特高压输电线路操作过电压分析及抑制措施

IF 1.7 Q2 Engineering
H. Yanan, Han Bin, Xiang Zutao
{"title":"特高压输电线路操作过电压分析及抑制措施","authors":"H. Yanan, Han Bin, Xiang Zutao","doi":"10.1109/CJECE.2019.2906670","DOIUrl":null,"url":null,"abstract":"As the ultrahigh-voltage (UHV) projects are rapidly developing, it is necessary to investigate the problems involved in overvoltage and insulation, thereby providing a technical basis for future UHV projects. The switching overvoltage of closing no-load lines was simulated and analyzed here using two kinds of typical UHV network structures: the power plant to the grid system and the grid-to-grid system. Different factors, such as line length, mode of operation on the power plant side, and short-circuit capacity, are considered. It is possible for lines shorter than 60 km to eliminate the closing resistor, determined by calculating the probability of flashover. We analyzed the phase selection closing in depth to inhibit the switching overvoltage and considered the factors such as phase deviation and the length of the line. Finally, the applicability of phase selection closing is put forward for lines of different lengths.","PeriodicalId":55287,"journal":{"name":"Canadian Journal of Electrical and Computer Engineering-Revue Canadienne De Genie Electrique et Informatique","volume":null,"pages":null},"PeriodicalIF":1.7000,"publicationDate":"2019-08-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1109/CJECE.2019.2906670","citationCount":"3","resultStr":"{\"title\":\"Analysis of Switching Overvoltage and Suppression Measures in UHV Transmission Lines\",\"authors\":\"H. Yanan, Han Bin, Xiang Zutao\",\"doi\":\"10.1109/CJECE.2019.2906670\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"As the ultrahigh-voltage (UHV) projects are rapidly developing, it is necessary to investigate the problems involved in overvoltage and insulation, thereby providing a technical basis for future UHV projects. The switching overvoltage of closing no-load lines was simulated and analyzed here using two kinds of typical UHV network structures: the power plant to the grid system and the grid-to-grid system. Different factors, such as line length, mode of operation on the power plant side, and short-circuit capacity, are considered. It is possible for lines shorter than 60 km to eliminate the closing resistor, determined by calculating the probability of flashover. We analyzed the phase selection closing in depth to inhibit the switching overvoltage and considered the factors such as phase deviation and the length of the line. Finally, the applicability of phase selection closing is put forward for lines of different lengths.\",\"PeriodicalId\":55287,\"journal\":{\"name\":\"Canadian Journal of Electrical and Computer Engineering-Revue Canadienne De Genie Electrique et Informatique\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.7000,\"publicationDate\":\"2019-08-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1109/CJECE.2019.2906670\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Canadian Journal of Electrical and Computer Engineering-Revue Canadienne De Genie Electrique et Informatique\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CJECE.2019.2906670\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Canadian Journal of Electrical and Computer Engineering-Revue Canadienne De Genie Electrique et Informatique","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CJECE.2019.2906670","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 3

摘要

随着特高压工程的快速发展,有必要对过电压和绝缘问题进行研究,从而为今后的特高压工程提供技术基础。本文采用两种典型的特高压网络结构:电厂对电网系统和电网对电网系统,对合闸空载线路的开关过电压进行了仿真分析。考虑了不同的因素,如线路长度、电厂侧运行方式和短路容量。对于短于60公里的线路,可以通过计算闪络的概率来消除合闸电阻。深入分析了抑制开关过电压的选相合闸,并考虑了相位偏差和线路长度等因素。最后,提出了选相合闸对不同长度线路的适用性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis of Switching Overvoltage and Suppression Measures in UHV Transmission Lines
As the ultrahigh-voltage (UHV) projects are rapidly developing, it is necessary to investigate the problems involved in overvoltage and insulation, thereby providing a technical basis for future UHV projects. The switching overvoltage of closing no-load lines was simulated and analyzed here using two kinds of typical UHV network structures: the power plant to the grid system and the grid-to-grid system. Different factors, such as line length, mode of operation on the power plant side, and short-circuit capacity, are considered. It is possible for lines shorter than 60 km to eliminate the closing resistor, determined by calculating the probability of flashover. We analyzed the phase selection closing in depth to inhibit the switching overvoltage and considered the factors such as phase deviation and the length of the line. Finally, the applicability of phase selection closing is put forward for lines of different lengths.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
27
期刊介绍: The Canadian Journal of Electrical and Computer Engineering (ISSN-0840-8688), issued quarterly, has been publishing high-quality refereed scientific papers in all areas of electrical and computer engineering since 1976
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信