{"title":"三维数值模拟技术在地下采场矿柱稳定性分析中的应用","authors":"Sreenivasa Rao Islavath, D. Deb","doi":"10.1504/IJMME.2018.10017386","DOIUrl":null,"url":null,"abstract":"An underground chromite deposit of strike length 290 m, width 20 m and having dip of 10 degrees with horizontal is bounded between the county rock of weathered serpentinite, serpentinite, quartzite and pyroxenite and is planned to be extracted by sub level open stoping method. The portal of the decline and shaft are located in the foot-wall of the orebody. The stope dimensions are to be determined for safe extraction of chromite ore body. For this purpose, three dimensional finite element method is adopted to develop the stope model along with decline and shaft. This study establishes the suitable pillar dimension, length and width of stope and roof bolting based on development of stresses, displacements and yield zone around the excavations.","PeriodicalId":38622,"journal":{"name":"International Journal of Mining and Mineral Engineering","volume":"226 6","pages":"198"},"PeriodicalIF":0.0000,"publicationDate":"2018-11-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Stability analysis of underground stope pillars using three dimensional numerical modelling techniques\",\"authors\":\"Sreenivasa Rao Islavath, D. Deb\",\"doi\":\"10.1504/IJMME.2018.10017386\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"An underground chromite deposit of strike length 290 m, width 20 m and having dip of 10 degrees with horizontal is bounded between the county rock of weathered serpentinite, serpentinite, quartzite and pyroxenite and is planned to be extracted by sub level open stoping method. The portal of the decline and shaft are located in the foot-wall of the orebody. The stope dimensions are to be determined for safe extraction of chromite ore body. For this purpose, three dimensional finite element method is adopted to develop the stope model along with decline and shaft. This study establishes the suitable pillar dimension, length and width of stope and roof bolting based on development of stresses, displacements and yield zone around the excavations.\",\"PeriodicalId\":38622,\"journal\":{\"name\":\"International Journal of Mining and Mineral Engineering\",\"volume\":\"226 6\",\"pages\":\"198\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-11-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Mining and Mineral Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/IJMME.2018.10017386\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Mining and Mineral Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/IJMME.2018.10017386","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

摘要

走向长290m,宽20m,倾角10度,水平的地下铬铁矿矿床位于风化蛇纹岩、蛇纹岩,石英岩和辉石岩的县岩之间,计划采用分段露天采矿法开采。斜坡和竖井的入口位于矿体的下盘。为确保铬铁矿矿体的安全开采,需确定采场尺寸。为此,采用三维有限元方法建立了采场沿坡向和井筒的模型。本研究根据开挖周围应力、位移和屈服区的发展,确定了合适的矿柱尺寸、采场长度和宽度以及顶板锚杆。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Stability analysis of underground stope pillars using three dimensional numerical modelling techniques
An underground chromite deposit of strike length 290 m, width 20 m and having dip of 10 degrees with horizontal is bounded between the county rock of weathered serpentinite, serpentinite, quartzite and pyroxenite and is planned to be extracted by sub level open stoping method. The portal of the decline and shaft are located in the foot-wall of the orebody. The stope dimensions are to be determined for safe extraction of chromite ore body. For this purpose, three dimensional finite element method is adopted to develop the stope model along with decline and shaft. This study establishes the suitable pillar dimension, length and width of stope and roof bolting based on development of stresses, displacements and yield zone around the excavations.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
International Journal of Mining and Mineral Engineering
International Journal of Mining and Mineral Engineering Engineering-Industrial and Manufacturing Engineering
CiteScore
1.90
自引率
0.00%
发文量
1
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信