多任务劳动力约束的灵活作业车间调度问题:来自真实车间的应用程序

IF 14.2 1区 工程技术 Q1 ENGINEERING, INDUSTRIAL
Jiahang Li , Xinyu Li , Liang Gao , Cuiyu Wang , Haojie Chen
{"title":"多任务劳动力约束的灵活作业车间调度问题:来自真实车间的应用程序","authors":"Jiahang Li ,&nbsp;Xinyu Li ,&nbsp;Liang Gao ,&nbsp;Cuiyu Wang ,&nbsp;Haojie Chen","doi":"10.1016/j.jmsy.2025.09.004","DOIUrl":null,"url":null,"abstract":"<div><div>The flexible job shop scheduling problem with worker constraints plays a vital role in production scheduling because of workforce flexibility. Existing research assumes that single tasking workers can process one operation simultaneously. However, multitasking workers can be observed in a real-world enterprise, where they can handle multiple operations simultaneously. There is a lack of research on the effect of multitasking workers in flexible job shops. This paper investigates a flexible job-shop scheduling problem considering multitasking workers (FJSP-MW). First, a mixed-integer linear programming model with multitasking worker constraints is constructed to minimize total weighted tardiness (TWT). Second, an operation-sequence and resource-sequence (OSRS) encoding method is proposed to represent the solution space using the OS and RS vectors. Besides, a multitasking decoding method is introduced to decode the OS and RS vectors as a feasible schedule in the objective space. Third, a hybrid algorithm (IGA4MW) is proposed and consists of two aspects: (1) three modified genetic operators are designed for the OS and RS vectors to enhance the exploration ability, and (2) a resource-balanced local search method is presented to improve the exploitation ability. Finally, experiments are conducted on medium and large instances to demonstrate the effectiveness and efficiency of IGA4MW. The case study illustrates that the TWT and makespan of the obtained scheduling solution from IGA4MW are reduced by 15.43% and 41.16%, compared to the original scheduling solution. Furthermore, the performance gain of the resource-balanced local search method increases as the solution space is expanded.</div></div>","PeriodicalId":16227,"journal":{"name":"Journal of Manufacturing Systems","volume":"83 ","pages":"Pages 196-215"},"PeriodicalIF":14.2000,"publicationDate":"2025-09-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A multitasking workforce-constrained flexible job shop scheduling problem: An application from a real-world workshop\",\"authors\":\"Jiahang Li ,&nbsp;Xinyu Li ,&nbsp;Liang Gao ,&nbsp;Cuiyu Wang ,&nbsp;Haojie Chen\",\"doi\":\"10.1016/j.jmsy.2025.09.004\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><div>The flexible job shop scheduling problem with worker constraints plays a vital role in production scheduling because of workforce flexibility. Existing research assumes that single tasking workers can process one operation simultaneously. However, multitasking workers can be observed in a real-world enterprise, where they can handle multiple operations simultaneously. There is a lack of research on the effect of multitasking workers in flexible job shops. This paper investigates a flexible job-shop scheduling problem considering multitasking workers (FJSP-MW). First, a mixed-integer linear programming model with multitasking worker constraints is constructed to minimize total weighted tardiness (TWT). Second, an operation-sequence and resource-sequence (OSRS) encoding method is proposed to represent the solution space using the OS and RS vectors. Besides, a multitasking decoding method is introduced to decode the OS and RS vectors as a feasible schedule in the objective space. Third, a hybrid algorithm (IGA4MW) is proposed and consists of two aspects: (1) three modified genetic operators are designed for the OS and RS vectors to enhance the exploration ability, and (2) a resource-balanced local search method is presented to improve the exploitation ability. Finally, experiments are conducted on medium and large instances to demonstrate the effectiveness and efficiency of IGA4MW. The case study illustrates that the TWT and makespan of the obtained scheduling solution from IGA4MW are reduced by 15.43% and 41.16%, compared to the original scheduling solution. Furthermore, the performance gain of the resource-balanced local search method increases as the solution space is expanded.</div></div>\",\"PeriodicalId\":16227,\"journal\":{\"name\":\"Journal of Manufacturing Systems\",\"volume\":\"83 \",\"pages\":\"Pages 196-215\"},\"PeriodicalIF\":14.2000,\"publicationDate\":\"2025-09-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Manufacturing Systems\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S0278612525002304\",\"RegionNum\":1,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Manufacturing Systems","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0278612525002304","RegionNum":1,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

