{"title":"封面图片:地质力学与隧道1/2025","authors":"","doi":"10.1002/geot.202580101","DOIUrl":null,"url":null,"abstract":"<p>In the Seelenwald section of the Black Forest Railway, located between Triberg and St. Georgen persistent deformations in the track area and the slope below the railway line were observed for several years. Following extensive planning, the comprehensive structural stabilization of the moving slope using grouted strand anchors began in June 2023. One year later the project was completed, and the track became fully operational again in July 2024. For the full story turn to page 88 (Photo: DSI Underground)</p>","PeriodicalId":39412,"journal":{"name":"Geomechanik und Tunnelbau","volume":"18 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2025-02-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1002/geot.202580101","citationCount":"0","resultStr":"{\"title\":\"Cover Picture: Geomechanics and Tunnelling 1/2025\",\"authors\":\"\",\"doi\":\"10.1002/geot.202580101\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p>In the Seelenwald section of the Black Forest Railway, located between Triberg and St. Georgen persistent deformations in the track area and the slope below the railway line were observed for several years. Following extensive planning, the comprehensive structural stabilization of the moving slope using grouted strand anchors began in June 2023. One year later the project was completed, and the track became fully operational again in July 2024. For the full story turn to page 88 (Photo: DSI Underground)</p>\",\"PeriodicalId\":39412,\"journal\":{\"name\":\"Geomechanik und Tunnelbau\",\"volume\":\"18 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2025-02-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://onlinelibrary.wiley.com/doi/epdf/10.1002/geot.202580101\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Geomechanik und Tunnelbau\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://onlinelibrary.wiley.com/doi/10.1002/geot.202580101\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Earth and Planetary Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Geomechanik und Tunnelbau","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/geot.202580101","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
In the Seelenwald section of the Black Forest Railway, located between Triberg and St. Georgen persistent deformations in the track area and the slope below the railway line were observed for several years. Following extensive planning, the comprehensive structural stabilization of the moving slope using grouted strand anchors began in June 2023. One year later the project was completed, and the track became fully operational again in July 2024. For the full story turn to page 88 (Photo: DSI Underground)
Geomechanik und TunnelbauEarth and Planetary Sciences-Geotechnical Engineering and Engineering Geology
CiteScore
1.20
自引率
0.00%
发文量
111
期刊介绍:
The contributions published in Geomechanics and Tunnelling deal with practical aspects of applied engineering geology, rock mechanics and rock engineering, soil mechanics and foundation engineering, and primarily tunnelling. Each issue focuses on a current topic or specific project. Brief news, reports from construction sites and news on conferences round off the content. From the start of 2009 Geomechanics and Tunnelling has been published as a bilingual English/German journal.