具有多个检索位置的层对层梭式存储和检索系统的操作时间和机架稳定性优化

IF 9.1 1区 计算机科学 Q1 COMPUTER SCIENCE, INTERDISCIPLINARY APPLICATIONS
Zhun Xu , Liyun Xu , Huan Shao , Timo Lehmann , Andrea Matta
{"title":"具有多个检索位置的层对层梭式存储和检索系统的操作时间和机架稳定性优化","authors":"Zhun Xu ,&nbsp;Liyun Xu ,&nbsp;Huan Shao ,&nbsp;Timo Lehmann ,&nbsp;Andrea Matta","doi":"10.1016/j.compind.2025.104385","DOIUrl":null,"url":null,"abstract":"<div><div>Tier-to-tier shuttle-based storage and retrieval systems (t-SBS/RSs) are increasingly recognised in the industry for their enhanced flexibility, reduced costs, and improved shuttle utilisation. However, the ineffectiveness of task scheduling (TSc) and retrieval location assignment (LA) schemes diminishes retrieval efficiency and compromises rack stability, thereby elevating retrieval costs and jeopardising system operational safety. Moreover, a potential conflict has been identified between total operation time and rack stability during retrieval operations. Consequently, this study proposes a joint optimisation approach for the batch retrieval TSc and LA challenges in t-SBS/RS, accommodating multiple location distributions for identical cargo types. This issue is modelled as a multi-objective optimisation problem aimed at minimising total operation time while maximising rack stability. To address this, a non-dominated sorting genetic algorithm II (NSGA-II) enhanced by a prior knowledge-based initialisation strategy was proposed. Employing a real case study, several benchmark scenarios were established to assess the effectiveness of the proposed algorithm against five other algorithms, highlighting the superiority of NSGA-II. Additionally, the effectiveness of this method is validated by comparison with classical scheduling policies. The derived Pareto fronts verify the inherent conflict between the two objectives, suggesting that a trade-off is necessary. Finally, managerial insights are offered to highlight the practical application of these findings for warehouse managers.</div></div>","PeriodicalId":55219,"journal":{"name":"Computers in Industry","volume":"173 ","pages":"Article 104385"},"PeriodicalIF":9.1000,"publicationDate":"2025-10-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Operation time and rack stability optimisation in tier-to-tier shuttle-based storage and retrieval systems with multiple retrieval locations\",\"authors\":\"Zhun Xu ,&nbsp;Liyun Xu ,&nbsp;Huan Shao ,&nbsp;Timo Lehmann ,&nbsp;Andrea Matta\",\"doi\":\"10.1016/j.compind.2025.104385\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><div>Tier-to-tier shuttle-based storage and retrieval systems (t-SBS/RSs) are increasingly recognised in the industry for their enhanced flexibility, reduced costs, and improved shuttle utilisation. However, the ineffectiveness of task scheduling (TSc) and retrieval location assignment (LA) schemes diminishes retrieval efficiency and compromises rack stability, thereby elevating retrieval costs and jeopardising system operational safety. Moreover, a potential conflict has been identified between total operation time and rack stability during retrieval operations. Consequently, this study proposes a joint optimisation approach for the batch retrieval TSc and LA challenges in t-SBS/RS, accommodating multiple location distributions for identical cargo types. This issue is modelled as a multi-objective optimisation problem aimed at minimising total operation time while maximising rack stability. To address this, a non-dominated sorting genetic algorithm II (NSGA-II) enhanced by a prior knowledge-based initialisation strategy was proposed. Employing a real case study, several benchmark scenarios were established to assess the effectiveness of the proposed algorithm against five other algorithms, highlighting the superiority of NSGA-II. Additionally, the effectiveness of this method is validated by comparison with classical scheduling policies. The derived Pareto fronts verify the inherent conflict between the two objectives, suggesting that a trade-off is necessary. Finally, managerial insights are offered to highlight the practical application of these findings for warehouse managers.</div></div>\",\"PeriodicalId\":55219,\"journal\":{\"name\":\"Computers in Industry\",\"volume\":\"173 \",\"pages\":\"Article 104385\"},\"PeriodicalIF\":9.1000,\"publicationDate\":\"2025-10-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Computers in Industry\",\"FirstCategoryId\":\"94\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S0166361525001502\",\"RegionNum\":1,\"RegionCategory\":\"计算机科学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"COMPUTER SCIENCE, INTERDISCIPLINARY APPLICATIONS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Computers in Industry","FirstCategoryId":"94","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0166361525001502","RegionNum":1,"RegionCategory":"计算机科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"COMPUTER SCIENCE, INTERDISCIPLINARY APPLICATIONS","Score":null,"Total":0}
引用次数: 0

