{"title":"基于Campbell-Dudek-Smith方法的生产调度分析。面粉厂雅加达Bogasari分部","authors":"P. Purwati, Santika Sari","doi":"10.31315/OPSI.V13I2.3674","DOIUrl":null,"url":null,"abstract":"Bogasari is one of the largest wheat flour companies in Indonesia, besides wheat flour also produces a byproduct namely pasta, pellet, and livestock food. As a large company that produces many products need to do production scheduling so that the production time and product quantity produced reach the maximum. To avoid the extension of the production completion time that can ultimately lower the production quantity, one of the strategies that the company can do is by scheduling and allocating the company's resources. The selection of the right scheduling method needs to be done so that the company can have a decision in production scheduling that results in a minimum production completion time and the demand can be fulfilled on time. The methods used are CDS (Campbell Dudek Smith), SPT (Shortest Processing Time), LPT (Longest Processing Time), EDD (Earliest Due Date), and FCFS (First Come First Served). From the results of the research conducted the best scheduling method is the CDS with a makespan of 2,576,807.5 minutes and a flowtime of 21,665,932 minutes","PeriodicalId":34167,"journal":{"name":"OPSI","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-12-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Analisis Penjadwalan Produksi Dengan Metode Campbell Dudek Smith (CDS), PT. ISM TBK. Divisi Bogasari Flour Mills Jakarta\",\"authors\":\"P. Purwati, Santika Sari\",\"doi\":\"10.31315/OPSI.V13I2.3674\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Bogasari is one of the largest wheat flour companies in Indonesia, besides wheat flour also produces a byproduct namely pasta, pellet, and livestock food. As a large company that produces many products need to do production scheduling so that the production time and product quantity produced reach the maximum. To avoid the extension of the production completion time that can ultimately lower the production quantity, one of the strategies that the company can do is by scheduling and allocating the company's resources. The selection of the right scheduling method needs to be done so that the company can have a decision in production scheduling that results in a minimum production completion time and the demand can be fulfilled on time. The methods used are CDS (Campbell Dudek Smith), SPT (Shortest Processing Time), LPT (Longest Processing Time), EDD (Earliest Due Date), and FCFS (First Come First Served). From the results of the research conducted the best scheduling method is the CDS with a makespan of 2,576,807.5 minutes and a flowtime of 21,665,932 minutes\",\"PeriodicalId\":34167,\"journal\":{\"name\":\"OPSI\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-12-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"OPSI\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31315/OPSI.V13I2.3674\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"OPSI","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31315/OPSI.V13I2.3674","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

Bogasari是印度尼西亚最大的小麦粉公司之一,除此之外,小麦粉还生产一种副产品,即意大利面、颗粒和牲畜食品。作为一家生产许多产品的大公司,需要进行生产调度,以使生产时间和产品数量达到最大值。为了避免生产完成时间的延长最终会降低生产数量,公司可以采取的策略之一是安排和分配公司的资源。需要选择正确的调度方法,以便公司能够在生产调度中做出决策,从而获得最短的生产完成时间,并按时满足需求。使用的方法有CDS(Campbell-Dudek-Smith)、SPT(最短处理时间)、LPT(最长处理时间),EDD(最早到期日)和FCFS(先到先得)。根据所进行的研究结果,最佳调度方法是CDS,完成时间为2576807.5分钟,流程时间为21665932分钟
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analisis Penjadwalan Produksi Dengan Metode Campbell Dudek Smith (CDS), PT. ISM TBK. Divisi Bogasari Flour Mills Jakarta
Bogasari is one of the largest wheat flour companies in Indonesia, besides wheat flour also produces a byproduct namely pasta, pellet, and livestock food. As a large company that produces many products need to do production scheduling so that the production time and product quantity produced reach the maximum. To avoid the extension of the production completion time that can ultimately lower the production quantity, one of the strategies that the company can do is by scheduling and allocating the company's resources. The selection of the right scheduling method needs to be done so that the company can have a decision in production scheduling that results in a minimum production completion time and the demand can be fulfilled on time. The methods used are CDS (Campbell Dudek Smith), SPT (Shortest Processing Time), LPT (Longest Processing Time), EDD (Earliest Due Date), and FCFS (First Come First Served). From the results of the research conducted the best scheduling method is the CDS with a makespan of 2,576,807.5 minutes and a flowtime of 21,665,932 minutes
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
16
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信