具有批量可用性和优先约束的双组件产品多准则调度。

IF 2.5 4区 计算机科学 Q2 COMPUTER SCIENCE, ARTIFICIAL INTELLIGENCE
PeerJ Computer Science Pub Date : 2025-08-19 eCollection Date: 2025-01-01 DOI:10.7717/peerj-cs.3093
Zhenxin Wen, Shuguang Li
{"title":"具有批量可用性和优先约束的双组件产品多准则调度。","authors":"Zhenxin Wen, Shuguang Li","doi":"10.7717/peerj-cs.3093","DOIUrl":null,"url":null,"abstract":"<p><p>This article studies the multicriteria problems of scheduling a set of n products on a fabrication facility, focusing on batch availability and precedence constraints. Each product is composed of two distinct subassemblies: a common subassembly, shared across all products, and a unique subassembly unique to each product. The common subassemblies are processed together in batches, with each batch requiring an initial setup, while unique subassemblies are handled individually. The availability of a common subassembly is contingent upon the completion of its entire batch (<i>i.e</i>., batch availability), whereas a unique subassembly becomes available immediately after its processing. The product completion time is determined by the availability of both subassemblies. Strict (weak) precedence means that if a product precedes another, then the latter can start only after the former is completed (the latter cannot start earlier than the former). We propose O(n<sup>4</sup>)-time algorithms to simultaneously optimize makespan and maximum cost, as well as to lexicographically optimize two maximum costs and makespan under strict or weak precedence constraints.</p>","PeriodicalId":54224,"journal":{"name":"PeerJ Computer Science","volume":"11 ","pages":"e3093"},"PeriodicalIF":2.5000,"publicationDate":"2025-08-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://www.ncbi.nlm.nih.gov/pmc/articles/PMC12453827/pdf/","citationCount":"0","resultStr":"{\"title\":\"Multicriteria scheduling of two-subassembly products with batch availability and precedence constraints.\",\"authors\":\"Zhenxin Wen, Shuguang Li\",\"doi\":\"10.7717/peerj-cs.3093\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p><p>This article studies the multicriteria problems of scheduling a set of n products on a fabrication facility, focusing on batch availability and precedence constraints. Each product is composed of two distinct subassemblies: a common subassembly, shared across all products, and a unique subassembly unique to each product. The common subassemblies are processed together in batches, with each batch requiring an initial setup, while unique subassemblies are handled individually. The availability of a common subassembly is contingent upon the completion of its entire batch (<i>i.e</i>., batch availability), whereas a unique subassembly becomes available immediately after its processing. The product completion time is determined by the availability of both subassemblies. Strict (weak) precedence means that if a product precedes another, then the latter can start only after the former is completed (the latter cannot start earlier than the former). We propose O(n<sup>4</sup>)-time algorithms to simultaneously optimize makespan and maximum cost, as well as to lexicographically optimize two maximum costs and makespan under strict or weak precedence constraints.</p>\",\"PeriodicalId\":54224,\"journal\":{\"name\":\"PeerJ Computer Science\",\"volume\":\"11 \",\"pages\":\"e3093\"},\"PeriodicalIF\":2.5000,\"publicationDate\":\"2025-08-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://www.ncbi.nlm.nih.gov/pmc/articles/PMC12453827/pdf/\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"PeerJ Computer Science\",\"FirstCategoryId\":\"94\",\"ListUrlMain\":\"https://doi.org/10.7717/peerj-cs.3093\",\"RegionNum\":4,\"RegionCategory\":\"计算机科学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"2025/1/1 0:00:00\",\"PubModel\":\"eCollection\",\"JCR\":\"Q2\",\"JCRName\":\"COMPUTER SCIENCE, ARTIFICIAL INTELLIGENCE\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"PeerJ Computer Science","FirstCategoryId":"94","ListUrlMain":"https://doi.org/10.7717/peerj-cs.3093","RegionNum":4,"RegionCategory":"计算机科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2025/1/1 0:00:00","PubModel":"eCollection","JCR":"Q2","JCRName":"COMPUTER SCIENCE, ARTIFICIAL INTELLIGENCE","Score":null,"Total":0}
引用次数: 0

摘要

本文研究了制造设备上n个产品的多准则调度问题,重点研究了批量可用性和优先约束。每个产品都由两个不同的子组件组成:一个公共的子组件,在所有产品中共享;一个唯一的子组件,对每个产品来说都是唯一的。共同的子组件被分批处理,每批需要初始设置,而独特的子组件被单独处理。通用子组件的可用性取决于其整个批的完成(即批可用性),而唯一子组件在处理后立即可用。产品完成时间由两个组件的可用性决定。严格(弱)优先意味着如果一个产品先于另一个产品,那么后者只能在前者完成后启动(后者不能比前者更早启动)。我们提出了O(n4)时间算法来同时优化makespan和最大成本,以及在严格或弱优先约束下按字典顺序优化两个最大成本和makespan。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Multicriteria scheduling of two-subassembly products with batch availability and precedence constraints.

This article studies the multicriteria problems of scheduling a set of n products on a fabrication facility, focusing on batch availability and precedence constraints. Each product is composed of two distinct subassemblies: a common subassembly, shared across all products, and a unique subassembly unique to each product. The common subassemblies are processed together in batches, with each batch requiring an initial setup, while unique subassemblies are handled individually. The availability of a common subassembly is contingent upon the completion of its entire batch (i.e., batch availability), whereas a unique subassembly becomes available immediately after its processing. The product completion time is determined by the availability of both subassemblies. Strict (weak) precedence means that if a product precedes another, then the latter can start only after the former is completed (the latter cannot start earlier than the former). We propose O(n4)-time algorithms to simultaneously optimize makespan and maximum cost, as well as to lexicographically optimize two maximum costs and makespan under strict or weak precedence constraints.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
PeerJ Computer Science
PeerJ Computer Science Computer Science-General Computer Science
CiteScore
6.10
自引率
5.30%
发文量
332
审稿时长
10 weeks
期刊介绍: PeerJ Computer Science is the new open access journal covering all subject areas in computer science, with the backing of a prestigious advisory board and more than 300 academic editors.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信