{"title":"粒度分布对脱水回路设计的影响;案例研究:Gol-E-Gohar 采矿和工业公司的铁矿石尾矿","authors":"Zare Saeid, Parsapour Gholamabbas, Ghorbannejad Mojtaba, Hasankhoei Alireza","doi":"10.1080/00084433.2024.2395635","DOIUrl":null,"url":null,"abstract":"Iron ore processing plants of the Gol-E-Gohar mining and industrial company have three thickeners. The thickeners’ underflow's is pumped to a tailings dam, with the solid content of about 50%. To i...","PeriodicalId":9452,"journal":{"name":"Canadian Metallurgical Quarterly","volume":"3 1","pages":""},"PeriodicalIF":1.3000,"publicationDate":"2024-08-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Effect of particle size distribution on the dewatering circuit design; case study: iron ore tailing of the Gol-E-Gohar mining and industrial company\",\"authors\":\"Zare Saeid, Parsapour Gholamabbas, Ghorbannejad Mojtaba, Hasankhoei Alireza\",\"doi\":\"10.1080/00084433.2024.2395635\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Iron ore processing plants of the Gol-E-Gohar mining and industrial company have three thickeners. The thickeners’ underflow's is pumped to a tailings dam, with the solid content of about 50%. To i...\",\"PeriodicalId\":9452,\"journal\":{\"name\":\"Canadian Metallurgical Quarterly\",\"volume\":\"3 1\",\"pages\":\"\"},\"PeriodicalIF\":1.3000,\"publicationDate\":\"2024-08-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Canadian Metallurgical Quarterly\",\"FirstCategoryId\":\"88\",\"ListUrlMain\":\"https://doi.org/10.1080/00084433.2024.2395635\",\"RegionNum\":4,\"RegionCategory\":\"材料科学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"METALLURGY & METALLURGICAL ENGINEERING\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Canadian Metallurgical Quarterly","FirstCategoryId":"88","ListUrlMain":"https://doi.org/10.1080/00084433.2024.2395635","RegionNum":4,"RegionCategory":"材料科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"METALLURGY & METALLURGICAL ENGINEERING","Score":null,"Total":0}
Effect of particle size distribution on the dewatering circuit design; case study: iron ore tailing of the Gol-E-Gohar mining and industrial company
Iron ore processing plants of the Gol-E-Gohar mining and industrial company have three thickeners. The thickeners’ underflow's is pumped to a tailings dam, with the solid content of about 50%. To i...
期刊介绍:
Canadian Metallurgical Quarterly publishes original contributions on all aspects of metallurgy and materials science, including mineral processing, hydrometallurgy, pyrometallurgy, materials processing, physical metallurgy and the service behaviour of materials. An invaluable resource for international researchers and professionals engaged in interdisciplinary research in metallurgy and materials science.