{"title":"与研究主任一起使用microsoftexcel报告和安排研究中检查。","authors":"T T Kilcoin, D E Mayer","doi":"","DOIUrl":null,"url":null,"abstract":"<p><p>Our Environmental and Metabolic Fate division conducts a variety of different studies that can require between 1 month and 3 years to complete. Our master schedule for this division can contain as many as 50-75 of these studies. Since the Good Laboratory Practices (GLP) regulations require in-study inspections at intervals adequate to assure study integrity and our quality assurance unit (QAU) standard operating procedure (SOP) requires us to monitor studies that last longer than 3 months at least once a quarter, in-study inspection scheduling can be challenging. In order to keep up with the work load described we have developed a method using a spreadsheet program, Excel, to facilitate in-study inspection scheduling through periodic reporting of all QAU inspection activity to the study director. This report makes the scheduling of critical phase and quarterly inspections a cooperative effort between the study director and QAU auditor. The details of the development and utilization of Excel for these \"in-study inspection tracking reports\" are presented.</p>","PeriodicalId":77339,"journal":{"name":"Quality assurance (San Diego, Calif.)","volume":"5 2","pages":"133-40"},"PeriodicalIF":0.0000,"publicationDate":"1997-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Reporting and scheduling in-study inspections with the study director using microsoft Excel.\",\"authors\":\"T T Kilcoin, D E Mayer\",\"doi\":\"\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p><p>Our Environmental and Metabolic Fate division conducts a variety of different studies that can require between 1 month and 3 years to complete. Our master schedule for this division can contain as many as 50-75 of these studies. Since the Good Laboratory Practices (GLP) regulations require in-study inspections at intervals adequate to assure study integrity and our quality assurance unit (QAU) standard operating procedure (SOP) requires us to monitor studies that last longer than 3 months at least once a quarter, in-study inspection scheduling can be challenging. In order to keep up with the work load described we have developed a method using a spreadsheet program, Excel, to facilitate in-study inspection scheduling through periodic reporting of all QAU inspection activity to the study director. This report makes the scheduling of critical phase and quarterly inspections a cooperative effort between the study director and QAU auditor. The details of the development and utilization of Excel for these \\\"in-study inspection tracking reports\\\" are presented.</p>\",\"PeriodicalId\":77339,\"journal\":{\"name\":\"Quality assurance (San Diego, Calif.)\",\"volume\":\"5 2\",\"pages\":\"133-40\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1997-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Quality assurance (San Diego, Calif.)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Quality assurance (San Diego, Calif.)","FirstCategoryId":"1085","ListUrlMain":"","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Reporting and scheduling in-study inspections with the study director using microsoft Excel.
Our Environmental and Metabolic Fate division conducts a variety of different studies that can require between 1 month and 3 years to complete. Our master schedule for this division can contain as many as 50-75 of these studies. Since the Good Laboratory Practices (GLP) regulations require in-study inspections at intervals adequate to assure study integrity and our quality assurance unit (QAU) standard operating procedure (SOP) requires us to monitor studies that last longer than 3 months at least once a quarter, in-study inspection scheduling can be challenging. In order to keep up with the work load described we have developed a method using a spreadsheet program, Excel, to facilitate in-study inspection scheduling through periodic reporting of all QAU inspection activity to the study director. This report makes the scheduling of critical phase and quarterly inspections a cooperative effort between the study director and QAU auditor. The details of the development and utilization of Excel for these "in-study inspection tracking reports" are presented.