{"title":"在增材制造的双目标嵌套和调度模型中包含机械需求","authors":"Ibrahim Kucukkoc, Serena Finco, Mirco Peron, Gulsen Aydin Keskin","doi":"10.1016/j.ejor.2025.03.022","DOIUrl":null,"url":null,"abstract":"Following the increasing relevance of Additive Manufacturing (AM) as Manufacturing-as-a-service (Maas), the AM scheduling (and related nesting) problem has been increasingly investigated. Due to their business nature, Maas companies are interested in minimizing both the makespan and the total tardiness; however, most of the literature focuses only on one of them. This work fills this gap proposing a mixed-integer linear programming (MILP) model that minimizes both makespan and total tardiness. In doing so, for the first time in the literature, considerations on parts’ strength are included. During nesting procedures, indeed, parts can be oriented in different ways, with this choice affecting not only the total processing time (as considered by the literature) but also the strength achievable: if this is lower than what planned, parts might fail unexpectedly with detrimental consequences. Thus, this work ensures that parts are produced with the required strength. In doing so, we focus on a parallel unrelated AM batch scheduling problem for metallic parts.","PeriodicalId":55161,"journal":{"name":"European Journal of Operational Research","volume":"50 1","pages":""},"PeriodicalIF":6.0000,"publicationDate":"2025-03-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Including mechanical requirements in a bi-objective nesting and scheduling model for additive manufacturing\",\"authors\":\"Ibrahim Kucukkoc, Serena Finco, Mirco Peron, Gulsen Aydin Keskin\",\"doi\":\"10.1016/j.ejor.2025.03.022\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Following the increasing relevance of Additive Manufacturing (AM) as Manufacturing-as-a-service (Maas), the AM scheduling (and related nesting) problem has been increasingly investigated. Due to their business nature, Maas companies are interested in minimizing both the makespan and the total tardiness; however, most of the literature focuses only on one of them. This work fills this gap proposing a mixed-integer linear programming (MILP) model that minimizes both makespan and total tardiness. In doing so, for the first time in the literature, considerations on parts’ strength are included. During nesting procedures, indeed, parts can be oriented in different ways, with this choice affecting not only the total processing time (as considered by the literature) but also the strength achievable: if this is lower than what planned, parts might fail unexpectedly with detrimental consequences. Thus, this work ensures that parts are produced with the required strength. In doing so, we focus on a parallel unrelated AM batch scheduling problem for metallic parts.\",\"PeriodicalId\":55161,\"journal\":{\"name\":\"European Journal of Operational Research\",\"volume\":\"50 1\",\"pages\":\"\"},\"PeriodicalIF\":6.0000,\"publicationDate\":\"2025-03-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"European Journal of Operational Research\",\"FirstCategoryId\":\"91\",\"ListUrlMain\":\"https://doi.org/10.1016/j.ejor.2025.03.022\",\"RegionNum\":2,\"RegionCategory\":\"管理学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"OPERATIONS RESEARCH & MANAGEMENT SCIENCE\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"European Journal of Operational Research","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.1016/j.ejor.2025.03.022","RegionNum":2,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"OPERATIONS RESEARCH & MANAGEMENT SCIENCE","Score":null,"Total":0}
引用次数: 0

摘要

随着增材制造(AM)与制造即服务(Maas)的相关性越来越高,增材制造的调度(以及相关的嵌套)问题得到了越来越多的研究。由于其业务性质,Maas公司对最小化完工时间和总延迟时间都很感兴趣;然而,大多数文献只关注其中之一。这项工作填补了这一空白,提出了一个混合整数线性规划(MILP)模型,最小化完工时间和总延误。在这样做时,在文献中第一次考虑了零件的强度。事实上,在嵌套过程中,零件可以以不同的方式定向,这种选择不仅影响总加工时间(如文献所考虑的),还影响可实现的强度:如果这低于计划,零件可能会意外失败,并带来有害的后果。因此,这项工作确保了零件的生产具有所需的强度。在此过程中,我们将重点放在金属零件的并行无关AM批量调度问题上。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Including mechanical requirements in a bi-objective nesting and scheduling model for additive manufacturing
Following the increasing relevance of Additive Manufacturing (AM) as Manufacturing-as-a-service (Maas), the AM scheduling (and related nesting) problem has been increasingly investigated. Due to their business nature, Maas companies are interested in minimizing both the makespan and the total tardiness; however, most of the literature focuses only on one of them. This work fills this gap proposing a mixed-integer linear programming (MILP) model that minimizes both makespan and total tardiness. In doing so, for the first time in the literature, considerations on parts’ strength are included. During nesting procedures, indeed, parts can be oriented in different ways, with this choice affecting not only the total processing time (as considered by the literature) but also the strength achievable: if this is lower than what planned, parts might fail unexpectedly with detrimental consequences. Thus, this work ensures that parts are produced with the required strength. In doing so, we focus on a parallel unrelated AM batch scheduling problem for metallic parts.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
European Journal of Operational Research
European Journal of Operational Research 管理科学-运筹学与管理科学
CiteScore
11.90
自引率
9.40%
发文量
786
审稿时长
8.2 months
期刊介绍: The European Journal of Operational Research (EJOR) publishes high quality, original papers that contribute to the methodology of operational research (OR) and to the practice of decision making.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信