基于经验的预算发布模型的项目监测和控制

IF 6 2区 管理学 Q1 OPERATIONS RESEARCH & MANAGEMENT SCIENCE
Jie Song, Jinbo Song, Tyson Browning, Mario Vanhoucke
{"title":"基于经验的预算发布模型的项目监测和控制","authors":"Jie Song, Jinbo Song, Tyson Browning, Mario Vanhoucke","doi":"10.1016/j.ejor.2025.06.007","DOIUrl":null,"url":null,"abstract":"Project monitoring and control (PMC) is a process of measuring a project’s progress and taking corrective action when necessary to ensure successful project completion. However, most existing models lack empirical validation of their assumptions and effectiveness, which limits their practical use. We fill in this gap by using empirical data from 97 real projects to calibrate activity-duration distributions and assess activity-duration dependencies, integrating these empirical foundations into an enhanced PMC model. We further improve the model by incorporating budget-release timing constraints and introducing two new policies for crashing and fast-tracking based on a project’s specific time and cost characteristics. Extensive computational experiments using empirical and artificial data evaluate the effectiveness of these policies. Because the budget-release policies and corrective action types depend on project characteristics such as activity-duration dependencies and topological network structure, key insights from this study can be usefully applied by project managers as heuristics even without a detailed model of their project.","PeriodicalId":55161,"journal":{"name":"European Journal of Operational Research","volume":"17 1","pages":""},"PeriodicalIF":6.0000,"publicationDate":"2025-06-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Project monitoring and control with an empirically grounded budget-release model\",\"authors\":\"Jie Song, Jinbo Song, Tyson Browning, Mario Vanhoucke\",\"doi\":\"10.1016/j.ejor.2025.06.007\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Project monitoring and control (PMC) is a process of measuring a project’s progress and taking corrective action when necessary to ensure successful project completion. However, most existing models lack empirical validation of their assumptions and effectiveness, which limits their practical use. We fill in this gap by using empirical data from 97 real projects to calibrate activity-duration distributions and assess activity-duration dependencies, integrating these empirical foundations into an enhanced PMC model. We further improve the model by incorporating budget-release timing constraints and introducing two new policies for crashing and fast-tracking based on a project’s specific time and cost characteristics. Extensive computational experiments using empirical and artificial data evaluate the effectiveness of these policies. Because the budget-release policies and corrective action types depend on project characteristics such as activity-duration dependencies and topological network structure, key insights from this study can be usefully applied by project managers as heuristics even without a detailed model of their project.\",\"PeriodicalId\":55161,\"journal\":{\"name\":\"European Journal of Operational Research\",\"volume\":\"17 1\",\"pages\":\"\"},\"PeriodicalIF\":6.0000,\"publicationDate\":\"2025-06-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"European Journal of Operational Research\",\"FirstCategoryId\":\"91\",\"ListUrlMain\":\"https://doi.org/10.1016/j.ejor.2025.06.007\",\"RegionNum\":2,\"RegionCategory\":\"管理学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"OPERATIONS RESEARCH & MANAGEMENT SCIENCE\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"European Journal of Operational Research","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.1016/j.ejor.2025.06.007","RegionNum":2,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"OPERATIONS RESEARCH & MANAGEMENT SCIENCE","Score":null,"Total":0}
引用次数: 0

摘要

项目监视和控制(PMC)是衡量项目进度并在必要时采取纠正措施以确保项目成功完成的过程。然而,大多数现有模型缺乏对其假设和有效性的实证验证,这限制了它们的实际应用。我们通过使用来自97个实际项目的经验数据来校准活动-持续时间分布并评估活动-持续时间依赖关系,将这些经验基础整合到增强的PMC模型中,从而填补了这一空白。根据项目具体的时间和成本特点,纳入预算发布时间约束条件,新增崩溃和快速跟踪两项政策,进一步完善了预算发布时间约束模式。广泛的计算实验使用经验和人工数据评估这些政策的有效性。由于预算发布政策和纠正措施类型取决于项目特征,例如活动持续时间依赖性和拓扑网络结构,因此即使没有项目的详细模型,项目经理也可以将本研究的关键见解作为启发式方法有效地应用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Project monitoring and control with an empirically grounded budget-release model
Project monitoring and control (PMC) is a process of measuring a project’s progress and taking corrective action when necessary to ensure successful project completion. However, most existing models lack empirical validation of their assumptions and effectiveness, which limits their practical use. We fill in this gap by using empirical data from 97 real projects to calibrate activity-duration distributions and assess activity-duration dependencies, integrating these empirical foundations into an enhanced PMC model. We further improve the model by incorporating budget-release timing constraints and introducing two new policies for crashing and fast-tracking based on a project’s specific time and cost characteristics. Extensive computational experiments using empirical and artificial data evaluate the effectiveness of these policies. Because the budget-release policies and corrective action types depend on project characteristics such as activity-duration dependencies and topological network structure, key insights from this study can be usefully applied by project managers as heuristics even without a detailed model of their project.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
European Journal of Operational Research
European Journal of Operational Research 管理科学-运筹学与管理科学
CiteScore
11.90
自引率
9.40%
发文量
786
审稿时长
8.2 months
期刊介绍: The European Journal of Operational Research (EJOR) publishes high quality, original papers that contribute to the methodology of operational research (OR) and to the practice of decision making.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信