基于上层结构的机器人装配线优化

IF 14.2 1区 工程技术 Q1 ENGINEERING, INDUSTRIAL
Gregor Wrobel , Kerem Doğan , Simon Hagemann , Joshua Nelles , Robert Scheffler
{"title":"基于上层结构的机器人装配线优化","authors":"Gregor Wrobel ,&nbsp;Kerem Doğan ,&nbsp;Simon Hagemann ,&nbsp;Joshua Nelles ,&nbsp;Robert Scheffler","doi":"10.1016/j.jmsy.2025.06.021","DOIUrl":null,"url":null,"abstract":"<div><div>Approaches to solve the assembly line balancing problem and its variations have been examined in research for several decades. Hybrid problems have replaced individual problems as the focus of consideration. Nevertheless, most of the theoretical models have not been applied in industry yet. This paper aims to close the research gap regarding the application of optimization strategies to production planning for fully automated robotic assembly lines. Therefore, we present a solution for solving a real-world hybrid problem that searches for the most cost-effective system. A balancing problem is solved for systems in which several robots can work together in parallel on fixtures or stationary joining units. The practical application includes the fact that the sequence of tasks is not given in a precedence graph, but instead, there is a sequence of processes that are implemented by several tasks. The planning of the task execution, optionally using different resources and in parallel, is part of the scheduling and equipment selection problem. We present a general domain model and a superstructure for robotic assembly lines and, based on this, an MILP formulation for the hybrid problem. Solutions for different cycle times were calculated for a real-world example and the results of this optimization are discussed and evaluated.</div></div>","PeriodicalId":16227,"journal":{"name":"Journal of Manufacturing Systems","volume":"82 ","pages":"Pages 786-808"},"PeriodicalIF":14.2000,"publicationDate":"2025-08-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Superstructure-based optimization of robotic assembly lines\",\"authors\":\"Gregor Wrobel ,&nbsp;Kerem Doğan ,&nbsp;Simon Hagemann ,&nbsp;Joshua Nelles ,&nbsp;Robert Scheffler\",\"doi\":\"10.1016/j.jmsy.2025.06.021\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><div>Approaches to solve the assembly line balancing problem and its variations have been examined in research for several decades. Hybrid problems have replaced individual problems as the focus of consideration. Nevertheless, most of the theoretical models have not been applied in industry yet. This paper aims to close the research gap regarding the application of optimization strategies to production planning for fully automated robotic assembly lines. Therefore, we present a solution for solving a real-world hybrid problem that searches for the most cost-effective system. A balancing problem is solved for systems in which several robots can work together in parallel on fixtures or stationary joining units. The practical application includes the fact that the sequence of tasks is not given in a precedence graph, but instead, there is a sequence of processes that are implemented by several tasks. The planning of the task execution, optionally using different resources and in parallel, is part of the scheduling and equipment selection problem. We present a general domain model and a superstructure for robotic assembly lines and, based on this, an MILP formulation for the hybrid problem. Solutions for different cycle times were calculated for a real-world example and the results of this optimization are discussed and evaluated.</div></div>\",\"PeriodicalId\":16227,\"journal\":{\"name\":\"Journal of Manufacturing Systems\",\"volume\":\"82 \",\"pages\":\"Pages 786-808\"},\"PeriodicalIF\":14.2000,\"publicationDate\":\"2025-08-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Manufacturing Systems\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S0278612525001724\",\"RegionNum\":1,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Manufacturing Systems","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0278612525001724","RegionNum":1,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

摘要

解决装配线平衡问题及其变化的方法已经研究了几十年。混合问题已经取代单个问题成为人们关注的焦点。然而,大多数理论模型尚未在工业中得到应用。本文旨在缩小优化策略在全自动化机器人装配线生产计划中的应用研究差距。因此,我们提出了一个解决现实世界中寻找最具成本效益系统的混合问题的解决方案。解决了多个机器人在固定装置或固定连接单元上并行工作的系统的平衡问题。实际应用包括这样一个事实,即任务序列不是在优先级图中给出的,而是由几个任务实现的过程序列。任务执行的规划,有选择地使用不同的资源和并行,是调度和设备选择问题的一部分。我们提出了机器人装配线的一般领域模型和上层结构,并在此基础上给出了混合问题的MILP公式。针对一个实际实例,计算了不同循环时间下的解,并对优化结果进行了讨论和评价。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Superstructure-based optimization of robotic assembly lines
Approaches to solve the assembly line balancing problem and its variations have been examined in research for several decades. Hybrid problems have replaced individual problems as the focus of consideration. Nevertheless, most of the theoretical models have not been applied in industry yet. This paper aims to close the research gap regarding the application of optimization strategies to production planning for fully automated robotic assembly lines. Therefore, we present a solution for solving a real-world hybrid problem that searches for the most cost-effective system. A balancing problem is solved for systems in which several robots can work together in parallel on fixtures or stationary joining units. The practical application includes the fact that the sequence of tasks is not given in a precedence graph, but instead, there is a sequence of processes that are implemented by several tasks. The planning of the task execution, optionally using different resources and in parallel, is part of the scheduling and equipment selection problem. We present a general domain model and a superstructure for robotic assembly lines and, based on this, an MILP formulation for the hybrid problem. Solutions for different cycle times were calculated for a real-world example and the results of this optimization are discussed and evaluated.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Manufacturing Systems
Journal of Manufacturing Systems 工程技术-工程:工业
CiteScore
23.30
自引率
13.20%
发文量
216
审稿时长
25 days
期刊介绍: The Journal of Manufacturing Systems is dedicated to showcasing cutting-edge fundamental and applied research in manufacturing at the systems level. Encompassing products, equipment, people, information, control, and support functions, manufacturing systems play a pivotal role in the economical and competitive development, production, delivery, and total lifecycle of products, meeting market and societal needs. With a commitment to publishing archival scholarly literature, the journal strives to advance the state of the art in manufacturing systems and foster innovation in crafting efficient, robust, and sustainable manufacturing systems. The focus extends from equipment-level considerations to the broader scope of the extended enterprise. The Journal welcomes research addressing challenges across various scales, including nano, micro, and macro-scale manufacturing, and spanning diverse sectors such as aerospace, automotive, energy, and medical device manufacturing.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信