{"title":"是什么扼杀了HS2?解释了英国高速铁路大型项目失去政治支持的原因","authors":"Dan Durrant","doi":"10.1093/cjres/rsaf005","DOIUrl":null,"url":null,"abstract":"Through the case of a hegemonic discourse formed around the UK’s cancelled mega-transport project High-Speed Two (HS2), this paper analyses the circumstances of its abandonment. The acquisition and loss of symbolic power are explained through different master and meta narratives. Mechanisms are identified through which HS2 became an ‘empty signifier’ temporarily filled with symbolic value, standing for different policy aspirations to rebalance the UK’s economy. Political speeches and the construction of narratives show how meta narratives around the project shifted and its symbolic value ebbed away to the point the project symbolised failure as opposed to ambition. Thus, when rising costs altered the ratio of costs to benefits, this narrative of failure was available to legitimate HS2’s cancellation.","PeriodicalId":47897,"journal":{"name":"Cambridge Journal of Regions Economy and Society","volume":"4 1","pages":""},"PeriodicalIF":5.6000,"publicationDate":"2025-05-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"What killed HS2? Explaining the loss of political support for the UK’s high-speed rail megaproject\",\"authors\":\"Dan Durrant\",\"doi\":\"10.1093/cjres/rsaf005\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Through the case of a hegemonic discourse formed around the UK’s cancelled mega-transport project High-Speed Two (HS2), this paper analyses the circumstances of its abandonment. The acquisition and loss of symbolic power are explained through different master and meta narratives. Mechanisms are identified through which HS2 became an ‘empty signifier’ temporarily filled with symbolic value, standing for different policy aspirations to rebalance the UK’s economy. Political speeches and the construction of narratives show how meta narratives around the project shifted and its symbolic value ebbed away to the point the project symbolised failure as opposed to ambition. Thus, when rising costs altered the ratio of costs to benefits, this narrative of failure was available to legitimate HS2’s cancellation.\",\"PeriodicalId\":47897,\"journal\":{\"name\":\"Cambridge Journal of Regions Economy and Society\",\"volume\":\"4 1\",\"pages\":\"\"},\"PeriodicalIF\":5.6000,\"publicationDate\":\"2025-05-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Cambridge Journal of Regions Economy and Society\",\"FirstCategoryId\":\"96\",\"ListUrlMain\":\"https://doi.org/10.1093/cjres/rsaf005\",\"RegionNum\":2,\"RegionCategory\":\"经济学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"DEVELOPMENT STUDIES\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Cambridge Journal of Regions Economy and Society","FirstCategoryId":"96","ListUrlMain":"https://doi.org/10.1093/cjres/rsaf005","RegionNum":2,"RegionCategory":"经济学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"DEVELOPMENT STUDIES","Score":null,"Total":0}
What killed HS2? Explaining the loss of political support for the UK’s high-speed rail megaproject
Through the case of a hegemonic discourse formed around the UK’s cancelled mega-transport project High-Speed Two (HS2), this paper analyses the circumstances of its abandonment. The acquisition and loss of symbolic power are explained through different master and meta narratives. Mechanisms are identified through which HS2 became an ‘empty signifier’ temporarily filled with symbolic value, standing for different policy aspirations to rebalance the UK’s economy. Political speeches and the construction of narratives show how meta narratives around the project shifted and its symbolic value ebbed away to the point the project symbolised failure as opposed to ambition. Thus, when rising costs altered the ratio of costs to benefits, this narrative of failure was available to legitimate HS2’s cancellation.