粒度分布对脱水回路设计的影响;案例研究:Gol-E-Gohar 采矿和工业公司的铁矿石尾矿

IF 1.3 4区 材料科学 Q3 METALLURGY & METALLURGICAL ENGINEERING
Zare Saeid, Parsapour Gholamabbas, Ghorbannejad Mojtaba, Hasankhoei Alireza
{"title":"粒度分布对脱水回路设计的影响;案例研究:Gol-E-Gohar 采矿和工业公司的铁矿石尾矿","authors":"Zare Saeid, Parsapour Gholamabbas, Ghorbannejad Mojtaba, Hasankhoei Alireza","doi":"10.1080/00084433.2024.2395635","DOIUrl":null,"url":null,"abstract":"Iron ore processing plants of the Gol-E-Gohar mining and industrial company have three thickeners. The thickeners’ underflow's is pumped to a tailings dam, with the solid content of about 50%. To i...","PeriodicalId":9452,"journal":{"name":"Canadian Metallurgical Quarterly","volume":null,"pages":null},"PeriodicalIF":1.3000,"publicationDate":"2024-08-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Effect of particle size distribution on the dewatering circuit design; case study: iron ore tailing of the Gol-E-Gohar mining and industrial company\",\"authors\":\"Zare Saeid, Parsapour Gholamabbas, Ghorbannejad Mojtaba, Hasankhoei Alireza\",\"doi\":\"10.1080/00084433.2024.2395635\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Iron ore processing plants of the Gol-E-Gohar mining and industrial company have three thickeners. The thickeners’ underflow's is pumped to a tailings dam, with the solid content of about 50%. To i...\",\"PeriodicalId\":9452,\"journal\":{\"name\":\"Canadian Metallurgical Quarterly\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.3000,\"publicationDate\":\"2024-08-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Canadian Metallurgical Quarterly\",\"FirstCategoryId\":\"88\",\"ListUrlMain\":\"https://doi.org/10.1080/00084433.2024.2395635\",\"RegionNum\":4,\"RegionCategory\":\"材料科学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"METALLURGY & METALLURGICAL ENGINEERING\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Canadian Metallurgical Quarterly","FirstCategoryId":"88","ListUrlMain":"https://doi.org/10.1080/00084433.2024.2395635","RegionNum":4,"RegionCategory":"材料科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"METALLURGY & METALLURGICAL ENGINEERING","Score":null,"Total":0}
引用次数: 0

摘要

Gol-E-Gohar 采矿和工业公司的铁矿石加工厂有三台浓缩机。浓缩机的底流被泵送到尾矿坝,固体含量约为 50%。为了防止尾矿...
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Effect of particle size distribution on the dewatering circuit design; case study: iron ore tailing of the Gol-E-Gohar mining and industrial company
Iron ore processing plants of the Gol-E-Gohar mining and industrial company have three thickeners. The thickeners’ underflow's is pumped to a tailings dam, with the solid content of about 50%. To i...
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Canadian Metallurgical Quarterly
Canadian Metallurgical Quarterly 工程技术-冶金工程
CiteScore
1.90
自引率
11.10%
发文量
97
审稿时长
6 months
期刊介绍: Canadian Metallurgical Quarterly publishes original contributions on all aspects of metallurgy and materials science, including mineral processing, hydrometallurgy, pyrometallurgy, materials processing, physical metallurgy and the service behaviour of materials. An invaluable resource for international researchers and professionals engaged in interdisciplinary research in metallurgy and materials science.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信