the intersection of business and human rights in an open, critical and interdisciplinary manner. It seeks to advance the academic discussion on business and human rights as well as promote concern for human rights in business practice. BHRJ strives for the broadest possible scope, authorship and readership. Its scope encompasses interface of any type of business enterprise with human rights, environmental rights, labour rights and the collective rights of vulnerable groups. The Editors welcome theoretical, empirical and policy / reform-oriented perspectives and encourage submissions from academics and practitioners in all global regions and all relevant disciplines. A dialogue beyond academia is fostered as peer-reviewed articles are published alongside shorter ‘Developments in the Field’ items that include policy, legal and regulatory developments, as well as case studies and insight pieces.