通过前后保修和预防性维护建立随机更换策略模型

IF 6.7 1区 工程技术 Q1 COMPUTER SCIENCE, INTERDISCIPLINARY APPLICATIONS
Lijun Shang , Yongzheng Tian , Yongjun Du , Jiangbin Zhao , Zhiqiang Cai
{"title":"通过前后保修和预防性维护建立随机更换策略模型","authors":"Lijun Shang ,&nbsp;Yongzheng Tian ,&nbsp;Yongjun Du ,&nbsp;Jiangbin Zhao ,&nbsp;Zhiqiang Cai","doi":"10.1016/j.cie.2024.110819","DOIUrl":null,"url":null,"abstract":"<div><div>In the context of advanced digital technology enabling real-time monitoring of data elements throughout the product lifecycle, numerous researchers have proposed multi-dimensional random warranties integrating monitored missions. However, some key aspects have been commonly overlooked. For example, when the principle of ’whichever occurs first’ or ’whichever occurs last’ is adopted to handle warranty-expiry limits, the heterogeneous durations of warranty time will either reduce the warranty time for the consumers or increase the warranty cost for the manufacturers. To address these issues, this paper proposes two random warranties, each of which is combined with mission elements. The proposed warranties include a random renewable repair back warranty and a random renewable repair front warranty with preventive maintenance (PM) designed to control warranty time and cost by dynamic means. Additionally, extending the design concepts derived from these warranties to the post-warranty scopes, this paper defines and models a random renewable-periodic back replacement strategy and a random renewable-periodic front replacement strategy with PM, which can flexibly sustain post-warranty reliabilities. Finally, a numerical analysis is carried out to explore the insights and effectiveness of the proposed method, demonstrating that the proposed warranties are superior and the proposed replacement strategies are effective.</div></div>","PeriodicalId":55220,"journal":{"name":"Computers & Industrial Engineering","volume":"200 ","pages":"Article 110819"},"PeriodicalIF":6.7000,"publicationDate":"2025-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Random replacement strategies modeling through back and front warranties with preventive maintenance\",\"authors\":\"Lijun Shang ,&nbsp;Yongzheng Tian ,&nbsp;Yongjun Du ,&nbsp;Jiangbin Zhao ,&nbsp;Zhiqiang Cai\",\"doi\":\"10.1016/j.cie.2024.110819\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><div>In the context of advanced digital technology enabling real-time monitoring of data elements throughout the product lifecycle, numerous researchers have proposed multi-dimensional random warranties integrating monitored missions. However, some key aspects have been commonly overlooked. For example, when the principle of ’whichever occurs first’ or ’whichever occurs last’ is adopted to handle warranty-expiry limits, the heterogeneous durations of warranty time will either reduce the warranty time for the consumers or increase the warranty cost for the manufacturers. To address these issues, this paper proposes two random warranties, each of which is combined with mission elements. The proposed warranties include a random renewable repair back warranty and a random renewable repair front warranty with preventive maintenance (PM) designed to control warranty time and cost by dynamic means. Additionally, extending the design concepts derived from these warranties to the post-warranty scopes, this paper defines and models a random renewable-periodic back replacement strategy and a random renewable-periodic front replacement strategy with PM, which can flexibly sustain post-warranty reliabilities. Finally, a numerical analysis is carried out to explore the insights and effectiveness of the proposed method, demonstrating that the proposed warranties are superior and the proposed replacement strategies are effective.</div></div>\",\"PeriodicalId\":55220,\"journal\":{\"name\":\"Computers & Industrial Engineering\",\"volume\":\"200 \",\"pages\":\"Article 110819\"},\"PeriodicalIF\":6.7000,\"publicationDate\":\"2025-02-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Computers & Industrial Engineering\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S0360835224009410\",\"RegionNum\":1,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"COMPUTER SCIENCE, INTERDISCIPLINARY APPLICATIONS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Computers & Industrial Engineering","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0360835224009410","RegionNum":1,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"COMPUTER SCIENCE, INTERDISCIPLINARY APPLICATIONS","Score":null,"Total":0}
引用次数: 0

摘要

本文章由计算机程序翻译,如有差异,请以英文原文为准。
Random replacement strategies modeling through back and front warranties with preventive maintenance
In the context of advanced digital technology enabling real-time monitoring of data elements throughout the product lifecycle, numerous researchers have proposed multi-dimensional random warranties integrating monitored missions. However, some key aspects have been commonly overlooked. For example, when the principle of ’whichever occurs first’ or ’whichever occurs last’ is adopted to handle warranty-expiry limits, the heterogeneous durations of warranty time will either reduce the warranty time for the consumers or increase the warranty cost for the manufacturers. To address these issues, this paper proposes two random warranties, each of which is combined with mission elements. The proposed warranties include a random renewable repair back warranty and a random renewable repair front warranty with preventive maintenance (PM) designed to control warranty time and cost by dynamic means. Additionally, extending the design concepts derived from these warranties to the post-warranty scopes, this paper defines and models a random renewable-periodic back replacement strategy and a random renewable-periodic front replacement strategy with PM, which can flexibly sustain post-warranty reliabilities. Finally, a numerical analysis is carried out to explore the insights and effectiveness of the proposed method, demonstrating that the proposed warranties are superior and the proposed replacement strategies are effective.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Computers & Industrial Engineering
Computers & Industrial Engineering 工程技术-工程:工业
CiteScore
12.70
自引率
12.70%
发文量
794
审稿时长
10.6 months
期刊介绍: Computers & Industrial Engineering (CAIE) is dedicated to researchers, educators, and practitioners in industrial engineering and related fields. Pioneering the integration of computers in research, education, and practice, industrial engineering has evolved to make computers and electronic communication integral to its domain. CAIE publishes original contributions focusing on the development of novel computerized methodologies to address industrial engineering problems. It also highlights the applications of these methodologies to issues within the broader industrial engineering and associated communities. The journal actively encourages submissions that push the boundaries of fundamental theories and concepts in industrial engineering techniques.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信