摘要

由于劳动力的灵活性,具有工人约束的柔性车间调度问题在生产调度中起着至关重要的作用。现有研究假设单任务工人可以同时处理一项操作。然而,在现实世界的企业中可以观察到多任务工作人员,他们可以同时处理多个操作。对于灵活工作制工厂中多任务工作的影响,目前还缺乏研究。研究了一个考虑多任务工人的柔性作业车间调度问题。首先,构造了具有多任务约束的混合整数线性规划模型,以最小化总加权延迟。其次,提出了一种操作序列和资源序列(OSRS)编码方法,利用操作序列和资源序列向量表示解空间。此外,提出了一种多任务解码方法,将OS和RS矢量作为目标空间的可行调度进行解码。第三,提出了一种混合算法(IGA4MW),该算法包括两个方面:(1)为OS和RS向量设计了三个改进的遗传算子,以增强其探测能力;(2)提出了一种资源平衡的局部搜索方法,以提高其探测能力。最后,在大中型实例上进行了实验,验证了IGA4MW的有效性和效率。实例研究表明,IGA4MW调度方案比原调度方案分别减少了15.43%和41.16%的行波距离和最大完工时间。此外,资源平衡局部搜索方法的性能增益随着解空间的扩大而增加。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A multitasking workforce-constrained flexible job shop scheduling problem: An application from a real-world workshop
The flexible job shop scheduling problem with worker constraints plays a vital role in production scheduling because of workforce flexibility. Existing research assumes that single tasking workers can process one operation simultaneously. However, multitasking workers can be observed in a real-world enterprise, where they can handle multiple operations simultaneously. There is a lack of research on the effect of multitasking workers in flexible job shops. This paper investigates a flexible job-shop scheduling problem considering multitasking workers (FJSP-MW). First, a mixed-integer linear programming model with multitasking worker constraints is constructed to minimize total weighted tardiness (TWT). Second, an operation-sequence and resource-sequence (OSRS) encoding method is proposed to represent the solution space using the OS and RS vectors. Besides, a multitasking decoding method is introduced to decode the OS and RS vectors as a feasible schedule in the objective space. Third, a hybrid algorithm (IGA4MW) is proposed and consists of two aspects: (1) three modified genetic operators are designed for the OS and RS vectors to enhance the exploration ability, and (2) a resource-balanced local search method is presented to improve the exploitation ability. Finally, experiments are conducted on medium and large instances to demonstrate the effectiveness and efficiency of IGA4MW. The case study illustrates that the TWT and makespan of the obtained scheduling solution from IGA4MW are reduced by 15.43% and 41.16%, compared to the original scheduling solution. Furthermore, the performance gain of the resource-balanced local search method increases as the solution space is expanded.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Manufacturing Systems
Journal of Manufacturing Systems 工程技术-工程:工业
CiteScore
23.30
自引率
13.20%
发文量
216
审稿时长
25 days
期刊介绍: The Journal of Manufacturing Systems is dedicated to showcasing cutting-edge fundamental and applied research in manufacturing at the systems level. Encompassing products, equipment, people, information, control, and support functions, manufacturing systems play a pivotal role in the economical and competitive development, production, delivery, and total lifecycle of products, meeting market and societal needs. With a commitment to publishing archival scholarly literature, the journal strives to advance the state of the art in manufacturing systems and foster innovation in crafting efficient, robust, and sustainable manufacturing systems. The focus extends from equipment-level considerations to the broader scope of the extended enterprise. The Journal welcomes research addressing challenges across various scales, including nano, micro, and macro-scale manufacturing, and spanning diverse sectors such as aerospace, automotive, energy, and medical device manufacturing.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信