评价乏核燃料后处理投资的有效性

IF 0.4 4区 工程技术 Q4 NUCLEAR SCIENCE & TECHNOLOGY
I. A. Kozhokar, V. V. Kharitonov
{"title":"评价乏核燃料后处理投资的有效性","authors":"I. A. Kozhokar,&nbsp;V. V. Kharitonov","doi":"10.1007/s10512-024-01111-w","DOIUrl":null,"url":null,"abstract":"<div><p>The article presents an economic and analytical model that evaluates various criteria for the effectiveness of investments in spent nuclear fuel reprocessing plants at given capital, operating, and decommissioning costs, as well as expected project implementation deadlines. The model also solves the inverse problem of determining the requirements for plant parameters based on the criteria of investment effectiveness. The results of the calculation of the most important of these parameters, including the internal rate of return, the discounted payback period, and the levelized cost of reprocessing spent nuclear fuel, are presented. The mathematical definition of the net present value, representing the main criterion, depends on the plant capacity, which varies from 200 to 3000 t of fuel per year. The estimated conditions under which the net present value of reprocessing spent nuclear fuel does not exceed $1000/kg are presented.</p></div>","PeriodicalId":480,"journal":{"name":"Atomic Energy","volume":"135 5-6","pages":"264 - 274"},"PeriodicalIF":0.4000,"publicationDate":"2024-08-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Evaluation of the effectiveness of investments in spent nuclear fuel reprocessing\",\"authors\":\"I. A. Kozhokar,&nbsp;V. V. Kharitonov\",\"doi\":\"10.1007/s10512-024-01111-w\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>The article presents an economic and analytical model that evaluates various criteria for the effectiveness of investments in spent nuclear fuel reprocessing plants at given capital, operating, and decommissioning costs, as well as expected project implementation deadlines. The model also solves the inverse problem of determining the requirements for plant parameters based on the criteria of investment effectiveness. The results of the calculation of the most important of these parameters, including the internal rate of return, the discounted payback period, and the levelized cost of reprocessing spent nuclear fuel, are presented. The mathematical definition of the net present value, representing the main criterion, depends on the plant capacity, which varies from 200 to 3000 t of fuel per year. The estimated conditions under which the net present value of reprocessing spent nuclear fuel does not exceed $1000/kg are presented.</p></div>\",\"PeriodicalId\":480,\"journal\":{\"name\":\"Atomic Energy\",\"volume\":\"135 5-6\",\"pages\":\"264 - 274\"},\"PeriodicalIF\":0.4000,\"publicationDate\":\"2024-08-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Atomic Energy\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://link.springer.com/article/10.1007/s10512-024-01111-w\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"NUCLEAR SCIENCE & TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Atomic Energy","FirstCategoryId":"5","ListUrlMain":"https://link.springer.com/article/10.1007/s10512-024-01111-w","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"NUCLEAR SCIENCE & TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

摘要

文章介绍了一个经济分析模型,该模型评估了在给定资本、运营和退役成本以及预期项目实施期限的情况下,乏核燃料后处理厂投资有效性的各种标准。该模型还解决了根据投资效益标准确定工厂参数要求的逆问题。其中最重要参数的计算结果,包括内部收益率、贴现投资回收期和核乏燃料后处理的平准化成本。代表主要标准的净现值的数学定义取决于核电厂的年处理能力,从每年 200 吨到 3000 吨不等。介绍了后处理乏核燃料的净现值不超过 1000 美元/千克的估计条件。
本文章由计算机程序翻译,如有差异,请以英文原文为准。

Evaluation of the effectiveness of investments in spent nuclear fuel reprocessing

Evaluation of the effectiveness of investments in spent nuclear fuel reprocessing

The article presents an economic and analytical model that evaluates various criteria for the effectiveness of investments in spent nuclear fuel reprocessing plants at given capital, operating, and decommissioning costs, as well as expected project implementation deadlines. The model also solves the inverse problem of determining the requirements for plant parameters based on the criteria of investment effectiveness. The results of the calculation of the most important of these parameters, including the internal rate of return, the discounted payback period, and the levelized cost of reprocessing spent nuclear fuel, are presented. The mathematical definition of the net present value, representing the main criterion, depends on the plant capacity, which varies from 200 to 3000 t of fuel per year. The estimated conditions under which the net present value of reprocessing spent nuclear fuel does not exceed $1000/kg are presented.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Atomic Energy
Atomic Energy 工程技术-核科学技术
CiteScore
1.00
自引率
20.00%
发文量
100
审稿时长
4-8 weeks
期刊介绍: Atomic Energy publishes papers and review articles dealing with the latest developments in the peaceful uses of atomic energy. Topics include nuclear chemistry and physics, plasma physics, accelerator characteristics, reactor economics and engineering, applications of isotopes, and radiation monitoring and safety.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信