{"title":"佩里酒吧和威顿FRMS:锻造厂洪水储存区-吸取教训","authors":"Ciara Gill","doi":"10.1680/jdare.22.00093","DOIUrl":null,"url":null,"abstract":"The Perry Barr and Witton Flood Risk Management Scheme in Birmingham protects over 1,300 properties from a 1% Annual Exceedance Probability flood event. A key component of the scheme is the Forge Mill flood storage area. Construction started in 2018 with the Preliminary Certificate signed off in spring 2022. This paper will discuss the project and share lessons learnt from the construction phase. The lessons learnt cover a variety of areas including programme considerations, use of erosion protection matting, trash screen management and use of 3D models in construction.","PeriodicalId":39070,"journal":{"name":"Dams and Reservoirs","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-05-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Perry Bar & Witton FRMS: Forge Mill Flood Storage Area – Lessons Learnt\",\"authors\":\"Ciara Gill\",\"doi\":\"10.1680/jdare.22.00093\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Perry Barr and Witton Flood Risk Management Scheme in Birmingham protects over 1,300 properties from a 1% Annual Exceedance Probability flood event. A key component of the scheme is the Forge Mill flood storage area. Construction started in 2018 with the Preliminary Certificate signed off in spring 2022. This paper will discuss the project and share lessons learnt from the construction phase. The lessons learnt cover a variety of areas including programme considerations, use of erosion protection matting, trash screen management and use of 3D models in construction.\",\"PeriodicalId\":39070,\"journal\":{\"name\":\"Dams and Reservoirs\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-05-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Dams and Reservoirs\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/jdare.22.00093\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Earth and Planetary Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Dams and Reservoirs","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jdare.22.00093","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
Perry Bar & Witton FRMS: Forge Mill Flood Storage Area – Lessons Learnt
The Perry Barr and Witton Flood Risk Management Scheme in Birmingham protects over 1,300 properties from a 1% Annual Exceedance Probability flood event. A key component of the scheme is the Forge Mill flood storage area. Construction started in 2018 with the Preliminary Certificate signed off in spring 2022. This paper will discuss the project and share lessons learnt from the construction phase. The lessons learnt cover a variety of areas including programme considerations, use of erosion protection matting, trash screen management and use of 3D models in construction.