{"title":"水泥基灌浆混凝土坝中的不连续面注入","authors":"João Conde Silva, C. Serra","doi":"10.1080/24705314.2022.2088070","DOIUrl":null,"url":null,"abstract":"ABSTRACT Injecting discontinuities is a recurrent procedure for the rehabilitation of concrete hydraulic structures, namely repairing cracked dam bodies and deteriorated lift and contraction joints. Within this scope, a relatively detailed description of the most important cement injection grouts features is presented, including the main advantages and drawbacks compared to alternatives. The cement-based grouts are among the most utilised materials in these contexts. Economic and environmental related aspects are among the main advantages of cement-based grouts, although some technical features of these grouting materials are also favourable. The equipment utilised for the preparation and for the application of cementitious grouts is also mentioned. This document also addresses aspects related to the assessment of concrete dams’ stability, the preparatory works, the common methodologies and the standard precautions to have into account when planning a rehabilitation operation involving cement grouting for filling cracks or repairing lift or contraction joints in these massive structures. A list of successful rehabilitation case histories is provided, including a short description of the anomalies and their causes, as well as a summary of the main repair measures adopted for each situation.","PeriodicalId":43844,"journal":{"name":"Journal of Structural Integrity and Maintenance","volume":"7 1","pages":"252 - 264"},"PeriodicalIF":3.0000,"publicationDate":"2022-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Injection of discontinuities in concrete dams with cement-based grouts\",\"authors\":\"João Conde Silva, C. Serra\",\"doi\":\"10.1080/24705314.2022.2088070\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT Injecting discontinuities is a recurrent procedure for the rehabilitation of concrete hydraulic structures, namely repairing cracked dam bodies and deteriorated lift and contraction joints. Within this scope, a relatively detailed description of the most important cement injection grouts features is presented, including the main advantages and drawbacks compared to alternatives. The cement-based grouts are among the most utilised materials in these contexts. Economic and environmental related aspects are among the main advantages of cement-based grouts, although some technical features of these grouting materials are also favourable. The equipment utilised for the preparation and for the application of cementitious grouts is also mentioned. This document also addresses aspects related to the assessment of concrete dams’ stability, the preparatory works, the common methodologies and the standard precautions to have into account when planning a rehabilitation operation involving cement grouting for filling cracks or repairing lift or contraction joints in these massive structures. A list of successful rehabilitation case histories is provided, including a short description of the anomalies and their causes, as well as a summary of the main repair measures adopted for each situation.\",\"PeriodicalId\":43844,\"journal\":{\"name\":\"Journal of Structural Integrity and Maintenance\",\"volume\":\"7 1\",\"pages\":\"252 - 264\"},\"PeriodicalIF\":3.0000,\"publicationDate\":\"2022-09-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Structural Integrity and Maintenance\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/24705314.2022.2088070\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Structural Integrity and Maintenance","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/24705314.2022.2088070","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 3

摘要

注入不连续面是混凝土水工结构修复的一个常见程序,即修复开裂的坝体和恶化的升力和收缩缝。在此范围内,介绍了最重要的注水泥注浆特性的相对详细的描述,包括与替代方案相比的主要优点和缺点。在这些情况下,水泥基灌浆是最常用的材料之一。经济和环境相关方面是水泥基注浆的主要优点之一,尽管这些注浆材料的一些技术特性也是有利的。还提到了用于制备和应用胶凝注浆的设备。本文件还阐述了混凝土坝的稳定性评估、准备工作、常用方法和在规划修复工程时应考虑的标准预防措施,这些修复工程涉及水泥灌浆填充裂缝或修复这些大型结构的提升或收缩缝。提供了一系列成功的修复案例,包括对异常及其原因的简短描述,以及对每种情况采取的主要修复措施的总结。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Injection of discontinuities in concrete dams with cement-based grouts
ABSTRACT Injecting discontinuities is a recurrent procedure for the rehabilitation of concrete hydraulic structures, namely repairing cracked dam bodies and deteriorated lift and contraction joints. Within this scope, a relatively detailed description of the most important cement injection grouts features is presented, including the main advantages and drawbacks compared to alternatives. The cement-based grouts are among the most utilised materials in these contexts. Economic and environmental related aspects are among the main advantages of cement-based grouts, although some technical features of these grouting materials are also favourable. The equipment utilised for the preparation and for the application of cementitious grouts is also mentioned. This document also addresses aspects related to the assessment of concrete dams’ stability, the preparatory works, the common methodologies and the standard precautions to have into account when planning a rehabilitation operation involving cement grouting for filling cracks or repairing lift or contraction joints in these massive structures. A list of successful rehabilitation case histories is provided, including a short description of the anomalies and their causes, as well as a summary of the main repair measures adopted for each situation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.90
自引率
9.50%
发文量
24
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信