处理意外情况:印尼和荷兰法律下合同的司法修改

Q3 Social Sciences
Taufiq Adiyanto
{"title":"处理意外情况:印尼和荷兰法律下合同的司法修改","authors":"Taufiq Adiyanto","doi":"10.20956/HALREV.V5I1.1508","DOIUrl":null,"url":null,"abstract":"After the conclusion of a contract, uncontrolled situations of the parties may lead to non-performance of the contract not only in the form of impossibility but also through excessive onerousness. This paper is seeking to compare regulations and cases concerning change of circumstances of the contract under the Indonesian and Dutch legal systems. The aim is to compare a legal remedy when the contract is imbalance and puts other party in burdensome condition to perform. Indonesian law still uses the all-or-nothing approach of termination and rejects the concept of subjective (relative) force majeure to modify a binding contract, although in some cases Indonesian Supreme Court has modified some contracts on the basis good faith principle. Dutch law, on the other hand, has an explicit provision for adjustment of contract on the basis unforeseen circumstances in Article 6:258 DCC. This jurisdiction accepts that unforeseen circumstances can be justified as a basis for adaptation of the contract.","PeriodicalId":30743,"journal":{"name":"Hasanuddin Law Review","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-05-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Dealing with Unexpected Circumstances: Judicial Modification of Contract under Indonesian and Dutch Law\",\"authors\":\"Taufiq Adiyanto\",\"doi\":\"10.20956/HALREV.V5I1.1508\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"After the conclusion of a contract, uncontrolled situations of the parties may lead to non-performance of the contract not only in the form of impossibility but also through excessive onerousness. This paper is seeking to compare regulations and cases concerning change of circumstances of the contract under the Indonesian and Dutch legal systems. The aim is to compare a legal remedy when the contract is imbalance and puts other party in burdensome condition to perform. Indonesian law still uses the all-or-nothing approach of termination and rejects the concept of subjective (relative) force majeure to modify a binding contract, although in some cases Indonesian Supreme Court has modified some contracts on the basis good faith principle. Dutch law, on the other hand, has an explicit provision for adjustment of contract on the basis unforeseen circumstances in Article 6:258 DCC. This jurisdiction accepts that unforeseen circumstances can be justified as a basis for adaptation of the contract.\",\"PeriodicalId\":30743,\"journal\":{\"name\":\"Hasanuddin Law Review\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-05-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Hasanuddin Law Review\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.20956/HALREV.V5I1.1508\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Social Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Hasanuddin Law Review","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.20956/HALREV.V5I1.1508","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Social Sciences","Score":null,"Total":0}
引用次数: 1

摘要

合同订立后,当事人的不可控制的情况可能导致合同不履行,不仅表现为不可能履行,而且表现为过于繁重。本文试图比较印度尼西亚和荷兰法律制度下关于合同情况变更的条例和案例。目的是比较当合同不平衡并使对方处于难以履行的情况下的法律救济。印度尼西亚法律仍然使用全有或全无的终止方法,拒绝主观(相对)不可抗力的概念来修改有约束力的合同,尽管在某些情况下,印度尼西亚最高法院根据诚信原则修改了一些合同。另一方面,荷兰法律在DCC第6条第258款中明确规定根据不可预见的情况调整合同。本司法管辖区承认,不可预见的情况可以作为调整合同的依据。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Dealing with Unexpected Circumstances: Judicial Modification of Contract under Indonesian and Dutch Law
After the conclusion of a contract, uncontrolled situations of the parties may lead to non-performance of the contract not only in the form of impossibility but also through excessive onerousness. This paper is seeking to compare regulations and cases concerning change of circumstances of the contract under the Indonesian and Dutch legal systems. The aim is to compare a legal remedy when the contract is imbalance and puts other party in burdensome condition to perform. Indonesian law still uses the all-or-nothing approach of termination and rejects the concept of subjective (relative) force majeure to modify a binding contract, although in some cases Indonesian Supreme Court has modified some contracts on the basis good faith principle. Dutch law, on the other hand, has an explicit provision for adjustment of contract on the basis unforeseen circumstances in Article 6:258 DCC. This jurisdiction accepts that unforeseen circumstances can be justified as a basis for adaptation of the contract.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Hasanuddin Law Review
Hasanuddin Law Review Social Sciences-Law
CiteScore
1.60
自引率
0.00%
发文量
12
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信