表面贴装机布局的分层规划。

You-jiao Zeng, Deng-ze Ma, Ye Jin, Jun-qi Yan
{"title":"表面贴装机布局的分层规划。","authors":"You-jiao Zeng,&nbsp;Deng-ze Ma,&nbsp;Ye Jin,&nbsp;Jun-qi Yan","doi":"10.1631/jzus.2004.1449","DOIUrl":null,"url":null,"abstract":"<p><p>For a surface mounting machine (SMM) in printed circuit board (PCB) assembly line, there are four problems, e.g. CAD data conversion, nozzle selection, feeder assignment and placement sequence determination. A hierarchical planning for them to maximize the throughput rate of an SMM is presented here. To minimize set-up time, a CAD data conversion system was first applied that could automatically generate the data for machine placement from CAD design data files. Then an effective nozzle selection approach implemented to minimize the time of nozzle changing. And then, to minimize picking time, an algorithm for feeder assignment was used to make picking multiple components simultaneously as much as possible. Finally, in order to shorten pick-and-place time, a heuristic algorithm was used to determine optimal component placement sequence according to the decided feeder positions. Experiments were conducted on a four head SMM. The experimental results were used to analyse the assembly line performance.</p>","PeriodicalId":85042,"journal":{"name":"Journal of Zhejiang University. Science","volume":"5 11","pages":"1449-55"},"PeriodicalIF":0.0000,"publicationDate":"2004-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1631/jzus.2004.1449","citationCount":"1","resultStr":"{\"title\":\"Hierarchical planning for a surface mounting machine placement.\",\"authors\":\"You-jiao Zeng,&nbsp;Deng-ze Ma,&nbsp;Ye Jin,&nbsp;Jun-qi Yan\",\"doi\":\"10.1631/jzus.2004.1449\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p><p>For a surface mounting machine (SMM) in printed circuit board (PCB) assembly line, there are four problems, e.g. CAD data conversion, nozzle selection, feeder assignment and placement sequence determination. A hierarchical planning for them to maximize the throughput rate of an SMM is presented here. To minimize set-up time, a CAD data conversion system was first applied that could automatically generate the data for machine placement from CAD design data files. Then an effective nozzle selection approach implemented to minimize the time of nozzle changing. And then, to minimize picking time, an algorithm for feeder assignment was used to make picking multiple components simultaneously as much as possible. Finally, in order to shorten pick-and-place time, a heuristic algorithm was used to determine optimal component placement sequence according to the decided feeder positions. Experiments were conducted on a four head SMM. The experimental results were used to analyse the assembly line performance.</p>\",\"PeriodicalId\":85042,\"journal\":{\"name\":\"Journal of Zhejiang University. Science\",\"volume\":\"5 11\",\"pages\":\"1449-55\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2004-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1631/jzus.2004.1449\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Zhejiang University. Science\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1631/jzus.2004.1449\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Zhejiang University. Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1631/jzus.2004.1449","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

对于印刷电路板(PCB)装配线中的表面贴装机(SMM),存在CAD数据转换、喷嘴选择、馈线分配和放置顺序确定四个问题。本文提出了一种分层规划,以使SMM的吞吐率最大化。为了最大限度地减少设置时间,首先应用了CAD数据转换系统,该系统可以从CAD设计数据文件自动生成机器放置数据。在此基础上,提出了一种有效的喷嘴选择方法,以减少喷嘴更换的时间。然后,为了最大限度地减少拣料时间,采用了一种送料机分配算法,使拣料过程中尽可能多地同时拣料。最后,根据确定的送料机位置,采用启发式算法确定零件的最优放置顺序,以缩短取放时间。实验是在四头SMM上进行的。利用实验结果对装配线的性能进行了分析。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Hierarchical planning for a surface mounting machine placement.

For a surface mounting machine (SMM) in printed circuit board (PCB) assembly line, there are four problems, e.g. CAD data conversion, nozzle selection, feeder assignment and placement sequence determination. A hierarchical planning for them to maximize the throughput rate of an SMM is presented here. To minimize set-up time, a CAD data conversion system was first applied that could automatically generate the data for machine placement from CAD design data files. Then an effective nozzle selection approach implemented to minimize the time of nozzle changing. And then, to minimize picking time, an algorithm for feeder assignment was used to make picking multiple components simultaneously as much as possible. Finally, in order to shorten pick-and-place time, a heuristic algorithm was used to determine optimal component placement sequence according to the decided feeder positions. Experiments were conducted on a four head SMM. The experimental results were used to analyse the assembly line performance.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信