劳动力技能转换背景下的综合培训课程规划和分层多技能员工调度

IF 9.8 1区 工程技术 Q1 ENGINEERING, INDUSTRIAL
Guiping Su, Huiling Zhong, Jian Zhang
{"title":"劳动力技能转换背景下的综合培训课程规划和分层多技能员工调度","authors":"Guiping Su,&nbsp;Huiling Zhong,&nbsp;Jian Zhang","doi":"10.1016/j.ijpe.2025.109642","DOIUrl":null,"url":null,"abstract":"<div><div>The technological advances in many areas bring new skill requirements to the workforce, leading to a large number of workers facing the need of skill transformation and an increasing demand for workforce skill training. For many companies, to meet the complex and changing skill requirements of their tasks, their employees must be trained before being assigned to fulfill these tasks. As a result, when planning the training courses and scheduling the tasks of a company, a series of complex constraints related to the precedence of training and tasks, task-dependent skill requirements, course capacity, etc., should be taken into account, which poses a significant challenge for the management of the company. To solve this challenge, in this paper, we first formulate an integer programming model for the integrated training course and employee scheduling problem (ITCESP) to maximize the company’s total profits. Secondly, we develop a column-generation-based heuristic (CGBH) algorithm to obtain approximate solutions while achieving a high computational efficiency as well as a desirable solution accuracy. Thirdly, based on the context of home services, we simulate 18 sets of test instances and validate the advantages of the CGBH algorithm. Finally, through scenario comparisons and sensitivity analyses on key parameters, we provide practitioners with useful managerial insights.</div></div>","PeriodicalId":14287,"journal":{"name":"International Journal of Production Economics","volume":"286 ","pages":"Article 109642"},"PeriodicalIF":9.8000,"publicationDate":"2025-04-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Integrated training course planning and hierarchical multi-skilled employee scheduling in the workforce skill transformation context\",\"authors\":\"Guiping Su,&nbsp;Huiling Zhong,&nbsp;Jian Zhang\",\"doi\":\"10.1016/j.ijpe.2025.109642\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><div>The technological advances in many areas bring new skill requirements to the workforce, leading to a large number of workers facing the need of skill transformation and an increasing demand for workforce skill training. For many companies, to meet the complex and changing skill requirements of their tasks, their employees must be trained before being assigned to fulfill these tasks. As a result, when planning the training courses and scheduling the tasks of a company, a series of complex constraints related to the precedence of training and tasks, task-dependent skill requirements, course capacity, etc., should be taken into account, which poses a significant challenge for the management of the company. To solve this challenge, in this paper, we first formulate an integer programming model for the integrated training course and employee scheduling problem (ITCESP) to maximize the company’s total profits. Secondly, we develop a column-generation-based heuristic (CGBH) algorithm to obtain approximate solutions while achieving a high computational efficiency as well as a desirable solution accuracy. Thirdly, based on the context of home services, we simulate 18 sets of test instances and validate the advantages of the CGBH algorithm. Finally, through scenario comparisons and sensitivity analyses on key parameters, we provide practitioners with useful managerial insights.</div></div>\",\"PeriodicalId\":14287,\"journal\":{\"name\":\"International Journal of Production Economics\",\"volume\":\"286 \",\"pages\":\"Article 109642\"},\"PeriodicalIF\":9.8000,\"publicationDate\":\"2025-04-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Production Economics\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S0925527325001276\",\"RegionNum\":1,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Production Economics","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0925527325001276","RegionNum":1,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

摘要

许多领域的技术进步对劳动力提出了新的技能要求,导致大量工人面临技能转换的需要,对劳动力技能培训的需求日益增加。对于许多公司来说,为了满足复杂和不断变化的任务技能要求,他们的员工在被分配完成这些任务之前必须接受培训。因此,在规划培训课程和安排公司的任务时,需要考虑到培训和任务的优先级、任务相关技能要求、课程容量等一系列复杂的约束条件,这对公司的管理提出了重大挑战。为了解决这一挑战,本文首先为培训课程和员工调度问题(ITCESP)建立了一个整数规划模型,以实现公司总利润最大化。其次,我们开发了一种基于列生成的启发式算法(CGBH)来获得近似解,同时实现了较高的计算效率和理想的解精度。第三,基于家庭服务环境,模拟了18组测试实例,验证了CGBH算法的优势。最后,通过情景比较和关键参数的敏感性分析,我们为从业者提供了有用的管理见解。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Integrated training course planning and hierarchical multi-skilled employee scheduling in the workforce skill transformation context
The technological advances in many areas bring new skill requirements to the workforce, leading to a large number of workers facing the need of skill transformation and an increasing demand for workforce skill training. For many companies, to meet the complex and changing skill requirements of their tasks, their employees must be trained before being assigned to fulfill these tasks. As a result, when planning the training courses and scheduling the tasks of a company, a series of complex constraints related to the precedence of training and tasks, task-dependent skill requirements, course capacity, etc., should be taken into account, which poses a significant challenge for the management of the company. To solve this challenge, in this paper, we first formulate an integer programming model for the integrated training course and employee scheduling problem (ITCESP) to maximize the company’s total profits. Secondly, we develop a column-generation-based heuristic (CGBH) algorithm to obtain approximate solutions while achieving a high computational efficiency as well as a desirable solution accuracy. Thirdly, based on the context of home services, we simulate 18 sets of test instances and validate the advantages of the CGBH algorithm. Finally, through scenario comparisons and sensitivity analyses on key parameters, we provide practitioners with useful managerial insights.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
International Journal of Production Economics
International Journal of Production Economics 管理科学-工程:工业
CiteScore
21.40
自引率
7.50%
发文量
266
审稿时长
52 days
期刊介绍: The International Journal of Production Economics focuses on the interface between engineering and management. It covers all aspects of manufacturing and process industries, as well as production in general. The journal is interdisciplinary, considering activities throughout the product life cycle and material flow cycle. It aims to disseminate knowledge for improving industrial practice and strengthening the theoretical base for decision making. The journal serves as a forum for exchanging ideas and presenting new developments in theory and application, combining academic standards with practical value for industrial applications.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信