海上设施建设过程中的挑战管理

Q2 Social Sciences
O. Gudmestad
{"title":"海上设施建设过程中的挑战管理","authors":"O. Gudmestad","doi":"10.2495/eq-v4-n3-187-197","DOIUrl":null,"url":null,"abstract":"The construction of offshore facilities for development of oil and gas deposits is preceded by careful Conceptual Studies, front-End Engineering Design Studies (fEED studies) and a Detailed Engineering phase including accurate construction planning. Still, incidents during the Construction Phase could lead to needs for implementation of physical strengthening of construction details or changes to the construction process. These incidents could emerge from information coming from the construction of other facilities, detection of design errors or aspects which were overseen during the engineering phase. Serious consequences, like loss of assets or fatalities, could occur in case the unexpected information was not assessed and changes were not implemented. In this paper, we report on how the design and construction processes were adjusted during the construction phase of the largest of the North Sea platforms, the Troll offshore gas production facilities, as new information became available while the platform was in the construction phase. The assessment of all incoming information and implementation of mitigating measures led to the successful construction, installation and start-up of gas production from the platform. Of particular importance for the success was the open attitude by the operator of the construction project to allow for voicing of concerns from companies hired to do verification, external reviewers and from project personnel. The lessons learned during the construction of these facilities could be very useful for those involved in the design and construction of large projects, in particular in offshore oil and gas projects where the forces due to waves and currents and the strains due to bending and pressures are not always well known initially. The paper is concluded by a recommendation to listen to those presenting warnings to project management during project execution (including the detailed engineering and construction phases).","PeriodicalId":52236,"journal":{"name":"International Journal of Energy Production and Management","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-09-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Management of challenges during the construction of offshore facilities\",\"authors\":\"O. Gudmestad\",\"doi\":\"10.2495/eq-v4-n3-187-197\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The construction of offshore facilities for development of oil and gas deposits is preceded by careful Conceptual Studies, front-End Engineering Design Studies (fEED studies) and a Detailed Engineering phase including accurate construction planning. Still, incidents during the Construction Phase could lead to needs for implementation of physical strengthening of construction details or changes to the construction process. These incidents could emerge from information coming from the construction of other facilities, detection of design errors or aspects which were overseen during the engineering phase. Serious consequences, like loss of assets or fatalities, could occur in case the unexpected information was not assessed and changes were not implemented. In this paper, we report on how the design and construction processes were adjusted during the construction phase of the largest of the North Sea platforms, the Troll offshore gas production facilities, as new information became available while the platform was in the construction phase. The assessment of all incoming information and implementation of mitigating measures led to the successful construction, installation and start-up of gas production from the platform. Of particular importance for the success was the open attitude by the operator of the construction project to allow for voicing of concerns from companies hired to do verification, external reviewers and from project personnel. The lessons learned during the construction of these facilities could be very useful for those involved in the design and construction of large projects, in particular in offshore oil and gas projects where the forces due to waves and currents and the strains due to bending and pressures are not always well known initially. The paper is concluded by a recommendation to listen to those presenting warnings to project management during project execution (including the detailed engineering and construction phases).\",\"PeriodicalId\":52236,\"journal\":{\"name\":\"International Journal of Energy Production and Management\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-09-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Energy Production and Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2495/eq-v4-n3-187-197\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Social Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Energy Production and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2495/eq-v4-n3-187-197","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Social Sciences","Score":null,"Total":0}
引用次数: 3

摘要

为了开发石油和天然气矿藏,海上设施的建设需要经过仔细的概念研究、前端工程设计研究(fEED研究)和详细的工程阶段,包括准确的施工规划。尽管如此,施工阶段发生的事故可能导致需要对施工细节进行物理加固或对施工过程进行更改。这些事故可能来自其他设施的建造、设计错误的发现或工程阶段监督的方面。如果没有对意外信息进行评估和不执行更改,可能会发生资产损失或死亡等严重后果。在本文中,我们报告了在北海最大的平台Troll海上天然气生产设施的建设阶段,随着平台在建设阶段获得新的信息,如何调整设计和施工过程。对所有接收信息的评估和缓解措施的实施导致了平台上天然气生产的成功建设、安装和启动。对成功特别重要的是,建设项目的运营商采取了开放的态度,允许受雇进行核查的公司、外部审查人员和项目人员表达他们的关切。在这些设施建设过程中吸取的经验教训对于那些参与大型项目的设计和建设的人来说非常有用,特别是在海上石油和天然气项目中,由于波浪和水流的力量以及弯曲和压力造成的应变在一开始并不总是很清楚。最后,建议在项目执行过程中(包括详细的工程和施工阶段)听取对项目管理提出的警告。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Management of challenges during the construction of offshore facilities
The construction of offshore facilities for development of oil and gas deposits is preceded by careful Conceptual Studies, front-End Engineering Design Studies (fEED studies) and a Detailed Engineering phase including accurate construction planning. Still, incidents during the Construction Phase could lead to needs for implementation of physical strengthening of construction details or changes to the construction process. These incidents could emerge from information coming from the construction of other facilities, detection of design errors or aspects which were overseen during the engineering phase. Serious consequences, like loss of assets or fatalities, could occur in case the unexpected information was not assessed and changes were not implemented. In this paper, we report on how the design and construction processes were adjusted during the construction phase of the largest of the North Sea platforms, the Troll offshore gas production facilities, as new information became available while the platform was in the construction phase. The assessment of all incoming information and implementation of mitigating measures led to the successful construction, installation and start-up of gas production from the platform. Of particular importance for the success was the open attitude by the operator of the construction project to allow for voicing of concerns from companies hired to do verification, external reviewers and from project personnel. The lessons learned during the construction of these facilities could be very useful for those involved in the design and construction of large projects, in particular in offshore oil and gas projects where the forces due to waves and currents and the strains due to bending and pressures are not always well known initially. The paper is concluded by a recommendation to listen to those presenting warnings to project management during project execution (including the detailed engineering and construction phases).
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
International Journal of Energy Production and Management
International Journal of Energy Production and Management Social Sciences-Sociology and Political Science
CiteScore
2.20
自引率
0.00%
发文量
24
审稿时长
26 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信