{"title":"T.E.A.M.保养:九十年代及以后的成功。","authors":"B M Gumeringer","doi":"","DOIUrl":null,"url":null,"abstract":"<p><p>As hospital engineering departments are being asked to do more with less, they examine their current structure to see how they can become more cost-effective and efficient. This document examines one such department and the steps it took to reengineer and to evaluate both before and after the process.</p>","PeriodicalId":79949,"journal":{"name":"Healthcare facilities management series","volume":" ","pages":"1-11"},"PeriodicalIF":0.0000,"publicationDate":"1996-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"T.E.A.M. maintenance: success for the nineties and beyond.\",\"authors\":\"B M Gumeringer\",\"doi\":\"\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p><p>As hospital engineering departments are being asked to do more with less, they examine their current structure to see how they can become more cost-effective and efficient. This document examines one such department and the steps it took to reengineer and to evaluate both before and after the process.</p>\",\"PeriodicalId\":79949,\"journal\":{\"name\":\"Healthcare facilities management series\",\"volume\":\" \",\"pages\":\"1-11\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1996-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Healthcare facilities management series\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Healthcare facilities management series","FirstCategoryId":"1085","ListUrlMain":"","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
T.E.A.M. maintenance: success for the nineties and beyond.
As hospital engineering departments are being asked to do more with less, they examine their current structure to see how they can become more cost-effective and efficient. This document examines one such department and the steps it took to reengineer and to evaluate both before and after the process.