摘要

基于层对层航天飞机的存储和检索系统(t-SBS/RSs)因其增强的灵活性、降低的成本和提高的航天飞机利用率而越来越受到业界的认可。然而,任务调度(TSc)和检索位置分配(LA)方案的有效性降低了检索效率,影响了机架的稳定性,从而增加了检索成本,危及系统的运行安全。此外,在检索过程中,总操作时间和机架稳定性之间存在潜在的冲突。因此,本研究提出了一种联合优化方法,用于t-SBS/RS中批量检索TSc和LA挑战,以适应相同货物类型的多个位置分布。该问题被建模为一个多目标优化问题,旨在最小化总操作时间,同时最大化机架稳定性。为了解决这一问题,提出了一种基于先验知识初始化策略的非支配排序遗传算法II (NSGA-II)。通过实际案例研究,建立了几个基准场景来评估所提出算法与其他五种算法的有效性,突出了NSGA-II的优越性。通过与经典调度策略的比较,验证了该方法的有效性。推导出的帕累托前沿验证了两个目标之间的内在冲突,表明权衡是必要的。最后,提供了管理见解,以突出这些发现对仓库管理人员的实际应用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Operation time and rack stability optimisation in tier-to-tier shuttle-based storage and retrieval systems with multiple retrieval locations
Tier-to-tier shuttle-based storage and retrieval systems (t-SBS/RSs) are increasingly recognised in the industry for their enhanced flexibility, reduced costs, and improved shuttle utilisation. However, the ineffectiveness of task scheduling (TSc) and retrieval location assignment (LA) schemes diminishes retrieval efficiency and compromises rack stability, thereby elevating retrieval costs and jeopardising system operational safety. Moreover, a potential conflict has been identified between total operation time and rack stability during retrieval operations. Consequently, this study proposes a joint optimisation approach for the batch retrieval TSc and LA challenges in t-SBS/RS, accommodating multiple location distributions for identical cargo types. This issue is modelled as a multi-objective optimisation problem aimed at minimising total operation time while maximising rack stability. To address this, a non-dominated sorting genetic algorithm II (NSGA-II) enhanced by a prior knowledge-based initialisation strategy was proposed. Employing a real case study, several benchmark scenarios were established to assess the effectiveness of the proposed algorithm against five other algorithms, highlighting the superiority of NSGA-II. Additionally, the effectiveness of this method is validated by comparison with classical scheduling policies. The derived Pareto fronts verify the inherent conflict between the two objectives, suggesting that a trade-off is necessary. Finally, managerial insights are offered to highlight the practical application of these findings for warehouse managers.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Computers in Industry
Computers in Industry 工程技术-计算机:跨学科应用
CiteScore
18.90
自引率
8.00%
发文量
152
审稿时长
22 days
期刊介绍: The objective of Computers in Industry is to present original, high-quality, application-oriented research papers that: • Illuminate emerging trends and possibilities in the utilization of Information and Communication Technology in industry; • Establish connections or integrations across various technology domains within the expansive realm of computer applications for industry; • Foster connections or integrations across diverse application areas of ICT in industry.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信