Juan Antonio Ocampo-Wilches;Jean Mahseredjian;Keijo Jacobs;Ahda G. Pavani;Haoyan Xue
{"title":"综合全尺寸变流器风电场初始化电磁瞬变研究","authors":"Juan Antonio Ocampo-Wilches;Jean Mahseredjian;Keijo Jacobs;Ahda G. Pavani;Haoyan Xue","doi":"10.1109/TPWRD.2025.3551546","DOIUrl":null,"url":null,"abstract":"This paper proposes a comprehensive method for initializing the electromagnetic transient models of full-scale converter wind parks. The method uses the ac load-flow solution to initialize the mechanical model, the electrical components, the machine, the converter and the control systems. The effectiveness of the method is demonstrated through EMT simulations of three different power system benchmarks: an aggregated WP connected to a small transmission grid, a detailed WP model with wind turbines connected to a small transmission grid, and a large-scale transmission grid with ten different aggregated WPs. The results show that the proposed method reduces computing times required to reach steady-state and consequently accelerates overall simulations.","PeriodicalId":13498,"journal":{"name":"IEEE Transactions on Power Delivery","volume":"40 3","pages":"1459-1468"},"PeriodicalIF":3.8000,"publicationDate":"2025-04-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Comprehensive Full-Scale Converter Wind Park Initialization for Electromagnetic Transient Studies\",\"authors\":\"Juan Antonio Ocampo-Wilches;Jean Mahseredjian;Keijo Jacobs;Ahda G. Pavani;Haoyan Xue\",\"doi\":\"10.1109/TPWRD.2025.3551546\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper proposes a comprehensive method for initializing the electromagnetic transient models of full-scale converter wind parks. The method uses the ac load-flow solution to initialize the mechanical model, the electrical components, the machine, the converter and the control systems. The effectiveness of the method is demonstrated through EMT simulations of three different power system benchmarks: an aggregated WP connected to a small transmission grid, a detailed WP model with wind turbines connected to a small transmission grid, and a large-scale transmission grid with ten different aggregated WPs. The results show that the proposed method reduces computing times required to reach steady-state and consequently accelerates overall simulations.\",\"PeriodicalId\":13498,\"journal\":{\"name\":\"IEEE Transactions on Power Delivery\",\"volume\":\"40 3\",\"pages\":\"1459-1468\"},\"PeriodicalIF\":3.8000,\"publicationDate\":\"2025-04-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE Transactions on Power Delivery\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://ieeexplore.ieee.org/document/10948380/\",\"RegionNum\":2,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENGINEERING, ELECTRICAL & ELECTRONIC\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Transactions on Power Delivery","FirstCategoryId":"5","ListUrlMain":"https://ieeexplore.ieee.org/document/10948380/","RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
Comprehensive Full-Scale Converter Wind Park Initialization for Electromagnetic Transient Studies
This paper proposes a comprehensive method for initializing the electromagnetic transient models of full-scale converter wind parks. The method uses the ac load-flow solution to initialize the mechanical model, the electrical components, the machine, the converter and the control systems. The effectiveness of the method is demonstrated through EMT simulations of three different power system benchmarks: an aggregated WP connected to a small transmission grid, a detailed WP model with wind turbines connected to a small transmission grid, and a large-scale transmission grid with ten different aggregated WPs. The results show that the proposed method reduces computing times required to reach steady-state and consequently accelerates overall simulations.
期刊介绍:
The scope of the Society embraces planning, research, development, design, application, construction, installation and operation of apparatus, equipment, structures, materials and systems for the safe, reliable and economic generation, transmission, distribution, conversion, measurement and control of electric energy. It includes the developing of engineering standards, the providing of information and instruction to the public and to legislators, as well as technical scientific, literary, educational and other activities that contribute to the electric power discipline or utilize the techniques or products within this discipline.