封面图片:地质力学与隧道1/2025

Q4 Earth and Planetary Sciences
{"title":"封面图片:地质力学与隧道1/2025","authors":"","doi":"10.1002/geot.202580101","DOIUrl":null,"url":null,"abstract":"<p>In the Seelenwald section of the Black Forest Railway, located between Triberg and St. Georgen persistent deformations in the track area and the slope below the railway line were observed for several years. Following extensive planning, the comprehensive structural stabilization of the moving slope using grouted strand anchors began in June 2023. One year later the project was completed, and the track became fully operational again in July 2024. For the full story turn to page 88 (Photo: DSI Underground)</p>","PeriodicalId":39412,"journal":{"name":"Geomechanik und Tunnelbau","volume":"18 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2025-02-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1002/geot.202580101","citationCount":"0","resultStr":"{\"title\":\"Cover Picture: Geomechanics and Tunnelling 1/2025\",\"authors\":\"\",\"doi\":\"10.1002/geot.202580101\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p>In the Seelenwald section of the Black Forest Railway, located between Triberg and St. Georgen persistent deformations in the track area and the slope below the railway line were observed for several years. Following extensive planning, the comprehensive structural stabilization of the moving slope using grouted strand anchors began in June 2023. One year later the project was completed, and the track became fully operational again in July 2024. For the full story turn to page 88 (Photo: DSI Underground)</p>\",\"PeriodicalId\":39412,\"journal\":{\"name\":\"Geomechanik und Tunnelbau\",\"volume\":\"18 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2025-02-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://onlinelibrary.wiley.com/doi/epdf/10.1002/geot.202580101\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Geomechanik und Tunnelbau\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://onlinelibrary.wiley.com/doi/10.1002/geot.202580101\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Earth and Planetary Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Geomechanik und Tunnelbau","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/geot.202580101","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 0

摘要

在位于Triberg和St. Georgen之间的黑森林铁路的Seelenwald段,观察到轨道区域和铁路线下方的斜坡持续变形已有数年之久。经过广泛的规划,2023年6月开始使用灌浆链锚对移动边坡进行全面结构稳定。一年后,该项目完成,并于2024年7月再次全面投入使用。要了解完整的故事,请参阅第88页(图片来源:DSI Underground)
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Cover Picture: Geomechanics and Tunnelling 1/2025

In the Seelenwald section of the Black Forest Railway, located between Triberg and St. Georgen persistent deformations in the track area and the slope below the railway line were observed for several years. Following extensive planning, the comprehensive structural stabilization of the moving slope using grouted strand anchors began in June 2023. One year later the project was completed, and the track became fully operational again in July 2024. For the full story turn to page 88 (Photo: DSI Underground)

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Geomechanik und Tunnelbau
Geomechanik und Tunnelbau Earth and Planetary Sciences-Geotechnical Engineering and Engineering Geology
CiteScore
1.20
自引率
0.00%
发文量
111
期刊介绍: The contributions published in Geomechanics and Tunnelling deal with practical aspects of applied engineering geology, rock mechanics and rock engineering, soil mechanics and foundation engineering, and primarily tunnelling. Each issue focuses on a current topic or specific project. Brief news, reports from construction sites and news on conferences round off the content. From the start of 2009 Geomechanics and Tunnelling has been published as a bilingual English/German journal.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信