{"title":"考虑不确定设备偶然性的园区级综合能源系统两阶段鲁棒规划","authors":"Zuxun Xiong;Xinwei Shen;Hongbin Sun","doi":"10.1109/TSG.2024.3524879","DOIUrl":null,"url":null,"abstract":"To enhance the reliability of Integrated Energy Systems (IESs) and address the research gap in reliability-based planning methods, this paper proposes a two-stage robust planning model specifically for park-level IESs. The proposed planning model considers uncertainties like load demand fluctuations and equipment contingencies, and provides a reliable scheme of equipment selection and sizing for IES investors. Inspired by the unit commitment problem, we formulate an equipment contingency uncertainty set to accurately describe the potential equipment contingencies which happen and can be repaired within a day. Then, a modified nested column-and-constraint generation algorithm is applied to solve this two-stage robust planning model with integer recourse efficiently. In the case study, the role of energy storage system for IES reliability enhancement is analyzed in detail. Computational results demonstrate the advantage of the proposed model over other planning models in terms of improving reliability.","PeriodicalId":13331,"journal":{"name":"IEEE Transactions on Smart Grid","volume":"16 2","pages":"1112-1126"},"PeriodicalIF":8.6000,"publicationDate":"2025-01-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Two-Stage Robust Planning for Park-Level Integrated Energy System Considering Uncertain Equipment Contingency\",\"authors\":\"Zuxun Xiong;Xinwei Shen;Hongbin Sun\",\"doi\":\"10.1109/TSG.2024.3524879\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"To enhance the reliability of Integrated Energy Systems (IESs) and address the research gap in reliability-based planning methods, this paper proposes a two-stage robust planning model specifically for park-level IESs. The proposed planning model considers uncertainties like load demand fluctuations and equipment contingencies, and provides a reliable scheme of equipment selection and sizing for IES investors. Inspired by the unit commitment problem, we formulate an equipment contingency uncertainty set to accurately describe the potential equipment contingencies which happen and can be repaired within a day. Then, a modified nested column-and-constraint generation algorithm is applied to solve this two-stage robust planning model with integer recourse efficiently. In the case study, the role of energy storage system for IES reliability enhancement is analyzed in detail. Computational results demonstrate the advantage of the proposed model over other planning models in terms of improving reliability.\",\"PeriodicalId\":13331,\"journal\":{\"name\":\"IEEE Transactions on Smart Grid\",\"volume\":\"16 2\",\"pages\":\"1112-1126\"},\"PeriodicalIF\":8.6000,\"publicationDate\":\"2025-01-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE Transactions on Smart Grid\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://ieeexplore.ieee.org/document/10834468/\",\"RegionNum\":1,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"ENGINEERING, ELECTRICAL & ELECTRONIC\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Transactions on Smart Grid","FirstCategoryId":"5","ListUrlMain":"https://ieeexplore.ieee.org/document/10834468/","RegionNum":1,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
Two-Stage Robust Planning for Park-Level Integrated Energy System Considering Uncertain Equipment Contingency
To enhance the reliability of Integrated Energy Systems (IESs) and address the research gap in reliability-based planning methods, this paper proposes a two-stage robust planning model specifically for park-level IESs. The proposed planning model considers uncertainties like load demand fluctuations and equipment contingencies, and provides a reliable scheme of equipment selection and sizing for IES investors. Inspired by the unit commitment problem, we formulate an equipment contingency uncertainty set to accurately describe the potential equipment contingencies which happen and can be repaired within a day. Then, a modified nested column-and-constraint generation algorithm is applied to solve this two-stage robust planning model with integer recourse efficiently. In the case study, the role of energy storage system for IES reliability enhancement is analyzed in detail. Computational results demonstrate the advantage of the proposed model over other planning models in terms of improving reliability.
期刊介绍:
The IEEE Transactions on Smart Grid is a multidisciplinary journal that focuses on research and development in the field of smart grid technology. It covers various aspects of the smart grid, including energy networks, prosumers (consumers who also produce energy), electric transportation, distributed energy resources, and communications. The journal also addresses the integration of microgrids and active distribution networks with transmission systems. It publishes original research on smart grid theories and principles, including technologies and systems for demand response, Advance Metering Infrastructure, cyber-physical systems, multi-energy systems, transactive energy, data analytics, and electric vehicle integration. Additionally, the journal considers surveys of existing work on the smart grid that propose new perspectives on the history and future of intelligent and active grids.